BSI PD CLC/TS 50459-3:2021
$198.66
Railway applications. Communication, signalling and processing systems. European Rail Traffic Management System – Ergonomic arrangements of non ETCS information
Published By | Publication Date | Number of Pages |
BSI | 2021 | 62 |
This document describes from an ergonomic point of view how non ETCS information are arranged and displayed on the CCD. More specifically, it covers information that is not within the scope of ERA document ERA_ERTMS_015560. This document describes two possible technologies for implementing the ETCS DMI namely touch screen and soft key. National systems not integrated within ETCS DMI are not within the scope of this document. Redundancy concepts are not within the scope of this document.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
8 | European foreword |
9 | Introduction |
10 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviated terms 3.1 Terms and definitions |
11 | 3.2 Abbreviated terms 4 General principles 4.1 Purpose of document 4.1.1 General |
12 | 4.1.2 Ergonomic arrangements of areas of the ETCS layout Figure 1 — The sub areas of the ERTMS/ETCS layout (touch screen technology) |
13 | Figure 2 — The sub areas of the ERTMS/ETCS layout (soft key technology) 4.1.3 ETCS objects 4.1.4 Non ETCS objects 4.2 Audible information for non ETCS systems 4.3 Data entry 5 Non ETCS symbols 5.1 General requirements for unified DMI service |
14 | 5.2 Symbols for other train functions |
15 | Annex A (informative) Integration of NTC and/or other on-board systems A.1 Usage of screen areas A.2 NTC LZB/PZB A.2.1 LZB/PZB – Scope and field of specification A.2.2 LZB/PZB – Overview |
16 | Figure A.1 — The sub areas of the LZB/PZB layout (touch screen technology) |
17 | Figure A.2 — The sub areas of the LZB/PZB layout (soft key technology) A.2.3 LZB/PZB – Positioning onto the grid array A.2.3.1 LZB/PZB – Area description |
18 | A.2.3.2 LZB/PZB – Speed and distance monitoring – supervision status A.2.4 LZB/PZB – ETCS and NTC information shown on a LZB/PZB default window A.2.4.1 LZB/PZB – Introduction A.2.4.2 LZB/PZB – ETCS objects A.2.4.3 LZB/PZB – NTC objects A.2.4.3.1 LZB/PZB – General |
19 | A.2.4.3.2 LZB/PZB – Indicators PLZB_C1/2/3/4/5/6 A.2.4.3.3 LZB/PZB – Supervision information A.2.4.3.3.1 LZB/PZB – Current train speed pointer A.2.4.3.3.2 LZB/PZB – Vperm of LZB A.2.4.3.3.3 LZB/PZB – Vtarget of LZB A.2.4.3.3.4 LZB/PZB – Vperm of ASC A.2.4.3.3.5 LZB/PZB – Vperm of ‘Cruise Control’ A.2.5 LZB/PZB – Sub-level windows A.2.5.1 LZB/PZB – Introduction Table A.1 — LZB/PZB terms in figures |
20 | Table A.2 — PZB terms in figures A.2.5.2 LZB/PZB – Menu windows A.2.5.2.1 LZB/PZB – Data entry windows Figure A.3 — LZB/PZB data entry window (1st window) in touch screen technology |
21 | Figure A.4 — LZB/PZB data entry window (1st window) in softkey technology A.2.5.2.2 LZB/PZB – Data validation windows Figure A.5 — LZB/PZB data validation window in touch screen technology |
22 | Figure A.6 — LZB/PZB data validation window in softkey technology A.2.5.2.3 LZB/PZB – Data view window |
23 | Figure A.7 — LZB/PZB data view window in touch screen technology Figure A.8 — LZB/PZB data view window in softkey technology |
24 | A.2.6 LZB/PZB – Symbols A.2.6.1 LZB/PZB – Level symbols Table A.3 — Level symbols for LZB/PZB A.2.6.2 LZB/PZB – Mode symbols A.2.6.3 LZB/PZB – Status symbols Table A.4 — Status symbols for LZB/PZB |
26 | A.2.6.4 LZB/PZB – Orders and announcement of track condition symbols A.2.6.5 LZB/PZB – Planning information symbols A.2.6.6 LZB/PZB – Navigation symbols A.2.6.7 LZB/PZB – Supervision symbols |
27 | Table A.5 — LZB supervision symbols A.2.6.8 LZB/PZB – Driver request symbols A.2.7 LZB/PZB – Audible information A.2.7.1 LZB/PZB – General A.2.7.2 PLZB_S1 – SCHNARRE A.2.7.3 PLZB_S2 – HUPE A.2.7.4 PLZB_S3 – EMERGENCY_BRAKE_INTERVENTION |
28 | A.2.8 LZB/PZB – List of system status messages A.3 UK National Train Control A.4 NTC ATC2 A.4.1 ATC2 – Scope and field of specification A.4.2 ATC2 – Overview Figure A.9 — The sub areas of the ATC2 layout (touch screen technology) |
29 | Figure A.10 — The sub areas of the ATC2 layout (soft key technology) A.4.3 ATC2 – Area description |
30 | A.4.4 ATC2 – Sub-level windows A.4.4.1 ATC2 – Introduction Table A.6 — ATC2 terms in figures A.4.4.2 ATC2 – NTC objects A.5 NTC SCMT A.5.1 SCMT – Scope and field of specification |
31 | A.5.2 SCMT – Overview Figure A.11 — The sub areas of the SCMT layout (touch screen technology) A.5.3 SCMT – Area description |
32 | Figure A.12 — SCMT arrangement of area D |
33 | A.5.4 SCMT – ETCS and NTC Information shown on an ETCS default window Figure A.13 — SCMT in mode HS before transistion A.5.5 SCMT – Sub-Level Windows A.5.5.1 SCMT – Introduction Table A.7 — SCMT terms in figures A.5.5.2 SCMT – ETCS objects A.5.5.3 SCMT – NTC objects A.5.5.4 SCMT – Windows |
34 | Figure A.14 — SCMT window in touch screen technology A.5.5.5 SCMT – VMC data entry window |
35 | Figure A.15 — SCMT VMC data entry window in touch screen technology A.5.5.6 SCMT – OM window |
36 | Figure A.16 — SCMT OM window in touch screen technology A.5.5.7 SCMT – ATTO window |
37 | Figure A.17 — SCMT ATTO window in touch screen technology A.5.5.8 SCMT – TRIP window |
38 | Figure A.18 — SCMT TRIP window in touch screen technology A.5.5.9 SCMT – Announcement window |
39 | Figure A.19 — SCMT in mode HS before transistion A.5.6 SCMT – Symbols A.5.6.1 SCMT – Level symbols Table A.8 — Level symbols for SCMT (C8) A.5.6.2 SCMT – Mode symbols |
40 | Table A.9 — Mode symbols for SCMT (B8 / B9) Table A.10 — Symbols for SCMT_D15 .. 39 |
43 | A.5.6.3 SCMT – Touch key symbols Table A.11 — Symbols for touch keys (SCMT_G6..10) |
45 | A.5.6.4 SCMT – Orders and announcements A.5.6.5 SCMT – Planning information symbols A.5.6.6 SCMT – Navigation symbols A.5.6.7 SCMT – Settings symbols A.5.6.8 SCMT – Driver request symbols |
46 | Figure A.20 — SCMT brake release example window in touch screen technology Figure A.21 — SCMT warning acknowledgement example window in touch screen technology A.5.7 SCMT – Audible information |
47 | A.5.8 SCMT – List of system status messages A.6 NTC SHP A.6.1 SHP – Scope and field of specification A.6.2 SHP – Overview Figure A.22 — The sub areas of the SHP layout (touch screen technology) |
48 | Figure A.23 — The sub areas of the SHP layout (soft key technology) A.6.3 SHP – Area description A.6.4 SHP – ETCS and NTC information shown on a SHP default window A.6.4.1 SHP – ETCS objects |
49 | A.6.4.2 SHP – NTC objects A.6.4.2.1 SHP – General A.6.4.2.2 SHP – Indicators A.6.5 SHP – Sub-level windows A.6.5.1 SHP – Introduction A.6.5.2 SHP – Default window Figure A.24 — SHP default window in touch screen technology |
50 | Figure A.25 — SHP default window in softkey technology A.6.6 SHP – Symbols A.6.6.1 SHP – Level symbols Table A.12 — Level symbols for SHP A.6.6.2 SHP – Mode symbols A.6.6.3 SHP – Status symbols |
51 | Table A.13 — Symbols for SHP operation Table A.14 — Symbols for SHP Radio Stop A.6.6.4 SHP – Orders and announcement of Track Condition Symbols A.6.6.5 SHP – Planning information symbols A.6.6.6 SHP – Driver request symbols A.7 NTC JKV A.7.1 JKV – Scope and field of specification |
52 | A.7.2 JKV – Overview Figure A.26 — The sub areas of the JKV layout (touch screen technology) |
53 | Figure A.27 — The sub areas of the JKV layout (soft key technology) A.7.3 JKV – Area description |
55 | Annex B (informative) Sounds for NTC and/or other on-board systems B.1 General B.2 Other train functions B.2.1 S9 – Driver activity warning Table B.1 — S9 – Driver activity warning Figure B.1 — Wave of the audible information ‘Driver Activity Warning’ |
56 | B.3 NTC B.3.1 LZB/PZB audible information B.3.1.1 PLZB_S1 – SCHNARRE Table B.2 — LPZB_S1 – SCHNARRE Figure B.2 — Wave of the audible information ‘PLZB_S1 – SCHNARRE Figure B.3 — Wave of the audible information ‘LZB-SCHNARRE_DAUER |
57 | Figure B.4 — Wave of the audible information ‘LZB-SCHNARRE_INTERMIT_1 Figure B.5 — Wave of the audible information ‘LZB-SCHNARRE_INTERMIT_2 B.3.1.2 PLZB_S2 – HUPE Table B.3 — LPZB_S2 – HUPE |
58 | Figure B.6 — Wave of the audible information ‘PLZB_S2 – HUPE Figure B.7 — Wave of the audible information ‘LZB_HUPE Figure B.8 — Wave of the audible information ‘LZB_HUPE_F1 Figure B.9 — Wave of the audible information ‘LZB_HUPE_F2 B.3.1.3 PLZB_S3 – EMERGENCY_BRAKE_INTERVENTION |
59 | B.3.2 UK National Train Control audible information B.3.3 ATC2 audible information B.3.4 SCMT audible information B.3.5 SHP audible information B.3.6 JKV audible information |
60 | Bibliography |