{"id":82509,"date":"2024-10-18T03:06:03","date_gmt":"2024-10-18T03:06:03","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-515-2004\/"},"modified":"2024-10-24T19:50:26","modified_gmt":"2024-10-24T19:50:26","slug":"ieee-515-2004","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-515-2004\/","title":{"rendered":"IEEE 515 2004"},"content":{"rendered":"
Revision Standard – Inactive – Superseded. Specific testing requirements for qualifying electrical resistance heating cables and heating devices for use in industrial applications, as well as a basis for electrical and thermal design, are included. Applications include unclassified, and both North American and Zone classified areas.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Introduction Participants <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1. Overview 1.1 Scope <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 1.2 Purpose 2. References 3. Definitions <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 4. General product testing 4.1 Type test\u2014General purpose tests <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.2 Type test\u2014verification of sheath temperatures <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.3 Specific type test requirements for hazardous (classified) locations <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 4.4 Routine tests <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 5. Marking and installation instructions 5.1 Product markings for heating devices 5.2 Markings for field-assembled components <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.3 Installation Instructions 6. Design 6.1 Process considerations <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 6.2 Environmental\/site considerations 6.3 Thermal insulation and heat-loss considerations <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 6.4 Maximum temperature determination <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 6.5 Stabilized and controlled designs <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 6.6 Design information <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.7 Power system <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.8 Special considerations <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 6.9 Control and monitoring considerations <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | 6.10 Division 1 and Zone 1 design requirements <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 6.11 Safety shower design requirements 7. Installation 7.1 Personnel 7.2 Receiving and storage of materials <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | 7.3 Scheduling of installation 7.4 General installation recommendations <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 7.5 Special Division 1 and Zone 1 installation requirements <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 7.6 Controls and sensors 7.7 Cable testing after installation 7.8 Thermal insulation\u2014Recommendations <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | 7.9 Functional check and field documentation\u2014Recommendations <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 8. Maintenance 8.1 General maintenance recommendations 8.2 Division 1\/Zone 1 maintenance recommendations 8.3 Visual inspection 8.4 Periodic operational check <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 8.5 Record keeping <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | Annex A\u2014Bibliography <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | Annex B\u2014Pipe heat-loss considerations <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Annex C\u2014Vessel heat-loss considerations <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Annex D\u2014Heat-up considerations <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Annex E\u2014Method to determine equivalent thicknesses of insulating cements <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Annex F\u2014Type test matrix for Clause 4 <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Annex G\u2014Design basic data\u2014Example (see 6.6) <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Annex H\u2014Heater installation record\u2014Example (see 7.2.2) <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | Annex I\u2014Division 1\/Zone 1\u2014Checklist example (see 7.5) <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Annex J\u2014Heater commissioning record\u2014Example (see 7.9) <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | Annex K\u2014Maintenance log record\u2014Example (see 8.5.3) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Industrial Applications<\/b><\/p>\n |