{"id":347490,"date":"2024-10-20T00:26:31","date_gmt":"2024-10-20T00:26:31","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-iec-265622019\/"},"modified":"2024-10-25T23:57:12","modified_gmt":"2024-10-25T23:57:12","slug":"bs-iso-iec-265622019","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-iec-265622019\/","title":{"rendered":"BS ISO\/IEC 26562:2019"},"content":{"rendered":"
This document, within the context of methods and tools for supporting the transitioning the organization\u2019s current development approach to software and systems product line engineering:<\/b><\/p>\n defines processes for product line transition management. Those processes are described in terms of purpose, inputs, tasks and outcomes;<\/p>\n<\/li>\n defines method capabilities to support the defined tasks of each process;<\/p>\n<\/li>\n defines tool capabilities that automate or semi-automate tasks and methods.<\/p>\n<\/li>\n<\/ul>\n This document does not concern processes and capabilities of tools and methods for a single system but rather deals with those for a family of products.<\/p>\n Software and systems engineering. Methods and tools for product line transition management<\/b><\/p>\n\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 2<\/td>\n undefined <\/td>\n<\/tr>\n \n 7<\/td>\n Foreword <\/td>\n<\/tr>\n \n 8<\/td>\n Introduction <\/td>\n<\/tr>\n \n 11<\/td>\n 1 Scope
2 Normative references
3 Terms and Definitions <\/td>\n<\/tr>\n\n 12<\/td>\n 4 Reference model for product line transition management
4.1 Overview <\/td>\n<\/tr>\n\n 13<\/td>\n 4.2 Product line transition management
4.3 Product line transition operationalization <\/td>\n<\/tr>\n\n 14<\/td>\n 4.4 Product line transition support <\/td>\n<\/tr>\n \n 15<\/td>\n 5 Product line transition management
5.1 General
5.2 Product line transition planning
5.2.1 Principal constituents <\/td>\n<\/tr>\n\n 16<\/td>\n 5.2.2 Establish organization\u2019s transition goal <\/td>\n<\/tr>\n \n 17<\/td>\n 5.2.3 Determine organization\u2019s transition strategy
5.2.4 Define key procedures for transition <\/td>\n<\/tr>\n\n 18<\/td>\n 5.2.5 Formulate schedules and required resources for transition
5.2.6 Specify how to monitor, measure, and control the effectiveness of transition <\/td>\n<\/tr>\n\n 19<\/td>\n 5.2.7 Document product line transition plan
5.3 Product line transition enabling
5.3.1 Principal constituents <\/td>\n<\/tr>\n\n 20<\/td>\n 5.3.2 Establish governance policy for transition
5.3.3 Mobilize qualified human resources for transition <\/td>\n<\/tr>\n\n 21<\/td>\n 5.3.4 Identify infrastructure and resource needs for transition operationalization and support
5.3.5 Enable quality assurance measurement for transition <\/td>\n<\/tr>\n\n 22<\/td>\n 5.3.6 Improve transition process continuously
5.4 Product line transition managing
5.4.1 Principal constituents <\/td>\n<\/tr>\n\n 23<\/td>\n 5.4.2 Tailor and allocate governance policy, R & R, and resources to relevant sub functions of transition
5.4.3 Collect data from SSPL transition sub functions <\/td>\n<\/tr>\n\n 24<\/td>\n 5.4.4 Monitor, measure, and control transition operationalization and support
5.4.5 Manage actual operation and support of transition <\/td>\n<\/tr>\n\n 25<\/td>\n 5.4.6 Provide feedback to planning and enabling functions of transition
6 Product line transition operationalization
6.1 General
6.2 Product line transition preparation
6.2.1 Principal constituents <\/td>\n<\/tr>\n\n 26<\/td>\n 6.2.2 Create transition scenarios to deploy transition strategy <\/td>\n<\/tr>\n \n 27<\/td>\n 6.2.3 Analyse the effectiveness of the transition scenarios
6.2.4 Select an optimal transition scenario
6.2.5 Specify the scenario for transition launch
6.2.6 Train human resources responsible for transition <\/td>\n<\/tr>\n\n 28<\/td>\n 6.3 Launching the product line transition
6.3.1 Principal constituents <\/td>\n<\/tr>\n\n 29<\/td>\n 6.3.2 Launch a pilot transition
6.3.3 Deliver findings from launching the pilot transition
6.3.4 Improve the transition process from the actual pilot(s) <\/td>\n<\/tr>\n\n 30<\/td>\n 6.3.5 Retrain human resources responsible for transition
6.4 Product line transition operation
6.4.1 Principal constituents <\/td>\n<\/tr>\n\n 31<\/td>\n 6.4.2 Perform organization wide transition operation
6.4.3 Capture relevant data from the operation
6.4.4 Document the findings, strengths, and weaknesses <\/td>\n<\/tr>\n\n 32<\/td>\n 6.4.5 Assess gaps between to-be and as-is
6.4.6 Improve the transition process from the gap assessment results
6.5 Institutionalizing the product line transition
6.5.1 Principal constituents <\/td>\n<\/tr>\n\n 33<\/td>\n 6.5.2 Assign responsibilities of roles for institutionalization
6.5.3 Identify gaps to drive improvements for institutionalization <\/td>\n<\/tr>\n\n 34<\/td>\n 6.5.4 Exercise necessary actions to fill the gaps
6.5.5 Monitor the status\/effects of the actions
6.5.6 Perform continuous improvement for institutionalization <\/td>\n<\/tr>\n\n 35<\/td>\n 7 Product line transition support
7.1 General
7.2 Quality assurance for product line transition
7.2.1 Principal constituents <\/td>\n<\/tr>\n\n 36<\/td>\n 7.2.2 Objectively evaluate transition activities
7.2.3 Objectively evaluate transition work products <\/td>\n<\/tr>\n\n 37<\/td>\n 7.2.4 Communicate and resolve noncompliance issues
7.2.5 Establish records of transition quality assurance activities <\/td>\n<\/tr>\n\n 38<\/td>\n 7.3 Measuring the success of product line transition
7.3.1 Principal constituents
7.3.2 Integrate measurement results of product line transition <\/td>\n<\/tr>\n\n 39<\/td>\n 7.3.3 Evaluate the success of product line transition
7.3.4 Record results and inform to the relevant stakeholders <\/td>\n<\/tr>\n\n 40<\/td>\n 7.3.5 Improve the product line transition process continuously
7.4 Risk management for product line transition
7.4.1 Principal constituents <\/td>\n<\/tr>\n\n 41<\/td>\n 7.4.2 Identify risks related to the success of transition <\/td>\n<\/tr>\n \n 42<\/td>\n 7.4.3 Develop mitigation plans for the identified risks
7.4.4 Monitor the execution of the mitigation plan
7.4.5 Learn from actual results of risk management for product line transition <\/td>\n<\/tr>\n\n 44<\/td>\n Annex A (informative) Exemplar product line transition strategies <\/td>\n<\/tr>\n \n 45<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2019<\/td>\n 46<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":347499,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-347490","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/347490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/347499"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=347490"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=347490"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=347490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}