{"id":126701,"date":"2024-10-19T05:39:49","date_gmt":"2024-10-19T05:39:49","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-6518-22024\/"},"modified":"2024-10-24T23:21:43","modified_gmt":"2024-10-24T23:21:43","slug":"bs-iso-6518-22024","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-6518-22024\/","title":{"rendered":"BS ISO 6518-2:2024"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nundefined <\/td>\n<\/tr>\n
6<\/td>\nForeword <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
9<\/td>\n1 Scope
2 Normative references
3 Terms and definitions
4 Ignition system description <\/td>\n<\/tr>\n
10<\/td>\n5 System load
6 Ignition parameter measurements
6.1 Available secondary (spark) voltage <\/td>\n<\/tr>\n
11<\/td>\n6.2 Secondary output voltage (open circuit coil secondary voltage)
6.3 Minimum available voltage (loaded secondary voltage) <\/td>\n<\/tr>\n
12<\/td>\n6.4 Secondary voltage at primary current switch on (feed forward voltage) <\/td>\n<\/tr>\n
13<\/td>\n6.5 Zener discharge current (peak spark current) <\/td>\n<\/tr>\n
14<\/td>\n6.6 Zener discharge duration
6.7 Zener discharge voltage <\/td>\n<\/tr>\n
15<\/td>\n6.8 Zener discharge energy <\/td>\n<\/tr>\n
16<\/td>\n6.9 Primary current (peak coil current) <\/td>\n<\/tr>\n
17<\/td>\n6.10 Average current input
6.11 Primary energy <\/td>\n<\/tr>\n
18<\/td>\n6.12 Coil secondary voltage risetime
6.13 Peak coil primary voltage <\/td>\n<\/tr>\n
19<\/td>\n6.14 Spark timing delay (time lag\/delay time) <\/td>\n<\/tr>\n
20<\/td>\n6.15 Dwell time or dwell angle <\/td>\n<\/tr>\n
21<\/td>\n7 Test equipment
7.1 Voltage probe (voltage divider)
7.2 Oscilloscope
7.3 Current probe <\/td>\n<\/tr>\n
22<\/td>\n7.4 DC source
7.5 Signal generator (arbitrary waveform generator)
7.6 Secondary loading
7.7 Test bench setup <\/td>\n<\/tr>\n
23<\/td>\n8 Test procedures for ignition system parameter measurements
8.1 General comments <\/td>\n<\/tr>\n
24<\/td>\n8.2 Secondary voltage measurements <\/td>\n<\/tr>\n
25<\/td>\n8.3 Secondary spark energy measurements <\/td>\n<\/tr>\n
26<\/td>\n8.4 Miscellaneous measurements <\/td>\n<\/tr>\n
27<\/td>\n9 Test procedures for ignition system parameter measurements <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Road vehicles. Ignition systems – Electrical performance and function test methods<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2024<\/td>\n30<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":126702,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[758,2641],"product_tag":[],"class_list":{"0":"post-126701","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-43-060-50","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/126701","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/126702"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=126701"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=126701"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=126701"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}