{"id":136444,"date":"2024-10-19T07:52:22","date_gmt":"2024-10-19T07:52:22","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c62-92-4-2015\/"},"modified":"2024-10-25T00:02:19","modified_gmt":"2024-10-25T00:02:19","slug":"ieee-c62-92-4-2015","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c62-92-4-2015\/","title":{"rendered":"IEEE C62.92.4 2015"},"content":{"rendered":"
Revision Standard – Active. The neutral grounding of single- and three-phase ac electric-utility primary distribution systems with nominal voltages in the range of 2.4 kV 34.5 kV is addressed. Classes of distribution-systems grounding are defined. Basic considerations in distribution-system grounding concerning economics, control of temporary overvoltages, control of ground-fault currents, and ground relaying are addressed. Also considered is the use of grounding transformers, grounding of high-voltage neutral of wye-delta distribution transformers, and interconnection of primary and secondary neutrals of distribution transformers.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C62.92.4\u2122-2014 Front Cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Important Notice 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions 3.2 Acronyms and abbreviations <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4. Classes of distribution-systems grounding 4.1 General 4.2 Ungrounded systems 4.3 Grounded systems <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.4 Use of grounding transformers 5. Basic considerations in distribution-system grounding 5.1 Economics <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.2 Control of temporary overvoltages (TOVs) <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.3 Control of ground-fault currents <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5.4 Ground-fault protection <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 6. Special considerations in distribution-system grounding 6.1 Coordination with communication facilities <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.2 Use of grounding transformers <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 6.3 Grounding of high-voltage neutral of wye-delta distribution transformers 6.4 Interconnection of primary and secondary neutrals of distribution transformers <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex A (informative) Specifying a grounding transformer A.1 Introduction <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | A.2 Grounding transformer problem A.3 Grounding transformer solution <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | A.4 Grounding effectiveness <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | A.5 Multi-grounded neutral system A.6 Continuous rating <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | Annex B (informative) Techniques for interconnecting primary and secondary neutrals B.1 Background B.2 Problem <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | B.3 Solution <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex C (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Back Cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Guide for the Application of Neutral Grounding in Electrical Utility Systems–Part IV: Distribution<\/b><\/p>\n |