{"id":88573,"date":"2024-10-18T06:56:28","date_gmt":"2024-10-18T06:56:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asce-9780784476840-2012\/"},"modified":"2024-10-24T20:20:04","modified_gmt":"2024-10-24T20:20:04","slug":"asce-9780784476840-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asce\/asce-9780784476840-2012\/","title":{"rendered":"ASCE 9780784476840 2012"},"content":{"rendered":"

Water Control Gates: Guidelines for Inspection and Evaluation provides information and techniques for assessing water control gates, focusing particularly on those controlling reservoirs impounded by a dam.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nCover <\/td>\n<\/tr>\n
4<\/td>\nTable of Contents <\/td>\n<\/tr>\n
8<\/td>\n1 Introduction
1.1 Purpose of the guide <\/td>\n<\/tr>\n
9<\/td>\n1.2 Background <\/td>\n<\/tr>\n
10<\/td>\n1.3 Scope of the document <\/td>\n<\/tr>\n
11<\/td>\n1.4 Definition of terms <\/td>\n<\/tr>\n
12<\/td>\n1.5 Referenced standards
1.6 Participating organizations <\/td>\n<\/tr>\n
13<\/td>\n1.7 The original task committee
1.8 Reformulated committee <\/td>\n<\/tr>\n
14<\/td>\n1.9 Interim reviews and blue ribbon committee review <\/td>\n<\/tr>\n
15<\/td>\n1.10 Acknowledgments <\/td>\n<\/tr>\n
16<\/td>\n2 Gate Descriptions and Operating Systems
2.1 Introduction
2.2 Description of gates <\/td>\n<\/tr>\n
20<\/td>\n2.3 Gate materials <\/td>\n<\/tr>\n
25<\/td>\n2.4 Description of gate types <\/td>\n<\/tr>\n
82<\/td>\n2.5 Gate sealing systems <\/td>\n<\/tr>\n
91<\/td>\n2.6 Gate operating systems <\/td>\n<\/tr>\n
110<\/td>\n2.7 Auxiliary systems for gates <\/td>\n<\/tr>\n
113<\/td>\n3 Gate Operation
3.1 Introduction
3.2 Operational plan and water control manual <\/td>\n<\/tr>\n
115<\/td>\n3.3 Staffing <\/td>\n<\/tr>\n
117<\/td>\n3.4 Gate characteristics
3.5 Gate controls <\/td>\n<\/tr>\n
121<\/td>\n3.6 Hydraulic capacities and gate sequencing <\/td>\n<\/tr>\n
141<\/td>\n3.7 Loss of outflow capacity <\/td>\n<\/tr>\n
150<\/td>\n3.8 Non-routine operation <\/td>\n<\/tr>\n
152<\/td>\n3.9 Maintenance and inspections
3.10 Emergency action plans <\/td>\n<\/tr>\n
154<\/td>\n3.11 Training <\/td>\n<\/tr>\n
155<\/td>\n3.12 Other <\/td>\n<\/tr>\n
156<\/td>\n4 Maintenance
4.1 Maintenance manual <\/td>\n<\/tr>\n
160<\/td>\n4.2 Maintenance schedule <\/td>\n<\/tr>\n
161<\/td>\n4.3 Routine maintenance <\/td>\n<\/tr>\n
177<\/td>\n4.4 Non-routine maintenance
4.5 Major repair actions <\/td>\n<\/tr>\n
178<\/td>\n4.6 Maintenance logs\/records <\/td>\n<\/tr>\n
179<\/td>\n5 Inspection Overview and Preparation
5.1 Introduction <\/td>\n<\/tr>\n
180<\/td>\n5.2 Gate and operating system inspections <\/td>\n<\/tr>\n
187<\/td>\n5.3 Pre-inspection preparation <\/td>\n<\/tr>\n
195<\/td>\n5.4 Personnel safety <\/td>\n<\/tr>\n
200<\/td>\n6 Visual Inspection of Structural Aspects of Gates
6.1 Introduction
6.2 Typical items to be inspected for gates <\/td>\n<\/tr>\n
210<\/td>\n6.3 Inspection items specific to individual gate types <\/td>\n<\/tr>\n
221<\/td>\n7 Visual Inspection of Gate Operating Systems
7.1 Introduction
7.2 Common hoist components <\/td>\n<\/tr>\n
222<\/td>\n7.3 Visual inspection overview <\/td>\n<\/tr>\n
223<\/td>\n7.4 Support system inspection <\/td>\n<\/tr>\n
231<\/td>\n7.5 Electrical and control inspections <\/td>\n<\/tr>\n
242<\/td>\n7.6 Mechanical inspection <\/td>\n<\/tr>\n
260<\/td>\n7.7 Hydraulic hoists <\/td>\n<\/tr>\n
262<\/td>\n7.8 Pneumatic hoists <\/td>\n<\/tr>\n
263<\/td>\n7.9 Monorail and overhead crane structural inspection <\/td>\n<\/tr>\n
265<\/td>\n7.10 Other inspections <\/td>\n<\/tr>\n
270<\/td>\n8 Gate System Performance Testing
8.1 Introduction
8.2 Type and frequency of testing <\/td>\n<\/tr>\n
273<\/td>\n8.3 Pre-test preparation <\/td>\n<\/tr>\n
275<\/td>\n8.4 Gate test procedures <\/td>\n<\/tr>\n
283<\/td>\n8.5 Gate operating systems <\/td>\n<\/tr>\n
290<\/td>\n8.6 Control and warning systems
8.7 Auxiliary power systems <\/td>\n<\/tr>\n
295<\/td>\n8.8 Miscellaneous tests
8.9 Documentation <\/td>\n<\/tr>\n
298<\/td>\n9 Evaluation
9.1 General <\/td>\n<\/tr>\n
299<\/td>\n9.2 Loads and load combinations <\/td>\n<\/tr>\n
315<\/td>\n9.3 Evaluation criteria <\/td>\n<\/tr>\n
321<\/td>\n9.4 Structural evaluation <\/td>\n<\/tr>\n
328<\/td>\n9.5 Operating system evaluation <\/td>\n<\/tr>\n
330<\/td>\n9.6 Functional evaluation <\/td>\n<\/tr>\n
338<\/td>\n9.7 Potential failure mode analysis <\/td>\n<\/tr>\n
342<\/td>\nAppendix A: Inspection Checklists <\/td>\n<\/tr>\n
349<\/td>\nAppendix B: Gate and Operating Equipment Inspection and Testing Procedures <\/td>\n<\/tr>\n
367<\/td>\nAppendix C: Crane Inspection Activities <\/td>\n<\/tr>\n
376<\/td>\nAppendix D: Curvilinear Pressures <\/td>\n<\/tr>\n
379<\/td>\nAppendix E: PFM Examples <\/td>\n<\/tr>\n
388<\/td>\nReferences <\/td>\n<\/tr>\n
395<\/td>\nBibliography <\/td>\n<\/tr>\n
400<\/td>\nIndex
A
B
C <\/td>\n<\/tr>\n
401<\/td>\nD
E
F <\/td>\n<\/tr>\n
402<\/td>\nG
H
I
J
L <\/td>\n<\/tr>\n
403<\/td>\nM
N
O <\/td>\n<\/tr>\n
404<\/td>\nP
Q
R <\/td>\n<\/tr>\n
405<\/td>\nS
T <\/td>\n<\/tr>\n
406<\/td>\nU
V
W <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Water Control Gates – Guidelines for Inspection and Evaluation<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASCE<\/b><\/a><\/td>\n2012<\/td>\n406<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":88574,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2660],"product_tag":[],"class_list":{"0":"post-88573","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asce","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/88573","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/88574"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=88573"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=88573"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=88573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}