{"id":140877,"date":"2024-10-19T08:11:01","date_gmt":"2024-10-19T08:11:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/asme-b30-8-2015\/"},"modified":"2024-10-25T00:23:47","modified_gmt":"2024-10-25T00:23:47","slug":"asme-b30-8-2015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/asme\/asme-b30-8-2015\/","title":{"rendered":"ASME B30.8 2015"},"content":{"rendered":"

B30.8 applies to cranes and derricks mounted on barges or pontoons. Floating cranes are convertible for excavation service and other uses that are categorically not considered to be lifting service. The requirements of this volume are applicable only to floating cranes and floating derricks used for vertical lifting and lowering of freely suspended unguided loads.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
4<\/td>\nCONTENTS <\/td>\n<\/tr>\n
6<\/td>\nFOREWORD <\/td>\n<\/tr>\n
8<\/td>\nASME B30 COMMITTEE ROSTER <\/td>\n<\/tr>\n
10<\/td>\nINTRODUCTION
SECTION I: SCOPE
SECTION II: SCOPE EXCLUSIONS
SECTION III: PURPOSE
SECTION IV: USE BY REGULATORY AGENCIES
SECTION V: EFFECTIVE DATE <\/td>\n<\/tr>\n
11<\/td>\nSECTION VI: REQUIREMENTS AND RECOMMENDATIONS
SECTION VII: USE OF MEASUREMENT UNITS
SECTION VIII: REQUESTS FOR REVISION
SECTION IX: REQUESTS FOR INTERPRETATION
SECTION X: ADDITIONAL GUIDANCE <\/td>\n<\/tr>\n
13<\/td>\nSUMMARY OF CHANGES <\/td>\n<\/tr>\n
16<\/td>\nChapter 8-0 Scope, Definitions, Personnel Competence, Translations, and References
SECTION 8-0.1: SCOPE OF ASME B30.8
SECTION 8-0.2: DEFINITIONS <\/td>\n<\/tr>\n
17<\/td>\nFigures
\n
Fig. 8-0.1-1 Floating Crane
Fig. 8-0.1-2 Barge-Mounted Shearleg
Fig. 8-0.1-3 Barge-Mounted Land Crane <\/td>\n<\/tr>\n
18<\/td>\nFig. 8-0.1-4 Floating Stiffleg Derrick
Fig. 8-0.1-5 Floating A-Frame Derrick <\/td>\n<\/tr>\n
19<\/td>\nSECTION 8-0.3: PERSONNEL COMPETENCE <\/td>\n<\/tr>\n
20<\/td>\nSECTION 8-0.4: TRANSLATIONS
SECTION 8-0.5: REFERENCES
Fig. 8-0.2-1 Reach for Floating Cranes <\/td>\n<\/tr>\n
22<\/td>\nChapter 8-1 Construction and Installation
SECTION 8-1.1: LOAD RATINGS AND MARKINGS
8-1.1.1 Basis
8-1.1.2 Rated Loads
8-1.1.3 Rated Load Marking
SECTION 8-1.2: CONSTRUCTION AND LOADING CONDITIONS
8-1.2.1 Structural Competence
8-1.2.2 Operational Criteria <\/td>\n<\/tr>\n
23<\/td>\nSECTION 8-1.3: GENERAL REQUIREMENTS FOR PONTOONS AND BARGES
8-1.3.1 Machinery and Electrical Equipment
8-1.3.2 Compartments
8-1.3.3 Manholes and Hatches <\/td>\n<\/tr>\n
24<\/td>\n8-1.3.4 Fittings
8-1.3.5 Life Preservers
8-1.3.6 Rescue Skiff
SECTION 8-1.4: GENERAL REQUIREMENTS FOR CRANES AND DERRICKS
8-1.4.1 Guards
8-1.4.2 Lubrication
8-1.4.3 Operational Aids
8-1.4.4 Miscellaneous Equipment
SECTION 8-1.5: VERTICAL CLEARANCE <\/td>\n<\/tr>\n
25<\/td>\nSECTION 8-1.6: BOOM HOIST LUFFING HOIST AND LOAD HOIST MECHANISMS
8-1.6.1 Boom Hoist Luffing Hoist
8-1.6.2 Load Hoist <\/td>\n<\/tr>\n
26<\/td>\nSECTION 8-1.7: SWING MECHANISM
8-1.7.1 Swing Control
8-1.7.2 Swing Brake and Locking Device
SECTION 8-1.8: CONTROLS
8-1.8.1 General
8-1.8.2 Power Plant Control
8-1.8.3 Control Forces and Movements
8-1.8.4 Engine Clutch
8-1.8.5 Electric Drive Control Panels
8-1.8.6 Resistors
8-1.8.7 Switches <\/td>\n<\/tr>\n
27<\/td>\nSECTION 8-1.9: ROPES AND REEVING ACCESSORIES
8-1.9.1 Rope Design Factors
8-1.9.2 Ropes: General
8-1.9.3 Reeving Accessories
8-1.9.4 Sheaves <\/td>\n<\/tr>\n
28<\/td>\n8-1.9.5 Sheave Sizes
8-1.9.6 Load Hooks, Ball Assemblies, and Load Blocks
SECTION 8-1.10: CABS
8-1.10.1 Construction
Fig. 8-1.9.3-1 Dead-Ending Rope in a Wedge Socket <\/td>\n<\/tr>\n
29<\/td>\n8-1.10.2 Platforms to Cab
8-1.10.3 Access to Cab
8-1.10.4 Cab Roof
8-1.10.5 Exhaust Gases
SECTION 8-1.11: GENERAL REQUIREMENTS FOR BOOMS
8-1.11.1 Booms <\/td>\n<\/tr>\n
30<\/td>\nChapter 8-2 Inspection, Testing, and Maintenance
SECTION 8-2.1: INSPECTION: GENERAL
8-2.1.1 Inspection Classifications
8-2.1.2 Frequent Inspection
8-2.1.3 Periodic Inspection <\/td>\n<\/tr>\n
31<\/td>\n8-2.1.4 Cranes or Derricks Not in Regular Use
8-2.1.5 Inspection Records
8-2.1.6 Operational Aids
SECTION 8-2.2: TESTING
8-2.2.1 Operational Tests <\/td>\n<\/tr>\n
32<\/td>\n8-2.2.2 Load Test
SECTION 8-2.3: MAINTENANCE
8-2.3.1 Preventive Maintenance
8-2.3.2 Maintenance Procedure
8-2.3.3 Adjustments and Repairs <\/td>\n<\/tr>\n
33<\/td>\n8-2.3.4 Lubrication
SECTION 8-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE
8-2.4.1 Frequent Inspection
8-2.4.2 Periodic Inspection
8-2.4.3 Rope Replacement <\/td>\n<\/tr>\n
34<\/td>\n8-2.4.4 Ropes Not in Regular Use
8-2.4.5 Inspection Records
8-2.4.6 Rope Maintenance
Fig. 8-2.4.1-1 Core Failure in 19 \ufffd 7 Rotation-Resistant Rope <\/td>\n<\/tr>\n
35<\/td>\nChapter 8-3 Operation
SECTION 8-3.1: QUALIFICATIONS AND RESPONSIBILITIES
8-3.1.1 Operators
8-3.1.2 Qualifications for Operators
8-3.1.3 Responsiblities
8-3.1.3.1 Responsibilities of the Crane Owner and Crane User.
8-3.1.3.1.1 Crane Owner. <\/td>\n<\/tr>\n
36<\/td>\n8-3.1.3.1.2 Crane User.
8-3.1.3.2 Responsibilities of Site Supervisor and Lift Director.
8-3.1.3.2.1 Site Supervisor. <\/td>\n<\/tr>\n
37<\/td>\n8-3.1.3.2.2 Lift Director.
8-3.1.3.3 Responsibilities of Crane Operators. <\/td>\n<\/tr>\n
38<\/td>\nSECTION 8-3.2: OPERATING PRACTICES
8-3.2.1 Load Weight
8-3.2.2 Operational Aids
8-3.2.3 Attaching the Load <\/td>\n<\/tr>\n
39<\/td>\n8-3.2.4 Moving the Load
8-3.2.5 Holding the Load
8-3.2.6 Use of Winch Heads
8-3.2.7 Securing Booms
8-3.2.8 Personnel Access
8-3.2.9 Personnel Lifting <\/td>\n<\/tr>\n
40<\/td>\nSECTION 8-3.3: SIGNALS
8-3.3.1 Standard Signals
8-3.3.2 Hand Signals
8-3.3.3 Bell Signals
8-3.3.4 Special Signals
8-3.3.5 Instructions
SECTION 8-3.4: MISCELLANEOUS
8-3.4.1 Fire Extinguishers
8-3.4.2 Refueling
8-3.4.3 Operating Near Electric Power Lines <\/td>\n<\/tr>\n
41<\/td>\n8-3.4.4 Cab or Operating Enclosure <\/td>\n<\/tr>\n
42<\/td>\nFig. 8-3.3.2-1 Standard Hand Signals for Controlling Crane and Derrick Operations <\/td>\n<\/tr>\n
45<\/td>\nFig. 8-3.4.3-1 Danger Zone for Cranes, Derricks, and Lifted Loads Operating Nea rElectrical Transmission Lines <\/td>\n<\/tr>\n
46<\/td>\nTable
Table 8-3.4.3-1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered <\/td>\n<\/tr>\n
48<\/td>\nASME B30.8 INTERPRETATIONS <\/td>\n<\/tr>\n
49<\/td>\nInterpretation: 8-9 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

ASME B30.8 – 2015: Floating Cranes and Floating Derricks<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASME<\/b><\/a><\/td>\n2015<\/td>\n50<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":140878,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2643],"product_tag":[],"class_list":{"0":"post-140877","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-asme","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/140877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/140878"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=140877"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=140877"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=140877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}