{"id":194684,"date":"2024-10-19T12:21:13","date_gmt":"2024-10-19T12:21:13","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-116-2018\/"},"modified":"2024-10-25T04:52:15","modified_gmt":"2024-10-25T04:52:15","slug":"ieee-c37-116-2018","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-116-2018\/","title":{"rendered":"IEEE C37.116 2018"},"content":{"rendered":"

Revision Standard – Active. The application of protective relays on transmission-line series capacitor banks is covered. Ample discussion of the protection and control issues related to series capacitor bank installations is provided to the reader. Specific examples related to protective functions and testing procedures are provided.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std C37.116\u2122-2018 Front cover <\/td>\n<\/tr>\n
2<\/td>\nTitle page <\/td>\n<\/tr>\n
4<\/td>\nImportant Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n
7<\/td>\nParticipants <\/td>\n<\/tr>\n
9<\/td>\nIntroduction <\/td>\n<\/tr>\n
10<\/td>\nContents <\/td>\n<\/tr>\n
12<\/td>\nList of Figures <\/td>\n<\/tr>\n
14<\/td>\nList of Tables <\/td>\n<\/tr>\n
15<\/td>\n1.\u2002Overview
1.1\u2002Background
1.2\u2002Scope
1.3\u2002Purpose <\/td>\n<\/tr>\n
16<\/td>\n2.\u2002Normative references
3.\u2002Definitions, acronyms, and abbreviations
3.1\u2002Definitions <\/td>\n<\/tr>\n
17<\/td>\n3.2\u2002Acronyms and abbreviations <\/td>\n<\/tr>\n
18<\/td>\n4.\u2002Preliminary considerations
4.1\u2002Major equipment considerations <\/td>\n<\/tr>\n
24<\/td>\n4.2\u2002System conditions <\/td>\n<\/tr>\n
27<\/td>\n4.3\u2002Duty cycle <\/td>\n<\/tr>\n
28<\/td>\n4.4\u2002Multiple segment series capacitors <\/td>\n<\/tr>\n
30<\/td>\n4.5\u2002Single-phase trip\/reclose considerations <\/td>\n<\/tr>\n
31<\/td>\n4.6\u2002Impact on line protection
4.7\u2002Line protection and series capacitor protection\/control interaction <\/td>\n<\/tr>\n
33<\/td>\n5.\u2002Protective functions
5.1\u2002Protection philosophy <\/td>\n<\/tr>\n
36<\/td>\n5.2\u2002MOV protection <\/td>\n<\/tr>\n
43<\/td>\n5.3\u2002Capacitor protection <\/td>\n<\/tr>\n
48<\/td>\n5.4\u2002Bypass gap protection <\/td>\n<\/tr>\n
49<\/td>\n5.5\u2002Platform fault protection <\/td>\n<\/tr>\n
50<\/td>\n5.6\u2002Bypass switch protection <\/td>\n<\/tr>\n
51<\/td>\n5.7\u2002Discharge current-limiting reactor protection
5.8\u2002Sample _Sample_protection_scheme scheme <\/td>\n<\/tr>\n
52<\/td>\n6.\u2002Platform power and signal transmission <\/td>\n<\/tr>\n
53<\/td>\n6.1\u2002Current transformer supply
6.2\u2002Coupling capacitor voltage transformer (CCVT) supply
6.3\u2002Optically powered supply <\/td>\n<\/tr>\n
54<\/td>\n6.4\u2002Battery supply
6.5\u2002Power supplies specific to bypass gap firing circuits
6.6\u2002Platform information transmission methods <\/td>\n<\/tr>\n
55<\/td>\n7.\u2002Control and monitoring functions
7.1\u2002Control actions <\/td>\n<\/tr>\n
58<\/td>\n7.2\u2002Monitoring <\/td>\n<\/tr>\n
59<\/td>\n8.\u2002Additional protection considerations
8.1\u2002Environmental <\/td>\n<\/tr>\n
60<\/td>\n8.2\u2002Insulation
8.3\u2002Electromagnetic interference (EMI)
8.4\u2002Bypass gap firing circuits
9.\u2002Testing <\/td>\n<\/tr>\n
61<\/td>\n9.1\u2002Pre-energization tests <\/td>\n<\/tr>\n
62<\/td>\n9.2\u2002Energization sequence tests and operation tests <\/td>\n<\/tr>\n
64<\/td>\n9.3\u2002Capacitor unbalance test <\/td>\n<\/tr>\n
65<\/td>\n9.4\u2002Immunity test
9.5\u2002Staged fault tests <\/td>\n<\/tr>\n
68<\/td>\nAnnex\u00a0A (informative) Low-frequency transients <\/td>\n<\/tr>\n
72<\/td>\nAnnex\u00a0B (informative) Typical economic evaluation for a redundant protection and control unit <\/td>\n<\/tr>\n
73<\/td>\nAnnex\u00a0C (informative) Example utility calculations for MOV protection functions <\/td>\n<\/tr>\n
76<\/td>\nAnnex\u00a0D (informative) Summary of suggested alarms\/indications\/control action <\/td>\n<\/tr>\n
77<\/td>\nAnnex\u00a0E (informative) Actual staged fault test results <\/td>\n<\/tr>\n
86<\/td>\nAnnex\u00a0F (informative) Bibliography <\/td>\n<\/tr>\n
88<\/td>\nBack cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Guide for Protective Relay Application to Transmission-Line Series Capacitor Banks<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2018<\/td>\n88<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":194689,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-194684","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/194684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/194689"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=194684"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=194684"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=194684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}