{"id":12390,"date":"2024-10-16T21:03:32","date_gmt":"2024-10-16T21:03:32","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/astm-e929-2009\/"},"modified":"2024-10-24T11:40:58","modified_gmt":"2024-10-24T11:40:58","slug":"astm-e929-2009","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/astm\/astm-e929-2009\/","title":{"rendered":"ASTM-E929 2009"},"content":{"rendered":"
Scope<\/strong><\/p>\n 1.1 This test method covers the determination of the composition of a materials stream in a solid waste resource recovery processing facility. The composition is determined with respect to one or more defined components. The results are used for determining the purity resulting from the operation of one or more separators, and in conjunction with Test Method E1108 used to measure the efficiency of a materials separation device.<\/p>\n 1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only.<\/p>\n 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For hazard statements, see Section 7.<\/span><\/span><\/p>\n Keywords<\/strong><\/p>\n Mass; Polynary separator; Purity analysis–environmental applications; Refuse-derived fuel (RDF); Separators (in municipal waste treatment)<\/p>\n ICS Code<\/strong><\/p>\n ICS Number Code 03.100.50 (Production. Production management)<\/p>\n DOI:<\/strong> 10.1520\/E0929-83R09<\/p>\n<\/div>\n E929-83(2009) Standard Test Method for Measuring Electrical Energy Requirements of Processing Equipment<\/b><\/p>\nPDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 1<\/td>\n Scope
Terminology
Summary of Test Method
Significance and Use <\/td>\n<\/tr>\n\n 2<\/td>\n Apparatus
Hazards
Equipment Calibration
Procedure
FIG. 1 <\/td>\n<\/tr>\n\n 3<\/td>\n Calculation <\/td>\n<\/tr>\n \n 4<\/td>\n FIG. 2 <\/td>\n<\/tr>\n \n 5<\/td>\n Precision and Bias
FIG. 3 <\/td>\n<\/tr>\n\n 6<\/td>\n A1. PROCEDURES FOR CHECKING METER INSTALLATIONS
A1.1 Single Phase
A1.2 Three-Phase, Three-Wire
A1.3 Three-Phase, Four-Wire Delta (Two Stators)
A1.4 Three-Phase, Four-Wire \u201cY\u201d\u009d (Two Stators)
A1.5 Time Load Method (Not to be used for calibration) <\/td>\n<\/tr>\n\n 7<\/td>\n TABLE A1.1 <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" \n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n ASTM<\/b><\/a><\/td>\n 2009<\/td>\n 7<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":12391,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[89,2637],"product_tag":[],"class_list":{"0":"post-12390","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-03-100-50","7":"product_cat-astm","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/12390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/12391"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=12390"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=12390"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=12390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}