SMACNA ThermosetFRPDuctConstructionManual 2016
$86.13
Thermoset FRP Duct Construction Manual, 2nd Edition
Published By | Publication Date | Number of Pages |
SMACNA | 2016 | 228 |
The second edition of the “Thermoset FRP Duct Construction Manual” is now available. Thisis an authoritative resource that design engineers, industrial engineering departments, pollution control authorities, FRP manufacturers, and installation contractors can rely upon for the proper selection, manufacture, and installation of FRP duct systems. This American National Standard (ANSI/SMACNA 011-2017) contains language, tables, and details for the construction of hand lay-up, spray-up, and filament wound FRP ductwork from 30 inch wg negative pressure to 30 inch wg positive pressure. Round ductwork sizes are expanded to include up to 96 inches diameter. For rectangular ductwork, new duct stiffener tables are added for easier selection. Recognizing the increased popularity of FRP ductwork, this expanded edition includes commercial/HVAC applications. Supporting this, an underground installation section is added as well as added language on testing and balancing, duct sealing, and duct leakage. Duct hangers and support information has been expanded and organized into a separate chapter which now includes: upper attachments, hanger selection tables, channel (strut) used as trapeze, riser support details, and more. Appendices cover: extended hanger spacing, general information on safe handling of thermoset fiberglass reinforced plastic duct, and allowable FRP defects.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Thermoset FRP Duct Construction Manual Cover page |
3 | Title page |
4 | Copyright page |
5 | FOREWORD |
6 | FRP TASK FORCE |
7 | NOTICE TO USERS OF THIS PUBLICATION |
9 | TABLE OF CONTENTS |
17 | CHAPTER 1 INTRODUCTION |
19 | 1.1 SCOPE 1.2 USES 1.3 TERMINOLOGY 1.4 WHAT IS FRP |
20 | 1.5 PURPOSE 1.6 TESTING AND BALANCING COORDINATION 1.7 DUCT SEALING – COMMERCIAL HVAC APPLICATIONS |
21 | 1.8 DUCT LEAKAGE TESTS 1.9 CONTENTS |
25 | CHAPTER 2 MATERIALS |
27 | 2.1 INTRODUCTION 2.2 THERMOSET RESINS |
29 | 2.3 CATALYSTS, PROMOTERS, INHIBITORS, AND OTHER ADDITIVES 2.4 FLAME SPREAD AND SMOKE PRODUCTION |
30 | 2.5 ULTRAVIOLET COATINGS 2.6 TYPES OF REINFORCEMENT |
33 | CHAPTER 3 LAMINATE CONSTRUCTION |
35 | 3.1 INTRODUCTION 3.2 CONTACT MOLDING 3.3 CORROSION BARRIER RESIN 3.4 CORROSION BARRIER 3.5 STRUCTURAL LAYER 3.6 EXTERIOR SURFACE |
37 | 3.7 WALL THICKNESS 3.8 MINIMUM LAMINATE PHYSICAL CHARACTERISTICS 3.9 BOND CONSTRUCTION 3.10 MECHANICAL PROPERTIES |
42 | 3.11 LINEAR COEFFICIENT OF THERMAL EXPANSION 3.12 STATIC ELECTRICITY 3.13 FIBER REINFORCEMENT 3.14 DESIGN REQUIREMENTS |
45 | CHAPTER 4 JOINING PROCEDURES |
47 | 4.1 INTRODUCTION 4.2 PREPARATION FOR JOINING DUCT 4.3 PREPARATION OF STRAPPING 4.4 JOINING DUCT |
50 | 4.5 INTERNAL JOINT LAMINATING PROCEDURE 4.6 RAW EDGES 4.7 JOINTS (WELDS OR BONDS) 4.8 SECONDARY BONDING 4.9 JOINT INSTALLATION 4.10 CLEAN–UP |
51 | CHAPTER 5 DESIGN OF ROUND FRP DUCT |
53 | 5.1 DESIGN OF ROUND FRP DUCTS USING TYPES I AND II LAMINATES |
54 | 5.2 DESIGN OF ROUND FRP DUCT SUSING FILAMENT WOUND (TYPE X) LAMINATES |
61 | CHAPTER 6 DESIGN OF RECTANGULAR FRP DUCT |
63 | 6.1 DESIGN OF RECTANGULAR FRP DUCTS USING TYPE I AND II LAMINATES |
64 | 6.2 SELECTION OF STIFFENERS AND FLANGES FOR RECTANGULAR DUCT SYSTEMS |
71 | 6.3 RECTANGULAR DUCT CORNERS |
77 | CHAPTER 7 FLANGES AND FITTINGS |
79 | 7.1 FLANGE REQUIREMENTS |
82 | 7.2 FITTING REQUIREMENTS |
95 | CHAPTER 8 HANGERS AND SUPPORTS |
97 | 8.1 INTRODUCTION AND SCOPE 8.2 HANGERS AND SUPPORTS COMMENTARY 8.3 GENERAL GUIDELINES |
98 | 8.4 METHODS FOR HANGING AND SUPPORTING DUCT |
103 | 8.5 DUCT HANGERS AND SUPPORTS |
113 | CHAPTER 9 COMPONENTS AND ACCESSORIES |
115 | 9.1 FUME HOODS 9.2 DAMPERS |
116 | 9.3 ACCESS OPENINGS AND END CAPS 9.4 LOUVERS AND EXHAUST STACKS 9.5 FLEXIBLE CONNECTIONS 9.6 FLEXIBLE MATERIALS |
125 | CHAPTER 10 SPECIALTY SYSTEMS |
127 | 10.1 UNDERGROUND FRP DUCT INSTALLATION |
138 | 10.2 CONDENSATE DRAINAGE 10.3 SPRINKLERS 10.4 DRAINS |
141 | CHAPTER 11 QUALITY CONTROL, USER INSPECTION AND SHIPPING AND HANDLING |
143 | 11.1 QUALITY CONTROL |
144 | 11.2 USER INSPECTION 11.3 MATERIAL HANDLING AND SHIPPING |
147 | CHAPTER 12 FRP GUIDE SPECIFICATIONS |
149 | 12.1 GENERAL 12.2 DRAWINGS 12.3 SEISMIC RESTRAINT PROVISIONS 12.4 GUIDE SPECIFICATIONS |
159 | APPENDIX A DEVELOPMENT OF THE TABLES |
183 | APPENDIX B CHEMICAL RESISTANCE OF FRP DUCT |
187 | APPENDIX C ALTERNATE ROUND DUCT DESIGN TABLES |
195 | APPENDIX D EXTENDED HANGER SPACING |
199 | APPENDIX E SAFE HANDLING OF FRP DUCT |
207 | APPENDIX F ALLOWABLE FRP DEFECTS |
211 | APPENDIX G GLOSSARY |
219 | APPENDIX H REFERENCED DOCUMENTS |
223 | APPENDIX I FORMER COMMITTEE MEMBERS AND OTHER CONTRIBUTORS |