ASTM-C1153:1997 Edition
$40.63
C1153-97 Standard Practice for Location of Wet Insulation in Roofing Systems Using Infrared Imaging
Published By | Publication Date | Number of Pages |
ASTM | 1997 | 6 |
ASTM C1153-97
Historical Standard: Standard Practice for Location of Wet Insulation in Roofing Systems Using Infrared Imaging
ASTM C1153
Scope
1.1 This practice applies to techniques that employ infrared imaging at night to determine the location of wet insulation in roofing systems that have insulation above the deck in contact with the waterproofing. This practice includes ground-based and aerial inspections.
1.2 This practice addresses criteria for infrared equipment such as minimum resolvable temperature difference, spectral range, instantaneous field of view, and field of view.
1.3 This practice addresses meteorological conditions under which infrared inspections should be performed.
1.4 This practice addresses the effect of roof construction, material differences, and roof conditions on infrared inspections.
1.5 This practice addresses operating procedures, operator qualifications, and operating practices.
1.6 This practice also addresses verification of infrared data using invasive test methods.
1.7 The values stated in SI units are to be regarded as standard.
1.8 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Specific precautionary statements are given in Notes 1, 2, and 3.
Keywords
infrared; in-situ; moisture; roofing systems; thermal insulation
ICS Code
ICS Number Code n/a
DOI: 10.1520/C1153-97
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Scope Referenced Documents Terminology |
2 | Significance and Use Infrared Survey Techniques Instrument Requirements |
3 | Level of Knowledge Limitations (Applicability of Constructions) FIG. 1 |
4 | Significant Environmental Parameters Required Conditions Inspection Procedures |
5 | Data Interpretation Verification Report |
6 | Precision and Bias Keywords |