{"id":439068,"date":"2024-10-20T08:07:00","date_gmt":"2024-10-20T08:07:00","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-14972-62023\/"},"modified":"2024-10-26T15:12:39","modified_gmt":"2024-10-26T15:12:39","slug":"bs-en-14972-62023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-14972-62023\/","title":{"rendered":"BS EN 14972-6:2023"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions 4 General requirements <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 5 Fuel packages 5.1 General <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.2 False ceiling \/ false floor mock-up requirements 5.3 Cable trays 5.4 Cables <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.5 Conditioning of the fuel load 5.6 Ignition source 6 Test arrangement 6.1 Reference sprinkler requirements 6.1.1 General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 6.1.2 Reference sprinkler tests 6.2 Water mist system requirements 7 Test equipment requirements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 8 Instrumentation requirements 8.1 General 8.2 Temperature 8.3 Pressure <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 8.4 Time 9 Test criteria 9.1 General 9.2 Fire tests <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 9.3 Evaluation of test results 10 Test report <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 1 National Annex NA (informative) Further recommendations and guidance on the application of BS EN 14972-10. 1.1 General 1.2 Hazard evaluation 1.3 Limits of application 1.4 Ventilation conditions 1.5 Obstructions <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 1.6 Test report <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Blank Page <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Fixed firefighting systems. Water mist systems – Test protocol for false floors and false ceilings for automatic nozzle systems<\/b><\/p>\n |