IEEE 1031 2011
$74.75
IEEE Guide for the Functional Specification of Transmission Static Var Compensators
Published By | Publication Date | Number of Pages |
IEEE | 2011 | 89 |
Revision Standard – Active. An approach to preparing a specification for a transmission static var compensator is documented by this guide. The intention of this document is to serve as a base specification with an informative annex provided to allow users to modify or develop specific clauses to meet a particular application.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 1031-2011 Front Cover |
3 | Title Page |
6 | Introduction Notice to users Laws and regulations Copyrights Updating of IEEE documents |
7 | Errata Interpretations Patents |
8 | Participants |
10 | Contents |
13 | Important Notice 1. Overview 1.1 Scope 1.2 Purpose |
14 | 1.3 Application 1.4 Word usage 2. Normative references |
15 | 3. Definitions, acronyms, and abbreviations 3.1 Definitions |
17 | 3.2 Acronyms and abbreviations |
18 | 4. SVC project description 5. Scope of supply and schedule |
19 | 5.1 Scope of supply 5.2 Equipment, materials, and services furnished by the user |
20 | 5.3 Schedule 6. Site and environmental data 7. Power system characteristics |
21 | 8. Main SVC characteristics |
22 | 8.1 SVC rating |
24 | 8.2 Control objectives 8.3 Harmonic performance |
26 | 8.4 Telephone and radio interference |
27 | 8.5 Audible noise 8.6 Loss evaluation |
29 | 8.7 SVC availability and reliability |
30 | 9. Main components—required functions and features |
31 | 9.1 Thyristor valves |
32 | 9.2 Thyristor valve cooling system |
33 | 9.3 Control equipment and operator interface |
34 | 9.4 Monitoring and protection |
36 | 9.5 Reactors 9.6 Capacitor banks 9.7 Power transformers |
37 | 9.8 Disconnect and grounding switches 9.9 Auxiliary power supplies 10. Spares 10.1 Spares strategy 10.2 Spare parts storage 10.3 Spare parts accounting |
38 | 11. Engineering studies |
39 | 11.1 Information submitted with bid 11.2 Premanufacturing engineering and design verification studies |
41 | 11.3 Postcommissioning studies 12. Tests 12.1 Factory tests of valves 12.2 Factory tests of controls 12.3 Tests of other components 12.4 Field tests |
42 | 13. Documentation 14. Training |
43 | 15. Balance of plant 15.1 Buildings and structures 15.2 Fire protection 15.3 Site requirements and conditions |
45 | Annex A (informative) Bibliography |
47 | Annex B (informative) Notes for a functional specification |
85 | Annex C (normative) Method of calculating thyristor valve losses |