{"id":460193,"date":"2024-10-20T10:08:19","date_gmt":"2024-10-20T10:08:19","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-15167-22024\/"},"modified":"2024-10-26T18:44:26","modified_gmt":"2024-10-26T18:44:26","slug":"bs-en-15167-22024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-15167-22024\/","title":{"rendered":"BS EN 15167-2:2024"},"content":{"rendered":"

This document specifies the scheme for the assessment and verification of constancy of performance (AVCP) of ground granulated blast furnace slag, including certification of constancy of performance. The document provides technical rules for the factory production control, further testing of samples taken at the manufacturing plant (autocontrol testing) and the assessment of the performance of the ground granulated blast furnace slag, initial inspection of the manufacturing plant and of the factory production control and audit testing of samples. It also provides rules for actions to be followed in the event of non-conformity and the requirement for depots. This document is linked with the European Standard covering ground granulated blast furnace slag, i.e. EN 15167-1:2006.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
6<\/td>\n1 Scope
2 Normative references
3 Terms, definitions and abbreviations
3.1 Terms and definitions <\/td>\n<\/tr>\n
7<\/td>\n3.2 Abbreviations <\/td>\n<\/tr>\n
8<\/td>\n4 Factory production control
4.1 General requirements
4.1.1 Concept
4.1.2 Works\u2019 quality documentation
4.1.3 Quality management system
4.1.3.1 Quality policy statement
4.1.3.2 Quality manager <\/td>\n<\/tr>\n
9<\/td>\n4.1.3.3 Internal audits and management review
4.1.3.4 Training
4.1.4 System of documentation
4.1.4.1 Document control
4.1.4.2 Quality records
4.2 Internal quality control
4.2.1 Process control
4.2.1.1 General
4.2.1.2 Constituents and composition of ground granulated blast furnace slag
4.2.1.3 Control of off-specification production or non-conformity <\/td>\n<\/tr>\n
10<\/td>\n4.2.2 Measuring and testing
4.2.2.1 Inspection, measuring and test equipment
4.2.2.2 Inspection and test status
4.2.3 Handling, storage, packaging and delivery
4.3 Autocontrol testing of samples
4.3.1 Sampling and testing
4.3.2 Corrective action
4.3.3 Measuring and test equipment for autocontrol testing <\/td>\n<\/tr>\n
11<\/td>\n4.3.4 Quality records
5 Tasks for the purpose of certification
5.1 Assessment and verification of constancy of the performance of the ground granulated blast furnace slag
5.2 Initial inspection of the manufacturing plant and of factory production control
5.2.1 Inspection of a new factory
5.2.2 Inspection of an existing factory
5.2.3 Criteria for the assessment of the production equipment <\/td>\n<\/tr>\n
12<\/td>\n5.2.4 Criteria for the assessment of laboratories
5.3 Continuing surveillance, assessment and evaluation of factory production control
5.3.1 Inspection of the factory and the factory production control
5.3.2 Evaluation of the results of autocontrol testing of samples <\/td>\n<\/tr>\n
13<\/td>\n5.4 Audit testing of samples taken at the factory\/depot
5.4.1 Sampling
5.4.2 Testing
5.4.3 Evaluation of test results <\/td>\n<\/tr>\n
14<\/td>\n5.5 Reports
5.6 Actions to be taken in the event of non-conformity
5.6.1 Following inspection of the factory production control and evaluation of the results of autocontrol testing
5.6.2 Following evaluation of the results of the audit testing
6 Procedure for certification of constancy of performance of the product <\/td>\n<\/tr>\n
17<\/td>\nAnnex A (normative)Evaluation of the representativeness and the accuracy of the 28-day activity index test results
A.1 General
A.2 Sets of results considered
A.3 Evaluation procedure
A.3.1 Introduction
A.3.2 Symbols
A.3.3 Evaluation of whether set A and set B belong to the same population (sampling error check) <\/td>\n<\/tr>\n
18<\/td>\nA.3.4 Comparison between set B and set C in order to check the accuracy of the autocontrol testing (testing error check) <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Ground granulated blast furnace slag for use in concrete, mortar and grout – Assessment and verification of constancy of performance<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2024<\/td>\n20<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":460203,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1255,2641],"product_tag":[],"class_list":{"0":"post-460193","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-100-15","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/460193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/460203"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=460193"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=460193"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=460193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}