{"id":45289,"date":"2024-10-17T07:08:35","date_gmt":"2024-10-17T07:08:35","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-e964-2006\/"},"modified":"2024-10-24T16:00:08","modified_gmt":"2024-10-24T16:00:08","slug":"astm-e964-2006","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-e964-2006\/","title":{"rendered":"ASTM-E964 2006"},"content":{"rendered":"<\/p>\n

1.1 This practice covers a procedure for calculating and interpreting benefit-to-cost ratios (BCR) and savings-to-investment ratios (SIR) as an aid for making building-related decisions.<\/p>\n

1.2 A basic premise of the BCR and SIR methods is that future as well as present benefits and costs arising from a decision are important to that decision, and, if measurable in dollars, should be included in calculating the BCR and SIR.<\/p>\n

1.3 Dollar amounts used to calculate BCR and SIR are all discounted, that is, expressed in time-equivalent dollars, either in present value or uniform annual value terms.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nScope
Referenced Documents <\/td>\n<\/tr>\n
2<\/td>\nTerminology
Summary of Practice
Significance and Use
Procedure
Objectives, Constraints, and Alternatives <\/td>\n<\/tr>\n
3<\/td>\nData and Assumptions
Calculation of BCR and SIR <\/td>\n<\/tr>\n
4<\/td>\nAnalysis of BCR or SIR Results and the Decision <\/td>\n<\/tr>\n
5<\/td>\nBCR or SIR Report
Applications
TABLE 1
TABLE 2
TABLE 3
TABLE 4 <\/td>\n<\/tr>\n
6<\/td>\nTABLE 5 <\/td>\n<\/tr>\n
7<\/td>\nKeywords
X1. USING THE BCR TO EVALUATE A REAL ESTATE INVESTMENT: ILLUSTRATION
X1.1
X1.2
X1.3
X1.4
X1.5 Alternatives Considered:
X1.6 <\/td>\n<\/tr>\n
8<\/td>\nX1.7
X1.8
X1.9
TABLE X1.1 <\/td>\n<\/tr>\n
9<\/td>\nTABLE X1.2
TABLE X1.3
TABLE X1.4 <\/td>\n<\/tr>\n
10<\/td>\nTABLE X1.5
TABLE X1.6
TABLE X1.7 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

E964-06e1 Standard Practice for Measuring Benefit-to-Cost and Savings-to-Investment Ratios for Buildings and Building Systems<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
ASTM<\/b><\/a><\/td>\n2006<\/td>\n10<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":45290,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1224,2637],"product_tag":[],"class_list":{"0":"post-45289","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-010-20","7":"product_cat-astm","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/45289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/45290"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=45289"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=45289"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=45289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}