IEEE C57.150 2013
$46.04
IEEE Guide for the Transportation of Transformers and Reactors Rated 10 000 kVA or Higher
Published By | Publication Date | Number of Pages |
IEEE | 2013 | 52 |
New IEEE Standard – Active. Information for minimizing the risk of damage and delays during transportation of transformers and reactors rated 10 000 kVA or higher is provided in this guide.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std C57.150-2012 Front Cover |
3 | Title page |
6 | Notice to users Laws and regulations Copyrights Updating of IEEE documents Errata Patents |
8 | Participants |
10 | Introduction |
11 | Contents |
13 | Important notice 1. Overview 1.1 Scope 1.2 Purpose |
14 | 2. Normative references 3. Definitions |
17 | 4. Request for quotation and specification |
18 | 5. Design considerations for transport 5.1 New transformers and reactors |
19 | 5.2 Existing transformers and reactors |
20 | 6. Transportation preparation 6.1 Main transformer or reactor tank |
23 | 6.2 Transportation preparation—accessories |
26 | 7. Planning for heavy-haul transportation 7.1 Heavy-haul situations 7.2 Identifying suitable heavy-hauler companies |
27 | 7.3 Determinations of actual equipment transportation dimensions |
28 | 7.4 Route inspections and verification of transportation route |
29 | 7.5 Selection of proper heavy-haul equipment |
30 | 7.6 Applicable safety and environmental requirements, regulations, and laws 7.7 Permits 7.8 Insurance coverage |
31 | 8. Transport 8.1 Transportation information 8.2 Transport terminology |
33 | 8.3 Barge and ocean vessels |
36 | 8.4 Rail |
39 | 8.5 Air cargo |
40 | 8.6 Arrival at destination 9. Heavy-haul transportation 9.1 Condition of heavy-haul equipment |
41 | 9.2 Inspection of equipment prior to receiving 9.3 Offloading the equipment onto heavy-haul transportation equipment 9.4 Securing the load |
42 | 9.5 Transportation to the destination 10. Arrival (receipt) inspection 10.1 Preparation for inspection |
43 | 10.2 Visual checks |
44 | 10.3 Offloading considerations |
45 | 10.4 Up-righting of large shell-form transformers or reactors 10.5 Inspection and offloading of separately shipped parts and components accessories |
46 | 10.6 Internal inspection |
47 | 10.7 Electrical tests |
51 | 10.8 Mechanical tests |
52 | Annex A (informative) Bibliography |