{"id":394599,"date":"2024-10-20T04:14:50","date_gmt":"2024-10-20T04:14:50","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-iec-60730-2-82020a12021\/"},"modified":"2024-10-26T07:56:53","modified_gmt":"2024-10-26T07:56:53","slug":"bs-en-iec-60730-2-82020a12021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-iec-60730-2-82020a12021\/","title":{"rendered":"BS EN IEC 60730-2-8:2020+A1:2021"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Final version <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | English CONTENTS <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 1 Scope and normative references <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 2 Terms and definitions <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 3 General requirements 4 General notes on tests 5 Rating 6 Classification <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 7 Information Tables Table 1 \u2013 Required information and methods of providing information Table 101 \u2013 Nominal size and thread size of end connections <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 8 Protection against electric shock <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 9 Provision for protective earthing 10 Terminals and terminations <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 11 Constructional requirements 12 Moisture and dust resistance 13 Electric strength and insulation resistance <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 14 Heating <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 15 Manufacturing deviation and drift 16 Environmental stress <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 17 Endurance <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 18 Mechanical strength <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Table 102 \u2013 Torque test requirement for metal valves with internal threadedend-connections Table 103 \u2013 Torque test requirement for metal valves with external threadedend-connections <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 19 Threaded parts and connections 20 Creepage distances, clearances and distances through insulation 21 Resistance to heat, fire and tracking 22 Resistance to corrosion 23 Electromagnetic compatibility (EMC) requirements \u2013 Emission 24 Components 25 Normal operation <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 26 Electromagnetic compatibility (EMC) requirements \u2013 Immunity 27 Abnormal operation <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Table 104 \u2013 Maximum winding temperature (for test of blocked output conditions and valves declared under Table 1, item 113) <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 28 Guidance on the use of electronic disconnection <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Annexes Annex H (normative) Requirements for electronic controls <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | Annex AA (informative) Relation between different flow coefficients <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | Annex BB (normative) Arrangement for the measurement of transient pressures caused by water valves <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | Figures Figure BB.1 \u2013 Transient pressure measurement test rig schematic diagram <\/td>\n<\/tr>\n | ||||||
44<\/td>\n | Annex CC (normative) Long term pressure for test thermosplastic bodied valves Table CC.1 \u2013 Test requirements for valves intended for uses other than the control of water for tap and shower outlets <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Table CC.2 \u2013 Test requirements for valves intended for the control of water for tap and shower outlets <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Annex DD (normative) Torque Figure DD.1 \u2013 Arrangements for carrying out the torque test <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | Table DD.1 \u2013 Required torque for test <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Table DD.2 \u2013 Tightening torque in newton metres (Nm) for bolts and screwsfor adaptors <\/td>\n<\/tr>\n | ||||||
50<\/td>\n | Annex EE (normative) Arrangement for the measurement of transient pressures caused by water valves with a declared pressure of up to and including 1,0 MPa (10 bar) Figure EE.1 \u2013 Transient pressure measurement test rig for valves with a declared pressure of up to and including 1,0 MPa (10 bar) schematic diagram <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Bibliography <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Annex ZA (normative)Normative references to international publicationswith their corresponding European publications <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | 1\u2003Scope and normative references 1.2\u2003Normative references 10\u2003Terminals and terminations 10.2\u2003Terminals and terminations for internal conductors <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 14\u2003Heating 14.5 14.5.105\u2003 14.5.106\u2003 27\u2003Abnormal operation 27.2\u2003Burnout test 27.2.3\u2003Blocked mechanical output test (abnormal temperature test) 27.2.3.1 <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | 27.102\u2003Running overload 27.102.3 <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | Annex DD (normative) Torque DD.1 Torque test for valves with internally threaded end-connections according to ISO 7-1 DD.1.1\u2003General DD.1.1.1\u2003 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Automatic electrical controls – Particular requirements for electrically operated water valves, including mechanical requirements<\/b><\/p>\n |