{"id":29932,"date":"2024-10-17T03:24:01","date_gmt":"2024-10-17T03:24:01","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/smacna-buildingsystemsanalysisandretrofitmanual-11\/"},"modified":"2024-10-24T14:16:03","modified_gmt":"2024-10-24T14:16:03","slug":"smacna-buildingsystemsanalysisandretrofitmanual-11","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/smacna\/smacna-buildingsystemsanalysisandretrofitmanual-11\/","title":{"rendered":"SMACNA BuildingSystemsAnalysisandRetrofitManual 11"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
5<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | BUILDING SYSTEMS ANALYSIS AND RETROFIT TASK FORCE <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | NOTICE TO USERS OF THIS PUBLICATION <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | TABLE OF CONTENTS <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | CHAPTER 1 INTRODUCTION 1.1 RETROFIT CONTRACTOR REQUIREMENTS 1.2 RETROFIT MARKET <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 1.3 ABOUT THIS MANUAL <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | CHAPTER 2 COMMISSIONING 2.1 INTRODUCTION <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 2.2 PROCESS OVERVIEW <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 2.3 PRELIMINARY INVESTIGATION 2.4 SURVEY AND DOCUMENTATION PHASE <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 2.5 ANALYSIS 2.6 MODIFICATIONS 2.7 COMMISSIONING TESTS <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | CHAPTER 3 ELECTRICAL 3.1 INTRODUCTION 3.2 ELECTRICAL REVIEW FIGURE 3-1 POWER FACTOR RELATIONSHIPS <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | Table 3-1 Capacitor Correction For Power Factor <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 3.3 UTILITY CHARGES Table 3-2 Utility Block Pricing ” Increasing versus Declining <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 3.4 EQUIPMENT <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 3.5 LIGHTING <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 3.6 PEAK DEMAND POWER MANAGEMENT Table 3-3 Comparison of Lamp Types <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 3.7 REFERENCES <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | CHAPTER 4 BUILDING ENVELOPE 4.1 INTRODUCTION 4.2 BUILDING ENVELOPE ” ROOF <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | FIGURE 4-1 MAJOR COMPONENTS OF BUILDING ENVELOPE <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 4.3 BUILDING ENVELOPE ” OUTSIDE DOORS 4.4 BUILDING ENVELOPE ” WINDOWS AND SKYLIGHTS <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 4.5 BUILDING ENVELOPE ” EXTERIOR WALLS 4.6 BUILDING ENVELOPE ” SLAB 4.7 BUILDING ENVELOPE ” INFILTRATION 4.8 BUILDING ENVELOPE – JOINTS <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | CHAPTER 5 WATER USAGE AND EFFICIENCY 5.1 INTRODUCTION 5.2 DOMESTIC HOT WATER <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 5.3 FIXTURES Table 5-1a Plumbing Fixtures – Maximum Water Flow Allowed by Energy Policy Act of 2005 I-P Table 5-1b Plumbing Fixtures – Maximum Water Flow Allowed by Energy Policy Act of 2005 SI <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | 5.4 RAINWATER HARVESTING 5.5 REFERENCES <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | CHAPTER 6 HVAC SYSTEM 6.1 INTRODUCTION 6.2 AIR HANDLING SYSTEM <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | FIGURE 6-1 MULTI-ZONE SYSTEM <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | FIGURE 6-2 SINGLE-FAN DUAL-DUCT SYSTEM <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | FIGURE 6-3 TYPICAL DOAS SYSTEM <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | FIGURE 6-4 PRECONDITIONING DOAS <\/td>\n<\/tr>\n | ||||||
66<\/td>\n | 6.3 COOLING SYSTEM <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | FIGURE 6-5 SEPARATELY DUCTED DOAS <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | Table 6-1 Chiller Types by Capacity <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Table 6-2 Low Delta-T Causes and Required Actions <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | FIGURE 6-6 PRIMARY-ONLY CHILLED WATER SYSTEM <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | FIGURE 6-7 PRIMARY-SECONDARY CHILLED WATER SYSTEM <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | FIGURE 6-8 CHILLER EFFICIENCY LOSS VS. %OIL IN REFRIGERANT <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 6.4 HEATING SYSTEM <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 6.5 ENERGY RECOVERY SYSTEMS <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | FIGURE 6-9 CONDENSATE HEAT RECOVERY <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | FIGURE 6-10 LAUNDRY AND KITCHEN HOT WATER RECOVERY SYSTEM FIGURE 6-11 COMPRESSOR HEAT RECOVERY <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 6.6 PARTICULATE AIR FILTRATION 6.7 REFERENCES <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | CHAPTER 7 BUILDING AUTOMATION SYSTEMS AND CONTROLS 7.1 INTRODUCTION 7.2 HVAC CONTROL SYSTEMS 7.3 BUILDING AUTOMATION SYSTEM (BAS) <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 7.4 BAS PROTOCOLS <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 7.5 BAS CONTROL STRATEGIES AND OPTIMIZATION <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | FIGURE 7-1 TES WITH BYPASS VALVE FOR TEMPERATURE- CONTROLLED OPERATION FIGURE 7-2 GRAPH OF OPERATING LOADS ” HOT\/HUMID DAY <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | 7.6 BUILDING ENERGY MANAGEMENT AND CONTROL SYSTEMS (EMCS) <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | FIGURE 7-3 GRAPH OF OPERATING LOADS ” WARM DAY FIGURE 7-4 GRAPH OF OPERATING LOADS ” COOL DAY <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | 7.7 REFERENCES <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | CHAPTER 8 CFC AND HCFC CHANGEOUTS 8.1 INTRODUCTION 8.2 MONTREAL PROTOCOL AND CLEAN AIR ACT Table 8-1 Montreal and United States Phaseout Schedules <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | 8.3 REFRIGERANT MANAGEMENT PLAN 8.4 CHILLERS 8.5 RETROFIT OPPORTUNITIES Table 8-2 Chiller Types by Capacity <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | Table 8-3 Long Term Replacement for Common Refrigerants <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | 8.6 CHANGEOUTS FOR OTHER TYPES OF HVAC EQUIPMENT <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | 8.7 REFRIGERANT CHANGEOUTS <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | CHAPTER 9 CUSTOMER IDENTIFICATION RETROFIT OPPORTUNITY 9.1 CUSTOMER IDENTIFICATION <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 9.2 CUSTOMER CONTACT STRATEGY 9.3 BUILDING WALKTHROUGH <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 9.4 USING THE ENERGY AUDIT TO SELL RETROFIT WORK <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | APPENDIX A SWOT ANALYSIS A.1 SWOT ANALYSIS Table A-1 Strengths and Weaknesses ” SWOT Analysis <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | APPENDIX B DEDICATED OUTSIDE AIR SYSTEM B.1 DEDICATED OUTSIDE AIR SYSTEMS OVERVIEW B.2 DOAS ADVANTAGES <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | B.3 DOAS DISADVANTAGES B.4 FRACTIONAL AND INTEGRATED DOAS SYSTEMS <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | APPENDIX C ELECTRIC DEMAND CHARGES C.1 INTRODUCTION <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | APPENDIX D THERMAL ENERGY STORAGE D.1 FULL OR PARTIAL STORAGE <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | APPENDIX E WALKTHROUGH CHECKLIST <\/td>\n<\/tr>\n | ||||||
139<\/td>\n | GLOSSARY <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Building Systems Analysis and Retrofit Manual, 2nd Edition<\/b><\/p>\n |