{"id":457084,"date":"2024-10-20T09:49:31","date_gmt":"2024-10-20T09:49:31","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c37-122-6-2013-3\/"},"modified":"2024-10-26T18:16:17","modified_gmt":"2024-10-26T18:16:17","slug":"ieee-c37-122-6-2013-3","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c37-122-6-2013-3\/","title":{"rendered":"IEEE C37.122.6-2013"},"content":{"rendered":"

Revision Standard – Inactive-Reserved. Recommendations for the connection of gas-insulated substation to another gas-insulated substation of a different make or design are given. IEEE Std 1416TM is replaced by this recommended practice.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std C37.122.6-2013 Front Cover <\/td>\n<\/tr>\n
3<\/td>\nTitle Page
\n <\/td>\n<\/tr>\n
4<\/td>\nAbstract\/Keywords <\/td>\n<\/tr>\n
5<\/td>\nImportant Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n
8<\/td>\nParticipants <\/td>\n<\/tr>\n
10<\/td>\nIntroduction <\/td>\n<\/tr>\n
11<\/td>\nContents <\/td>\n<\/tr>\n
13<\/td>\nIMPORTANT NOTICE
1. Scope
2. Normative references <\/td>\n<\/tr>\n
14<\/td>\n3. Definitions
4. General <\/td>\n<\/tr>\n
15<\/td>\n5. Specific requirements during initial stage of GIS project
5.1 General
5.2 Grounding consideration for GIS extension <\/td>\n<\/tr>\n
16<\/td>\n5.3 Service continuity
6. Specific requirements during extension GIS project
6.1 General <\/td>\n<\/tr>\n
17<\/td>\n6.2 Preparation work
6.3 Design work <\/td>\n<\/tr>\n
18<\/td>\n6.4 Manufacturing stage
6.5 Site work
6.6 Outage conditions <\/td>\n<\/tr>\n
25<\/td>\n7. Recommended practice for GIS interface
7.1 General
7.2 GIS interface for extensions anticipated from initial stage
7.3 Case of extensions not anticipated from initial stage <\/td>\n<\/tr>\n
26<\/td>\n8. Responsibility <\/td>\n<\/tr>\n
27<\/td>\nAnnex A (informative) Standard GIS interface for extensions anticipated from initial stage <\/td>\n<\/tr>\n
31<\/td>\nAnnex B (informative) GIS interface for extensions not anticipated from initial stage <\/td>\n<\/tr>\n
34<\/td>\nAnnex C (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Recommended Practice for the Interface of New Gas-Insulated Equipment in Existing Gas-Insulated Substations Rated above 52 kV (Superseded Redline)<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2013<\/td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":457094,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-457084","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/457084","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/457094"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=457084"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=457084"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=457084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}