{"id":147460,"date":"2024-10-19T08:39:37","date_gmt":"2024-10-19T08:39:37","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-94-2016\/"},"modified":"2024-10-25T00:55:38","modified_gmt":"2024-10-25T00:55:38","slug":"ieee-c57-94-2016","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-94-2016\/","title":{"rendered":"IEEE C57.94 2016"},"content":{"rendered":"
Revision Standard – Active. Recommendations for operation and maintenance of dry-type distribution and power transformers are provided.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | IEEE Std C57.94-2015 Front Cover <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Important Notices and Disclaimers Concerning IEEE Standards Documents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Important Notice 1. Overview 1.1 Scope <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 1.2 Purpose 2. Normative references <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 3. Definitions 4. Application 4.1 Fire protection 4.2 Unusual operating conditions 4.2.1 High altitude operation 4.2.2 Impact loading 4.2.3 Over excitation 4.3 Surge voltage protection <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.4 Transient voltage protection 4.5 Environmental considerations 4.5.1 Ventilated and non-ventilated dry-type transformers 4.5.2 Sealed dry-type transformers 4.5.3 Hazardous areas 4.6 Maintenance accessibility 4.6.1 Clearance <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 4.6.2 Removal 4.7 Personnel and public safety 4.8 Room requirements <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4.9 Outdoor applications 4.10 Loading 4.10.1 Unusual conditions 4.10.2 Insulation system temperature class 4.11 Audible sound control 4.11.1 Audible sound sources <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.11.2 Control of audible sound sources 4.11.3 Control of audible sound transmission 5. Installation 5.1 Visual inspection 5.1.1 Inspection upon receipt 5.1.1.1 General <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 5.1.1.2 Ventilated and non-ventilated 5.1.1.3 Sealed 5.1.2 Inspection prior to energization 5.1.2.1 General 5.1.2.2 Sealed 5.2 Handling 5.2.1 Handling in inclement weather <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 5.2.2 Precautions in lifting 5.2.3 Skidding or rolling 5.2.4 Movement of a transformer 5.3 Grounding 6. Testing 6.1 General <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2 Pre-service tests 6.2.1 Recommended pre-service tests 6.2.2 Optional pre-service tests 6.3 Periodic tests 6.3.1 Recommended preventive maintenance tests 6.3.2 Optional preventive maintenance tests <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 6.4 Test procedures 6.4.1 Insulation resistance test 6.4.2 Insulation power factor test 7. Operation 7.1 De-energized tap changer 7.2 Effect of humidity on ventilated and non-ventilated dry-type transformers <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 7.3 Effect of pressure on sealed dry-type transformers 7.3.1 Dielectric strength and heat transfer 7.3.2 Overload 7.3.3 Gas condensation 7.3.4 Moisture 8. Maintenance 8.1 Periodic inspection and maintenance <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 8.1.1 Inspection of ventilated and non-ventilated dry-type transformers 8.1.2 Maintenance of ventilated and non-ventilated dry-type transformers 8.1.3 Inspection of sealed dry-type transformers 8.2 Storage 8.2.1 Ventilated and non-ventilated dry-type transformers <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | 8.2.2 Sealed dry-type transformers 8.3 Drying core and coil assembly 8.3.1 General 8.3.2 Drying by internal heat 8.3.3 Drying by external heat <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 8.3.4 Drying by external and internal heat 8.3.5 Determining drying time 8.3.5.1 General 8.3.5.2 Measurement of insulation resistance <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 8.3.6 Drying sealed dry type transformers 8.3.6.1 Removal of moisture 8.3.6.2 Resealing of case <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | Annex A (informative) Bibliography <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | Back cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Recommended Practice for Installation, Application, Operation, and Maintenance of Dry-Type Distribution and Power Transformers<\/b><\/p>\n |