{"id":457084,"date":"2024-10-20T09:49:31","date_gmt":"2024-10-20T09:49:31","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-122-6-2013-3\/"},"modified":"2024-10-26T18:16:17","modified_gmt":"2024-10-26T18:16:17","slug":"ieee-c37-122-6-2013-3","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-122-6-2013-3\/","title":{"rendered":"IEEE C37.122.6-2013"},"content":{"rendered":"
Revision Standard – Inactive-Reserved. Recommendations for the connection of gas-insulated substation to another gas-insulated substation of a different make or design are given. IEEE Std 1416TM is replaced by this recommended practice.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C37.122.6-2013 Front Cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title Page \n <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | Abstract\/Keywords <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | IMPORTANT NOTICE 1. Scope 2. Normative references <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3. Definitions 4. General <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 5. Specific requirements during initial stage of GIS project 5.1 General 5.2 Grounding consideration for GIS extension <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.3 Service continuity 6. Specific requirements during extension GIS project 6.1 General <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 6.2 Preparation work 6.3 Design work <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 6.4 Manufacturing stage 6.5 Site work 6.6 Outage conditions <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 7. Recommended practice for GIS interface 7.1 General 7.2 GIS interface for extensions anticipated from initial stage 7.3 Case of extensions not anticipated from initial stage <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8. Responsibility <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Annex A (informative) Standard GIS interface for extensions anticipated from initial stage <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | Annex B (informative) GIS interface for extensions not anticipated from initial stage <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Annex C (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for the Interface of New Gas-Insulated Equipment in Existing Gas-Insulated Substations Rated above 52 kV (Superseded Redline)<\/b><\/p>\n |