{"id":82118,"date":"2024-10-18T03:01:34","date_gmt":"2024-10-18T03:01:34","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1792-2012\/"},"modified":"2024-10-24T19:49:09","modified_gmt":"2024-10-24T19:49:09","slug":"ieee-1792-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1792-2012\/","title":{"rendered":"IEEE 1792 2012"},"content":{"rendered":"

New IEEE Standard – Active. This recommended practice addresses activities related to preferred power supply (PPS) reliability, including design considerations, analytical studies, operational and maintenance considerations, and interface agreements between a nuclear power generating station (NPGS) and its associated Transmission Entities.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1792\u2122-2011 Front cover <\/td>\n<\/tr>\n
3<\/td>\nTitle page
\n <\/td>\n<\/tr>\n
6<\/td>\nIntroduction
Notice to users
Laws and regulations
Copyrights <\/td>\n<\/tr>\n
7<\/td>\nUpdating of IEEE documents
Errata
Interpretations
Patents <\/td>\n<\/tr>\n
8<\/td>\nParticipants <\/td>\n<\/tr>\n
10<\/td>\nContents <\/td>\n<\/tr>\n
11<\/td>\nImportant notice
\n
1. Overview <\/td>\n<\/tr>\n
12<\/td>\n1.1 Scope
1.2 Purpose
2. Normative references
3. Definitions <\/td>\n<\/tr>\n
14<\/td>\n4. Design considerations
4.1 PPS interface
4.2 Improving PPS reliability <\/td>\n<\/tr>\n
16<\/td>\n4.3 PPS analysis
5. Analytical studies
5.1 NPGS operating scenarios and alignments <\/td>\n<\/tr>\n
18<\/td>\n5.2 Transmission system studies (TSSs) <\/td>\n<\/tr>\n
22<\/td>\n5.3 NPGS calculations <\/td>\n<\/tr>\n
25<\/td>\n6. Operational considerations <\/td>\n<\/tr>\n
26<\/td>\n6.1 Operational attributes <\/td>\n<\/tr>\n
27<\/td>\n6.2 Operational practices
6.3 Restoration
6.4 Oversight <\/td>\n<\/tr>\n
28<\/td>\n7. Maintenance considerations
7.1 Maintenance program
7.2 Maintenance practices <\/td>\n<\/tr>\n
29<\/td>\n7.3 Responsibilities <\/td>\n<\/tr>\n
30<\/td>\n7.4 Coordination and scheduling
7.5 Oversight
8. Interface agreement (IA) <\/td>\n<\/tr>\n
31<\/td>\nAnnex A (informative) Interface agreement (IA) template <\/td>\n<\/tr>\n
35<\/td>\nAnnex B (informative) Historical perspective of the PPS <\/td>\n<\/tr>\n
39<\/td>\nAnnex C (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Recommended Practice for Nuclear Power Generating Station (NPGS) Preferred Power Supply (PPS) Reliability<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2012<\/td>\n39<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":82119,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-82118","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/82118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/82119"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=82118"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=82118"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=82118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}