ASME PTC 6.2 04 2004

$98.04

ASME PTC 6.2 Steam Turbines in Combined Cycles

Published By Publication Date Number of Pages
ASME 2004 114
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
FIGURES
5 TABLES
MANDATORY APPENDICES
NONMANDATORY APPENDICES
6 NOTICE
7 FOREWORD
8 COMMITTEE ROSTER
10 CORRESPONDENCE WITH THE PTC 6.2 COMMITTEE
12 Section 1 Object and Scope
1-1 OBJECT
1-2 SCOPE
1-3 UNCERTAINTY
13 Section 2 Definitions and Description of Terms
2-1 SYMBOLS
2-2 ABBREVIATIONS
2-3 DEFINITIONS
2-1 Symbols
15 Section 3 Guiding Principles
3-1 INTRODUCTION
16 3-1.2-1 Three-Pressure Reheat Steam Turbine Heat Balance
17 3-1.2-2 Two-Pressure Nonreheat Steam Turbine Heat Balance
3-1.3.2 Net Turbine Equipment Electrical Output
18 3-2 TEST PLAN
3-1.3.5 Allowable Deviations
19 3-3 PRELIMINARY TESTING
3-2.4.2 Definition of Variables for Benchmark Testing
20 3-4 ISOLATION OF THE CYCLE
21 3-5 CONDUCT OF TEST
23 3-5.5.1 Required Number of Readings
24 3-5.5.3 Uncertainty Intervals
3-5.5.1 Definitions and Notes for Fig. 3-5.5.1
25 3-6 CALCULATION AND REPORTING OF RESULTS
26 3-6.4.1 Allowable Uncertainty
27 Section 4 Instruments and Methods of Measurement
4-1 GENERAL REQUIREMENTS
28 4-1.2.3-1 Location and Type of Test Instrumentation for Combined Cycle (Triple Pressure HP/IP-LP Reheat Steam Turbine) Test Procedure
29 4-1.2.3-2 Location and Type of Test Instrumentation for Combined Cycle (Triple Pressure HP/IP-LP Reheat Steam Turbine) Test Procedure
32 4-2 PRESSURE MEASUREMENT
34 4-2.6.2-1 Five-Way Manifold
4-2.6.2-2 Water Leg Correction for Flow Measurement
35 4-3 TEMPERATURE MEASUREMENT
4-2.7.3-1 Basket Tip
4-2.7.3-2 Guide Plate
38 4-4 FLOW MEASUREMENT
39 4-4.1.4 Units in the General Flow Equation
40 4-4.1.5-1 Summary Uncertainty of Discharge Coefficient and of Expansion Factor, Pressure, and Differential Pressure in the Same Units
4-4.1.5-2 Uncertainties in Mass Flow for Correctly Applied Differential Pressure Flow Meters
41 4-5 ELECTRICAL GENERATION MEASUREMENT
4-5.2.1-1 Two-Meter System for Use on Three-Wire Delta-Connected Power Systems
42 4-5.2.1-2 Two-Meter System for Use on Three-Wire Wye-Connected Power Systems
4-5.2.2 Three-Meter System for Use on Four-Wire Power Systems
45 4-6 DATA COLLECTION AND HANDLING
47 Section 5 Computation of Results
5-1 FUNDAMENTAL EQUATION
5-2 DATA REDUCTION
5-3 CORRECTION OF TEST RESULTS TO SPECIFIED CONDITIONS
48 5-1 Application of Corrections
49 5-3.1.1 Correction Formulations
52 5-3.2.1 Illustration of a Correction Curve With Independent and Interacting Variables
5-3.2.2 Illustration of a Correction Curve With Two Independent Variables
5-3.2.1 Output From a Turbine Performance Modeling Program, Example 1
5-3.2.2 Output From a Turbine Performance Modeling Program, Example 2
53 5-3.3 Terms Used for Flow Capacity Correction
55 5-4 UNCERTAINTY ANALYSIS
57 Section 6 Report of Results
6-1 GENERAL REQUIRMENTS
6-2 EXECUTIVE SUMMARY
6-3 INTRODUCTION
6-4 CALCULATIONS AND RESULTS
6-5 INSTRUMENTATION
58 6-6 CONCLUSION
6-7 APPENDICES
60 I CORRECTION FORMULATION METHODOLOGY
66 II PROCEDURE FOR FITTING A CALIBRATION CURVE OF AN ORIFICE- METERING RUN
69 A SAMPLE TEST CALCULATION
87 B SAMPLE TEST UNCERTAINTY CALCULATION
94 C SAMPLE FLOW CALCULATIONS FOR DIFFERENTIAL PRESSURE METERS
100 D PROCEDURES FOR DETERMINING HP TO IP LEAKAGE FLOW
ASME PTC 6.2 04 2004