{"id":447312,"date":"2024-10-20T08:51:19","date_gmt":"2024-10-20T08:51:19","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iec-61936-22023-tc\/"},"modified":"2024-10-26T16:30:09","modified_gmt":"2024-10-26T16:30:09","slug":"bs-en-iec-61936-22023-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iec-61936-22023-tc\/","title":{"rendered":"BS EN IEC 61936-2:2023 – TC"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
69<\/td>\nundefined <\/td>\n<\/tr>\n
72<\/td>\nAnnex ZA (normative)Normative references to international publicationswith their corresponding European publications <\/td>\n<\/tr>\n
74<\/td>\nEnglish
CONTENTS <\/td>\n<\/tr>\n
78<\/td>\nFOREWORD <\/td>\n<\/tr>\n
81<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
82<\/td>\n1 Scope <\/td>\n<\/tr>\n
83<\/td>\n2 Normative references <\/td>\n<\/tr>\n
84<\/td>\n3 Terms, definitions, symbols and abbreviated terms
3.1 Terms and definitions <\/td>\n<\/tr>\n
86<\/td>\n3.2 Symbols and abbreviated terms
4 Fundamental requirements
4.1 General
4.1.1 General requirements
Figures
Figure 1 \u2013 Simplified example of a VSC scheme layout showingdemarcation of scope of this document with IEC 61936-1 <\/td>\n<\/tr>\n
87<\/td>\nFigure 2 \u2013 Simplified example of a LCC bipole scheme layout showingdemarcation of scope of this document with IEC 61936-1 <\/td>\n<\/tr>\n
88<\/td>\n4.1.2 Agreements between supplier and user
Tables
Table 1 \u2013 References to subclauses where agreement betweensupplier and user is required <\/td>\n<\/tr>\n
89<\/td>\n4.2 Electrical requirements
4.2.1 Methods of DC neutral point earthing <\/td>\n<\/tr>\n
90<\/td>\nFigure 3 \u2013 DC neutral point earthing for various DC configurations <\/td>\n<\/tr>\n
91<\/td>\n4.2.2 Voltage classification
4.2.3 Current in normal operation
4.2.4 Short-circuit current
4.2.5 Rated frequency <\/td>\n<\/tr>\n
92<\/td>\n4.2.6 Corona
4.2.7 Electric and magnetic fields
4.2.8 Overvoltages
4.2.9 Harmonics <\/td>\n<\/tr>\n
93<\/td>\n4.2.10 Electromagnetic compatibility
4.2.11 Radio interference <\/td>\n<\/tr>\n
94<\/td>\n4.3 Mechanical requirements
4.4 Climatic and environmental conditions
4.4.1 General <\/td>\n<\/tr>\n
95<\/td>\n4.4.2 Normal conditions <\/td>\n<\/tr>\n
96<\/td>\n4.4.3 Special conditions <\/td>\n<\/tr>\n
97<\/td>\n4.5 Particular requirements
4.5.1 Effects of small animals and micro-organisms
4.5.2 Noise level <\/td>\n<\/tr>\n
98<\/td>\n4.5.3 Transport
5 Insulation
5.1 General
5.2 Selection of insulation level
5.2.1 General
5.2.2 Consideration of methods of neutral earthing
5.2.3 Consideration of rated withstand voltages for AC and specified withstand voltages for DC
5.3 Verification of withstand values <\/td>\n<\/tr>\n
99<\/td>\n5.4 Minimum clearances of live parts
5.5 Minimum clearances between parts under special conditions
5.6 Tested connection zones <\/td>\n<\/tr>\n
100<\/td>\n6 Electrical Equipment
6.1 General requirements
6.2 Specific requirements
6.2.1 Switching devices
6.2.2 Power transformers and reactors
6.2.3 Prefabricated type-tested switchgear
6.2.4 Instrument transformers <\/td>\n<\/tr>\n
101<\/td>\n6.2.5 Surge arresters
6.2.6 Capacitors
6.2.7 Line traps
6.2.8 Insulators
6.2.9 Insulated cables
6.2.10 Conductors and accessories
6.2.11 Rotating electrical machines
6.2.12 Generating units
6.2.13 Generating unit main connections <\/td>\n<\/tr>\n
102<\/td>\n6.2.14 Static converters
6.2.15 Fuses
6.2.16 Electrical and mechanical interlocking
6.2.17 Resistors
6.2.18 Cooling system
7 DC Installations
7.1 General
7.1.1 Common requirements <\/td>\n<\/tr>\n
103<\/td>\n7.1.2 Circuit arrangement
7.1.3 Documentation
7.1.4 Transport routes
7.1.5 Aisles and access areas
7.1.6 Lighting
7.1.7 Operational safety
7.1.8 Labelling
7.2 Outdoor DC installations of open design
7.2.1 General <\/td>\n<\/tr>\n
104<\/td>\n7.2.2 Protective barrier clearances
7.2.3 Protective obstacle clearances
7.2.4 Boundary clearances
7.2.5 Minimum height over access area <\/td>\n<\/tr>\n
105<\/td>\n7.2.6 Clearances to buildings <\/td>\n<\/tr>\n
106<\/td>\n7.2.7 External fences or walls and access doors
7.3 Indoor DC installations of open design
7.4 Installation of prefabricated type-tested switchgear
Figure 4 \u2013 Approaches with buildings (within closed electrical operating areas) <\/td>\n<\/tr>\n
107<\/td>\n7.5 Requirements for buildings
7.5.1 General
7.5.2 Structural provisions
7.5.3 Rooms for switchgear
7.5.4 Maintenance and operating areas <\/td>\n<\/tr>\n
108<\/td>\n7.5.5 Doors
7.5.6 Draining of insulating liquids
7.5.7 Heating, ventilation and air conditioning (HVAC)
7.5.8 Buildings which require special consideration
7.6 High voltage\/low voltage prefabricated substations
7.7 Electrical installations on mast, pole and tower <\/td>\n<\/tr>\n
109<\/td>\n8 Safety measures
8.1 General
8.2 Protection against direct contact
8.2.1 General
8.2.2 Measures for protection against direct contact
8.2.3 Protection requirements
8.3 Means to protect persons in case of indirect contact
8.4 Means to protect persons working on or near electrical installations <\/td>\n<\/tr>\n
110<\/td>\n8.5 Protection from danger resulting from arc fault
8.6 Protection against direct lightning strokes
8.7 Protection against fire
8.8 Protection against leakage of insulating liquid and SF6
8.9 Identification and marking
9 Protection, automation and auxiliary systems
9.1 Protection systems
9.2 Automation systems
9.3 Auxiliary systems
9.4 Basic rules for electromagnetic compatibility of control systems <\/td>\n<\/tr>\n
111<\/td>\n10 Earthing systems
10.1 General
10.2 Fundamental requirements
10.2.1 Safety criteria <\/td>\n<\/tr>\n
112<\/td>\n10.2.2 Functional requirements
10.2.3 High and low voltage earthing systems
Figure 5 \u2013 Touch voltage limit DC <\/td>\n<\/tr>\n
113<\/td>\n10.3 Design of earthing systems
10.3.1 General
10.3.2 Power system faults
10.3.3 Lightning and transient overvoltages <\/td>\n<\/tr>\n
114<\/td>\n10.4 Construction of earthing systems
10.5 Measurements
10.6 Maintainability
10.6.1 Inspections
10.6.2 Measurements
11 Inspection and testing
11.1 General
11.2 Verification of specified performances
11.3 Tests during installation and commissioning
11.4 Trial running
12 Operation and maintenance manual <\/td>\n<\/tr>\n
115<\/td>\nAnnex A (informative)Example of typical DC voltages with possible insulation levelsand corresponding air clearances <\/td>\n<\/tr>\n
116<\/td>\nTable A.1 \u2013 Typical DC voltages and switching \/ lightning impulse withstand voltage <\/td>\n<\/tr>\n
117<\/td>\nTable A.2 \u2013 Correlation between presumed rated switching impulseWithstand voltages and minimum phase-to-earth air clearances
Table A.3 \u2013 Correlation between presumed rated lightning impulse withstand voltages and minimum phase-to-earth clearances <\/td>\n<\/tr>\n
118<\/td>\nAnnex B (normative)Method of calculating the voltage limit <\/td>\n<\/tr>\n
119<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Power installations exceeding 1 kV AC and 1,5 kV DC – DC<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n122<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":447322,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[495,2641],"product_tag":[],"class_list":{"0":"post-447312","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-29-080-01","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/447312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/447322"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=447312"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=447312"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=447312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}