Shopping Cart

No products in the cart.

WRC volume 40 No. 03-04:1985

$27.95

Progress Reports Volume 40 No. 03-04

Published By Publication Date Number of Pages
WRC 1985 106
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Contents

– Executive Committee Meeting, January 23, 1985
– Steering Committee on Piping Systems, January 22, 1985
– Technical Committee on Piping Systems, January 21, 1985
– Materials Division, January 23, 1985
– Subcommittee on Hydrogen Effects, January 22, 1985
– Subcommittee on Failure Modes in Pressure Vessel Materials, January 22, 1985
– Subcommittee on Pressure Vessel Steels, January 21, 1985
– Subcommittee on Nondestructive Examination of Pressure Components, January 22, 1985
– Design Division, January 23, 1985
– Subcommittee on Elevated Temperature Design, January 23, 1985
– Task Group on International Benchamark and Simplified Analysis Methods of Subcommittee on Elevated Temperature Design, January 22, 1985
– Task Group on Failure Mechanisms, January 22, 1985
– Subcommittee on Piping, Pumps and Valves, January 23, 1985
– Subcommittee on Shells and Ligaments, January 22, 1985
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, January 22, 1985
– Task Group on Dynamic Stress Criteria, January 22, 1985
– Subcommittee on Bolted Flanged Connections, January 23, 1985
– Task Group on Gasket Testing, January 21, 1985
– Subcommittee on Reinforced Openings and External Loadings, January 21, 1985
– Fabrication Division, January 22, 1985
– Subcommittee on Thermal and Mechanical Effects, January 22, 1985
– Subcommittee on Cyclic and Creep Behavior of Components, January 21, 1985
– Subcommittee on Significance of Weld Discontinuities, January 21, 1985
– Subcommittee on Weld Metals and Welding Procedures, January 21, 1985
– PVRC Future Meeting Dates

WRC volume 40 No. 03-04:1985
$27.95