WRC volume 39 No. 08:1984
$27.95
Progress Reports Volume 39 No. 08
Published By | Publication Date | Number of Pages |
WRC | 1984 | 94 |
Contents
– Executive Committee & Attachments, May 24, 1984
– Steering Committee on Piping Systems, May 22, 1984
– Materials Division & Attachment, May 24, 1984
– Subcommittee on Pressure Vessel Steels, April 17, 1984
– Subcommittee on Nondestructive Examination of Pressure Components, May 23, 1984
– Subcommittee on Hydrogen Effects, May 22, 1984
– Design Division, May 23, 1984
– Subcommittee on Bolted Flanged Connections, May 23, 1984
– Joint Task Group on Elevated Temperature Behavior of Bolted Flanges – (S/c on BFC & S/c on ETD), May 22, 1984
– Task Group on Gasket Testing, May 22, 1984
– Subcommittee on Reinforced Openings and External Loadings, May 21, 1984
– Subcommittee on Dynamic Analysis of Pressure Vessel Components, May 22, 1984
– Subcommittee on Piping, PUmps and Valves, May 23, 1984
– Subcommittee on Elevated Temperature Design, May 23, 1984
– Task Group on Int'l Benchmark and Simplified Analysis Methods (S/c on ETD), May 22, 1984
– Task Group on Failure Mechanisms (ETD), May 22, 1984
– Subcommittee on Shells and Ligaments, May 22, 1984
– Fabrication Division, May 23, 1984
– Subcommittee on Significance of Weld Discontinuities, May 22, 1984
– Subcommittee on Cyclic and Creep Behavior of Components, May 21, 1984
– PVRC Future Meeting Dates