{"id":244661,"date":"2024-10-19T16:04:43","date_gmt":"2024-10-19T16:04:43","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-62264-52016\/"},"modified":"2024-10-25T11:04:05","modified_gmt":"2024-10-25T11:04:05","slug":"bs-en-62264-52016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-62264-52016\/","title":{"rendered":"BS EN 62264-5:2016"},"content":{"rendered":"
IEC 62264-5:2016 defines transactions in terms of information exchanges between applications performing business and manufacturing activities associated with Levels 3 and 4. The exchanges are intended to enable information collection, retrieval, transfer and storage in support of enterprise-control system integration. This part of IEC 62264 is consistent with the IEC 62264-2 and IEC 62264-4 object models attributes. This standard also defines transactions that specify how to exchange the objects defined in IEC 62264-2, IEC 62264-4 and this standard. This second edition cancels and replaces the first edition published in 2011. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: The addition of transaction rules for objects defined in IEC 62264-4: Job, Job List, Job Response, Job Response List, Work Alert Definition, Work Alert, Work Calendar Definition, Work Calendar, Work Capability Work Directive, Work Master, Work Performance, Work Record, Work Schedule, Workflow Specification Node Type, Workflow Specification. It is published as a double logo standard.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
4<\/td>\n | European foreword Endorsement notice <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Annex ZA (normative) Normative references to international publications with their corresponding European publications <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | English CONTENTS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | FOREWORD <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | INTRODUCTION <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 1 Scope 2 Normative references <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 3 Terms, definitions, abbreviations, and conventions 3.1 Terms and definitions 3.2 Abbreviations <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 3.3 Conventions 4 Transaction messages and verbs 4.1 General <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.2 Transaction models <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.3 Message structure 4.3.1 General structure Figures Figure 1 \u2013 Typical exchanged messages in a transaction Figure 2 \u2013 Typical exchanged data set <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.3.2 Application identification area 4.3.3 Data area Figure 3 \u2013 Typical layout of an application identification area <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.3.4 Message nouns 4.3.5 Wildcard <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 5 Message verbs 5.1 Verbs and transaction models Figure 4 \u2013 GET with wildcard and SHOW response <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | Tables Table 1 \u2013 Defined verbs <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 5.2 GET verb <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 5.3 SHOW verb 5.4 PROCESS verb Figure 5 \u2013 GET and SHOW transaction <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 5.5 ACKNOWLEDGE verb Figure 6 \u2013 PROCESS\/ACKNOWLEDGE transaction with an “acknowledge always” option Table 2 \u2013 Acknowledge request options Table 3 \u2013 Acknowledge element <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5.6 CHANGE verb 5.7 CANCEL verb Figure 7 \u2013 Example of ACKNOWLEDGE to a PROCESS message Figure 8 \u2013 CHANGE\/RESPOND transaction with a “respond always” option Table 4 \u2013 Respond options <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 5.8 CONFIRM verb Figure 9 \u2013 CANCEL message Figure 10 \u2013 GET and SHOW transaction with a “confirm always” <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Figure 11 \u2013 Example of a GET message with “confirm OnError” Table 5 \u2013 Confirmation request options <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 5.9 RESPOND verb 5.10 SYNC verb Figure 12 \u2013 CONFIRM message Table 6 \u2013 Respond element <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 5.11 SYNC ADD verb 5.12 SYNC CHANGE verb 5.13 SYNC DELETE verb Figure 13 \u2013 SYNC ADD transaction with confirmation Figure 14 \u2013 SYNC DELETE transaction with no confirmation <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | 5.14 Verb actions and the use of IDs 6 Message nouns 6.1 General 6.2 Defined message contents 6.2.1 Equipment 6.2.2 Equipment Capability Test Specification 6.2.3 Equipment Class 6.2.4 Job List <\/td>\n<\/tr>\n | ||||||
36<\/td>\n | 6.2.5 Job Response 6.2.6 Job Response List 6.2.7 Material Class 6.2.8 Material Definition <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | 6.2.9 Material Lot 6.2.10 Material Sublot 6.2.11 Material Test Specification 6.2.12 Operations Capability 6.2.13 Operations Definition <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 6.2.14 Operations Schedule 6.2.15 Operations Performance 6.2.16 Person <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 6.2.17 Personnel Class 6.2.18 Physical Asset 6.2.19 Physical Asset Class 6.2.20 Physical Asset Capability Test Specification 6.2.21 Process Segment 6.2.22 Resource Relationship Network <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 6.2.23 Resource Relationship Network Connection Type 6.2.24 Qualification Test Specification 6.2.25 Transaction Profile 6.2.26 Work Alert Definition 6.2.27 Work Alert 6.2.28 Work Calendar Definition 6.2.29 Work Calendar <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 6.2.30 Work Capability 6.2.31 Work Directive 6.2.32 Work Master <\/td>\n<\/tr>\n | ||||||
42<\/td>\n | 6.2.33 Work Performance 6.2.34 Work Record 6.2.35 Work Schedule 6.2.36 Workflow Specification <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 6.2.37 Workflow Specification Type 6.2.38 Production specific models <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 6.3 Personnel model 6.3.1 Personnel model elements 6.3.2 Personnel Class verbs 6.3.3 Personnel Class verb actions Figure 15 \u2013 Object grouping for the personnel model <\/td>\n<\/tr>\n | ||||||
46<\/td>\n | Table 7 \u2013 Personnel Class verb actions <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 6.3.4 Person verbs 6.3.5 Person verb actions <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Table 8 \u2013 Person verb actions <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 6.3.6 Qualification Test Specification verbs 6.3.7 Qualification Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | Table 9 \u2013 Qualification Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 6.4 Role based equipment model 6.4.1 Role based equipment model elements 6.4.2 Equipment Class verbs 6.4.3 Equipment Class verb actions Figure 16 \u2013 Object grouping for the role based equipment model <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | Table 10 \u2013 Equipment Class verb actions <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 6.4.4 Equipment verbs 6.4.5 Equipment verb actions <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Table 11 \u2013 Equipment verb actions <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 6.4.6 Equipment Capability Test Specification verbs 6.4.7 Equipment Capability Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | 6.5 Physical Asset model 6.5.1 Physical Asset model elements Table 12 \u2013 Equipment Capability Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 6.5.2 Physical Asset Class verbs 6.5.3 Physical Asset Class verb actions Figure 17 \u2013 Object grouping for the Physical Asset model <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | Table 13 \u2013 Physical Asset Class verb actions <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | 6.5.4 Physical Asset verbs 6.5.5 Physical Asset verb actions <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Table 14 \u2013 Physical Asset verb actions <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 6.5.6 Physical Asset Capability Test Specification verbs 6.5.7 Physical Asset Capability Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
68<\/td>\n | 6.6 Material model 6.6.1 Material model elements Table 15 \u2013 Physical Asset capability Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | 6.6.2 Material Class verbs 6.6.3 Material Class verb actions Figure 18 \u2013 Object grouping for the material model <\/td>\n<\/tr>\n | ||||||
70<\/td>\n | Table 16 \u2013 Material Class verb actions <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | 6.6.4 Material Definition verbs 6.6.5 Material Definition verb actions <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | Table 17 \u2013 Material Definition verb actions <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | 6.6.6 Material Lot verbs 6.6.7 Material Lot verb actions <\/td>\n<\/tr>\n | ||||||
76<\/td>\n | Table 18 \u2013 Material Lot verb actions <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 6.6.8 Material Sublot verbs 6.6.9 Material Sublot verb actions <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | Table 19 \u2013 Material Sublot verb actions <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | 6.6.10 Material Test Specification verbs 6.6.11 Material Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | Table 20 \u2013 Material Test Specification verb actions <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 6.7 Process Segment model 6.7.1 Process Segment model elements 6.7.2 Process Segment verbs 6.7.3 Process Segment verb actions Figure 19 \u2013 Object grouping for the Process Segment model <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 6.8 Operations Capability model 6.8.1 Operations Capability model elements Table 21 \u2013 Process Segment verb actions <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 6.8.2 Operations Capability verbs 6.8.3 Operations Capability verb actions Figure 20 \u2013 Object grouping for the Operations Capability model <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | Table 22 \u2013 Operations Capability verb actions <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | Table 23 \u2013 Operations Capability element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 6.9 Operations Definition model 6.9.1 Operations Definition model elements <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 6.9.2 Operations Definition verbs 6.9.3 Operations Definition verb actions Figure 21 \u2013 Object grouping for the Operations Definition model <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | 6.10 Operations Schedule model 6.10.1 Operations Schedule model elements Table 24 \u2013 Operations Definition verb actions <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | 6.10.2 Operations Schedule verbs 6.10.3 Operations Schedule verb actions Figure 22 \u2013 Object grouping for the Operations Schedule model <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | Table 25 \u2013 Operations Schedule verb actions <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | 6.11 Operations Performance model 6.11.1 Operations Performance model elements Table 26 \u2013 Operations Schedule element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | 6.11.2 Operations Performance verbs 6.11.3 Operations Performance verb actions Figure 23 \u2013 Object grouping for the Operations Performance model <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | Table 27 \u2013 Operations Performance verb actions <\/td>\n<\/tr>\n | ||||||
96<\/td>\n | Table 28 \u2013 Operations Performance definitions for GET verb <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | 6.12 Resource Relationship Network model 6.12.1 Resource Relationship Network model elements 6.12.2 Resource Relationship Network verbs 6.12.3 Resource Relationship Network verb actions Figure 24 \u2013 Object grouping for the Resource Relationship Network model <\/td>\n<\/tr>\n | ||||||
98<\/td>\n | 6.12.4 Resource Relationship Connection Type verbs 6.12.5 Resource Relationship Connection Type verb actions Table 29 \u2013 Resource Relationship Network verb actions <\/td>\n<\/tr>\n | ||||||
99<\/td>\n | 6.13 Work Alerts 6.13.1 Work Alert model elements Table 30 \u2013 Resource Relationship Connection Type verb actions <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | 6.13.2 Work Alert Definition verbs 6.13.3 Work Alert Definition actions Figure 25 \u2013 Object grouping for the Work Alert model Table 31 \u2013 Work Alert Definition additional attributes <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | Table 32 \u2013 Work Alert Definition verb actions <\/td>\n<\/tr>\n | ||||||
102<\/td>\n | 6.13.4 Work Alert verbs 6.13.5 Work Alert verb actions Table 33 \u2013 Work Alert Definition element definitions for GET verb Table 34 \u2013 Work Alert Definition additional attributes Table 35 \u2013 Work Alert verb actions <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | 6.14 Work Calendar 6.14.1 Work Calendar elements Table 36 \u2013 Work Alert element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 6.14.2 Work Calendar Definition verbs 6.14.3 Work Calendar Definition actions Figure 26 \u2013 Object grouping for the Work Calendar model <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 6.14.4 Work Calendar verbs 6.14.5 Work Calendar actions Table 37 \u2013 Work Calendar Definition verb actions <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 6.15 Work Capability model 6.15.1 Work Capability model elements Table 38 \u2013 Work Calendar verb actions <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 6.15.2 Work Capability verbs 6.15.3 Work Capability verb actions Figure 27 \u2013 Object grouping for the Work Capability model <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | Table 39 \u2013 Work Capability verb actions <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | Table 40 \u2013 Work Capability element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 6.16 Work Definition model 6.16.1 Work Definition model elements <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 6.16.2 Work Master verbs 6.16.3 Work Master verb actions Figure 28 \u2013 Object grouping for the Work Definition model <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 6.16.4 Work Directive verbs 6.16.5 Work Directive verb actions Table 41 \u2013 Work Master verb actions <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | 6.17 Work Record 6.17.1 Work Record elements Table 42 \u2013 Work Directive verb actions <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 6.17.2 Work Record verbs 6.17.3 Work Record verb actions Figure 29 \u2013 Object grouping for the Work Record model <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | 6.18 Work Schedule model 6.18.1 Work Schedule elements Table 43 \u2013 Work Record verb actions <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 6.18.2 Work Schedule verbs 6.18.3 Work Schedule verb actions Figure 30 \u2013 Object grouping for the Work Schedule model <\/td>\n<\/tr>\n | ||||||
117<\/td>\n | 6.18.4 Job List verbs 6.18.5 Job List verb actions Table 44 \u2013 Work Schedule verb actions <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | Table 45 \u2013 Job List verb actions Table 46 \u2013 Work Schedule and Job List element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
119<\/td>\n | 6.19 Work Performance model 6.19.1 Work Performance elements 6.19.2 Work Performance verbs 6.19.3 Work Performance verb actions Figure 31 \u2013 Object grouping for the Work Performance model <\/td>\n<\/tr>\n | ||||||
120<\/td>\n | Table 47 \u2013 Work Performance verb actions <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 6.19.4 Job Response verbs 6.19.5 Job Response verb actions Table 48 \u2013 Work Performance element definitions for GET verb Table 49 \u2013 Job Response verb actions <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | 6.19.6 Job Response List verbs 6.19.7 Job Response List verb actions Table 50 \u2013 Job response element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | Table 51 \u2013 Job Response List verb actions <\/td>\n<\/tr>\n | ||||||
124<\/td>\n | 6.20 Workflow Specification model 6.20.1 Workflow Specification elements 6.20.2 Workflow Specification verbs Figure 32 \u2013 Object grouping for the Workflow Specification model Table 52 \u2013 Job Response List element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | 6.20.3 Workflow Specification verb actions 6.20.4 Workflow Specification Type Table 53 \u2013 Workflow Specification verb actions <\/td>\n<\/tr>\n | ||||||
126<\/td>\n | 6.20.5 Workflow Specification Type verbs 6.20.6 Workflow Specification Type verb actions Table 54 \u2013 Workflow Specification Type verb actions <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | 6.21 Transaction Profile Figure 33 \u2013 Transaction Profile model Table 55 \u2013 Attributes of Transaction Profile <\/td>\n<\/tr>\n | ||||||
128<\/td>\n | 7 Completeness, compliance and conformance 7.1 Completeness 7.2 Compliance Table 56 \u2013 Attributes of Supported Action Table 57 \u2013 Transaction Profile verb actions <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 7.3 Conformance <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | Table 58 \u2013 Supported verb-noun actions <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | Table 59 \u2013 Vendor conformance example <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | Annex\u00a0A (informative)Production operations transactions A.1 Product Definition model A.1.1 Product Definition model elements A.1.2 Product Definition verbs A.1.3 Product Definition verb actions Figure A.1 \u2013 Object grouping for the Product Definition model <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | A.2 Production Schedule model A.2.1 Production Schedule model elements Table A.1 \u2013 Product Definition verb actions <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | A.2.2 Production Schedule verbs A.2.3 Production Schedule verb actions Figure A.2 \u2013 Object grouping for the Production Schedule model <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | Table A.2 \u2013 Production Schedule verb actions <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | A.3 Production Performance model A.3.1 Production Performance model elements Table A.3 \u2013 Production Schedule element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | A.3.2 Production Performance verbs A.3.3 Production Performance verb actions Figure A.3 \u2013 Object grouping for the Production Performance model <\/td>\n<\/tr>\n | ||||||
138<\/td>\n | Table A.4 \u2013 Production Performance verb actions <\/td>\n<\/tr>\n | ||||||
139<\/td>\n | Table A.5 \u2013 Production Performance definitions for GET verb <\/td>\n<\/tr>\n | ||||||
140<\/td>\n | A.4 Production Capability model A.4.1 Production Capability model elements A.4.2 Production Capability verbs A.4.3 Production Capability verb actions Figure A.4 \u2013 Object grouping for the Production Capability model <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | Table A.6 \u2013 Production Capability verb actions <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | Table A.7 \u2013 Production Capability element definitions for GET verb <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | Annex\u00a0B (informative)Transaction models and business scenario examples B.1 Coordinating activities Figure B.1 \u2013 Coordinating planning and operations processes <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | B.2 Usage scenarios B.3 Operations Schedule and Operations Performance B.3.1 Push model B.3.2 Pull model Figure B.2 \u2013 Push model: Operations Schedule and Operations Performance <\/td>\n<\/tr>\n | ||||||
146<\/td>\n | B.3.3 Publish model B.4 Operations Schedule changes B.4.1 Push model Figure B.3 \u2013 Pull model: Operations Schedule and Operations Performance Figure B.4 \u2013 Publish model: Operations Schedule and Operations Performance <\/td>\n<\/tr>\n | ||||||
147<\/td>\n | B.4.2 Publish model Figure B.5 \u2013 Push model: Operations Schedule changes <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | B.5 Operations Schedule cancelled B.5.1 Push model B.5.2 Push and pull model Figure B.6 \u2013 Publish model: With schedule changes Figure B.7 \u2013 Push model: Operations Schedule cancelled <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | B.6 Daily Operations Performance B.6.1 Push model B.6.2 Pull model Figure B.8 \u2013 Push and pull model: Schedule cancelled Figure B.9 \u2013 Push model: Daily Operations Performance <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | B.6.3 Publish model B.7 Operations Schedule based on Operations Capability B.7.1 Pull and push model Figure B.10 \u2013 Pull model: Daily Operations Performance Figure B.11 \u2013 Publish model: Daily Operations Schedule <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | B.7.2 Publish and push model Figure B.12 \u2013 Pull and push model: Operations Capability and Operations Schedule <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | B.8 Operations Schedule changes B.8.1 Push and pull model Figure B.13 \u2013 Publish and push model: Operations Capability and Operations Schedule <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | B.8.2 Publish model Figure B.14 \u2013 Push and pull model: Schedule changes Figure B.15 \u2013 Publish model: Schedule changes after capability changes <\/td>\n<\/tr>\n | ||||||
154<\/td>\n | B.9 Material quantity changed B.9.1 Push model B.9.2 Publish and push model B.9.3 Push and pull model Figure B.16 \u2013 Push model: Material Lot added, Material Lot quantity changed Figure B.17 \u2013 Publish and push model: Material quantity changes <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | Figure B.18 \u2013 Push and pull model: Material quantity changes <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | Annex\u00a0C (informative)Questions on the use of transactions C.1 IDs C.2 Transactions C.3 Rollbacks C.4 CONFIRM verb C.5 Two phase commit <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | C.6 Confirm on GET C.7 General query C.8 Nouns C.9 CONFIRM on any verb <\/td>\n<\/tr>\n | ||||||
158<\/td>\n | Annex\u00a0D (informative)Patterns for verbs D.1 Patterns D.2 Actions for GET verb Table D.1 \u2013 GET message with Object ID specified <\/td>\n<\/tr>\n | ||||||
159<\/td>\n | D.3 Actions for PROCESS verb Table D.2 \u2013 GET message with wildcard in Object ID Table D.3 \u2013 GET message with no Object ID specified Table D.4 \u2013 PROCESS message with Object ID specified <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | D.4 Actions for CHANGE message Table D.5 \u2013 PROCESS message with no Object ID Table D.6 \u2013 CHANGE message with Object ID Table D.7 \u2013 CHANGE message with wildcard Object ID <\/td>\n<\/tr>\n | ||||||
161<\/td>\n | D.5 Actions for CANCEL message D.6 Actions for SYNC message Table D.8 \u2013 CANCEL message with Object ID Table D.9 \u2013 CANCEL message with wildcard in Object ID Table D.10 \u2013 SYNC message with Object ID <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | Table D.11 \u2013 SYNC message with wildcard in Object ID <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | Annex\u00a0E (informative)General rules for identifying nouns from object models E.1 Patterns E.2 Hierarchical object model <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | E.3 Non-hierarchical object model Figure E.1 \u2013 Object model with composite relationships <\/td>\n<\/tr>\n | ||||||
165<\/td>\n | Figure E.2 \u2013 Example of multiple composite objects <\/td>\n<\/tr>\n | ||||||
166<\/td>\n | Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Enterprise-control system integration – Business to manufacturing transactions<\/b><\/p>\n |