IEEE 336 2006
$37.38
IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities
Published By | Publication Date | Number of Pages |
IEEE | 2006 | 25 |
Revision Standard – Inactive – Superseded. This guide provides considerations for the pre-installation, installation, inspection, and testing of Class 1E power, instrumentation, and control equipment and systems of a nuclear facility. This guidance is applicable to initial construction, modification (backfit), and maintenance activities. This guide does not apply to periodic testing.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Con… |
6 | Introduction Notice to users Errata |
7 | Interpretations Patents Participants |
10 | Contents |
13 | IEEE Guide for Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Nuclear Facilities 1. Overview 1.1 Scope 1.2 Purpose |
14 | 1.3 Applicability 1.4 Responsibility 2. Normative references |
15 | 3. Definitions |
16 | 4. General considerations for initial construction, modification, andmaintenance 4.1 General 4.2 Configuration management |
17 | 4.3 Planning 4.4 Closeout tracking |
18 | 4.5 Procedures 4.6 Measuring and test equipment 4.7 Personnel qualification 4.8 Test data evaluation |
19 | 4.9 Results 4.10 Nonconforming items 4.11 Records 5. Pre-installation constructability review |
20 | 6. Installation/Construction 6.1 Equipment placement 6.2 Engineering procedures and specifications 6.3 Verification during installation |
21 | 6.4 Post-installation inspections |
22 | 6.5 Inspections of temporary conditions 7. Testing 7.1 General 7.2 Material source testing 7.3 Electrical tests 7.4 Physical and chemical tests |
23 | 7.5 Mechanical tests 7.6 Equipment functional tests 7.7 System tests 7.8 Post-modification/maintenance testing plan (PMTP) |
24 | 8. Supplementary provisions for multi-unit facilities 8.1 General 8.2 Planning and preparation |
25 | 8.3 Work tagging considerations 8.4 Protection of existing unit(s) Common area restriction |