Florida Building Code -Test Protocols for High Velocity Hurricane Zone, Eighth Edition

Published By Publication Date Number of Pages
FL 2023 421
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The Eighth Edition (2023) update to the Florida Building Code:Test Protocols for High Velocity Hurricane Zone updates the Seventh Edition 2020 Florida Building Code: Test Protocols for High Velocity Hurricane Zone. Adopted state. Effective Date: December 31, 2023.

PDF Catalog

PDF Pages PDF Title
1 2023 FLORIDA BUILDING CODE EIGHTH EDITION TEST PROTOCOLS FOR HIGH-VELOCITY HURRICANE ZONES
2 2023 FLORIDA BUILDING CODE EIGHTH EDITION TEST PROTOCOLS FOR HIGH-VELOCITY HURRICANE ZONES
3 COPYRIGHT
4 PREFACE
6 TABLE OF CONTENTS
8 ROOFING APPLICATION STANDARD (RAS) No. 109
14 ROOFING APPLICATION STANDARD (RAS) No. 109-A DETAIL DRAWINGS
DETAIL 1
15 DETAIL 2
DETAIL 3
16 DETAIL 4
DETAIL 5
17 DETAIL 6
DETAIL 7
18 DETAIL 8
DETAIL 9
19 DETAIL 10
DETAIL 11
20 ROOFING APPLICATION STANDARD (RAS) No. 111-20 STANDARD REQUIREMENTS FOR ATTACHMENT OF PERIMETER WOODBLOCKING AND METAL FLASHING
TABLE 1 MARGINS OF SAFETY FOR LABORATORY WITHDRAWAL RESISTANCE TESTING
23 TABLE 2 HOOK STRIP/CONTINUOUS CLEAT THICKNESS REQUIREMENTS FOR EDGE METAL AND COPINGS FACE DIMENSIONS
24 FIGURE 1 DETAIL OF “BUTT-JOINT” METHOD FOR ADJACENT DRIP EDGE/GRAVEL STOP SECTIONS
25 FIGURE 2 EXAMPLE OF RAISED EDGE AT GRAVEL STOP PERIMETER FLASHING
26 FIGURE 3 EXAMPLE OF A PERIMETER FLASHING FOR CONFIGURATIONS INCLUDING A CONTINUOUS CLEAT
FIGURE 4 USE OF HEAVY EXTRUDED GRAVEL STOP WITH HORIZONTAL FLANGE OF LESSER THICKNESS
28 FIGURE 5 EXAMPLE OF REGLET MOUNTED COUNTER-FLASHING
29 FIGURE 6 EXAMPLE OF STUCCO COUNTER-FLASHING
30 FIGURE 7 TYPICAL SILL FLASHING CONFIGURATIONS
31 FIGURE 8 METAL BASE FLASHING CONNECTION WITH VERTICAL WALL
32 FIGURE 9 EXAMPLE OF ADHERED MEMBRANE ROOF SYSTEM ASSEMBLY TERMINATION
34 ROOFING APPLICATION STANDARD (RAS) No. 113 STANDARD REQUIREMENTS FOR JOB SITE MIXING OF ROOF TILE MORTAR
36 ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALT SHINGLE INSTALLATION
37 DETAIL A
39 DETAIL B
40 DETAIL C
42 ROOFING APPLICATION STANDARD (RAS) No. 117-20 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/ORBASE SHEETS TO SUBSTRATES
43 FIGURE 5 USE OF STEEL SHEET TO ENSURE SUPPORT OF INSULATION PANEL GAGES
45 TABLE 1 SQUARE FEET PER FASTENER FOR COMMON ANCHOR/BASE SHEET ATTACHMENT PATTERNS
48 TABLE 2 TYPICAL FASTENER VALUES FOR ARCHITECTURAL APPEARANCE APPLICATIONS
TABLE 3 TYPICAL ‘DYNAMIC PULL THROUGH VALUES’ FOR ARCHITECTURAL APPEARANCE APPLICATIONS
50 FIGURE 1 FASTENER PLACEMENT FOR 2 FOOT BY 4 FOOT BOARDS
51 FIGURE 2 FASTENER PLACEMENT FOR 4 FOOT BY 4 FOOT BOARDS
52 FIGURE 3 FASTENER PLACEMENT FOR 4 FOOT BY 4 FOOT BOARDS
53 FIGURE 4 FASTENER PLACEMENT FOR 4 FOOT BY 8 FOOT BOARDS
54 ROOFING APPLICATION STANDARD (RAS) No. 118-20 INSTALLATION OF MECHANICALLY FASTENED ROOF TILE SYSTEMS Direct Deck & Counter Battens Only
TABLE 1
56 DRAWING 1 TYPICAL 30/90 HOT MOP
57 DRAWING 2 DRIP EDGE INSTALLATION
58 DRAWING 3 TYPICAL VALLEY INSTALLATION
59 DRAWING 4 VALLEY METAL STRIPPED IN
60 DRAWING 5 WALL FLASHING DETAIL
DRAWING 6 WALL FLASHING DETAIL (WALL FLASHING OVER CAP SHEET)
61 DRAWING 7 WALL FLASHING DETAIL(WALL FLASHING OVER CAP SHEET)
62 DRAWING 8 LEAD STACK DETAIL (OVER THE CAP SHEET)
DRAWING 9 LEAD STACK DETAIL (OVER THE BASE SHEET)
DRAWING 10 EAVE TILE DETAIL (NAIL-ON EPDM EAVE ENCLOSURE)
63 DRAWING 11 EAVE TILE DETAIL (NAIL-ON METAL ENCLOSURE)
DRAWING 12 EAVE TILE DETAIL (NAIL-ON ANTIPONDING METAL)
65 DRAWING 13 RIDGE BLOCKING DETAIL
68 ROOFING APPLICATION STANDARD (RAS) No. 119-20 INSTALLATION OF MECHANICALLY FASTENED ROOF TILE SYSTEMS Direct Deck & Horizontal Battens Only
TABLE 1
70 DRAWING 1 TYPICAL 30/90 HOT MOP
71 DRAWING 2 DRIP EDGE INSTALLATION
72 DRAWING 3 PERFORMED CLOSED VALLEY (NAIL-ON SYSTEM)
73 DRAWING 4 VALLEY METAL DETAIL (NAIL-ON SYSTEM)
DRAWING 5 NAIL-ON VALLEY SYSTEM VALLEY METAL OVER TILE
74 DRAWING 6 WALL FLASHING DETAIL (NAIL-ON SYSTEM)
DRAWING 7 PLUMBING STACKS (NAIL-ON SYSTEMS)
DRAWING 8 PLUMBING STACKS FLASHING (NAIL-ON SYSTEMS)
75 DRAWING 9 EAVE TILE DETAIL (NAIL-ON EPDM EAVE ENCLOSURE)
DRAWING 10 EAVE TILE DETAIL (NAIL-ON METAL EAVE ENCLOSURE)
DRAWING 11 EAVE TILE DETAIL (NAIL-ON ANTIPONDING ENCLOSURE)
77 DRAWING 12 HIP RIDGE TILE NAILING DETAIL
80 ROOFING APPLICATION STANDARD (RAS) No. 120-20 MORTAR AND ADHESIVE SET TILE APPLICATION
TABLE 1
82 DRAWING 1 TYPICAL 30/90 HOT MAP
83 DRAWING 2 DRIP EDGE INSTALLATION
84 DRAWING 3 TYPICAL VALLEY INSTALLATION
85 DRAWING 4 VALLEY METAL STRIPPED IN
86 DRAWING 5 WALL FLASHING DETAIL (COUNTER FLASHING WITH CAULKED BEAD)
DRAWING 6 WALL FLASHING DETAIL (STUCCO STOP DETAIL)
DRAWING 7 WALL FLASHING DETAIL (WALL FLASHING OVER CAP SHEET)
87 DRAWING 8 LEAD STACK DETAIL (OVER THE CAPSHEET)
DRAWING 9 LEAD STACK DETAIL (OVER THE BASE SHEET)
DRAWING 10 EAVE TILE DETAIL EPDM EAVE CLOSURE
88 DRAWING 11 EAVE TILE DETAIL(METAL EAVE ENCLOSURE)
DRAWING 12 EAVE TILE DETAIL ANTIPONDING METAL
89 DRAWING 13 MORTAR (ADHESIVE) SET TILE
DRAWING 14 BARREL TILE INSTALLATION
90 DRAWING 15 RIDGE BLOCKING DETAIL
DETAIL 1
DETAIL 2
DETAIL 3
DETAIL 4
DETAIL 5
STEEL PLATE DETAIL
92 ROOFING APPLICATION STANDARD (RAS) No. 127-20 PROCEDURE FOR DETERMINING THE MOMENT OF RESISTANCE AND MINIMUM CHARACTERISTIC RESISTANCE LOAD TO INSTALL A TILE SYSTEM ON A BUILDING OF A SPECIFIED ROOF SLOPE AND HEIGHT USING ALLOWABLE STRESS DESIGN (ASD) IN ACCORDANCE WITH ASCE 7
93 TABLE 1 — GABLE ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—1.5:12 TO LESS THAN 4.5:12RISK CATEGORY II EXPOSURE CATEGORY “C”
TABLE 2 — GABLE ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—4.5:12 TO LESS THAN 6:12RISK CATEGORY II EXPOSURE CATEGORY “C”
94 TABLE 3 — GABLE ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—6:12 TO 12:12RISK CATEGORY II EXPOSURE CATEGORY “C”
TABLE 4 — GABLE ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—1.5:12 TO LESS THAN 4.5:12RISK CATEGORY II EXPOSURE CATEGORY “D”
TABLE 5 — GABLE ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—4.5:12 TO LESS THAN 6:12RISK CATEGORY II EXPOSURE CATEGORY “D”
95 TABLE 6 — GABLE ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—6:12 TO 12:12RISK CATEGORY II EXPOSURE CATEGORY “D”
TABLE 7 — HIP ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—1.5:12 TO LESS THAN 4.5:12RISK CATEGORY II EXPOSURE CATEGORY “C”
96 TABLE 8 — HIP ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—4.5:12 TO LESS THAN 6:12RISK CATEGORY II EXPOSURE CATEGORY “C”
TABLE 9 — HIP ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—6:12 TO 12:12RISK CATEGORY II EXPOSURE CATEGORY “C”
TABLE 10 — HIP ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—1.5:12 TO LESS THAN 4.5:12RISK CATEGORY II EXPOSURE CATEGORY “D”
97 TABLE 11 — HIP ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—4.5:12 TO LESS THAN 6:12RISK CATEGORY II EXPOSURE CATEGORY “D”
TABLE 12 — HIP ROOFS MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—6:12 TO 12:12RISK CATEGORY II EXPOSURE CATEGORY “D”
FIGURE 3
98 TABLE 13 WHERE TO OBTAIN INFORMATION
100 ROOFING APPLICATION STANDARD (RAS) No. 128-20 STANDARD PROCEDURE FOR DETERMINING APPLICABLE WIND ALLOWABLE STRESS DESIGN PRESSURES FOR LOW SLOPE ROOF IN ACCORDANCE WITH ASCE 7
TABLE 1 MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—LESS THAN 11/2:12 RISK CATEGORY II EXPOSURE CATEGORY “C”
101 TABLE 2 MINIMUM ASD DESIGN WIND UPLIFT PRESSURES IN PSF FOR ROOF SLOPE—LESS THAN 11/2:12 RISK CATEGORY II EXPOSURE CATEGORY “D”
102 ROOFING APPLICATION STANDARD (RAS) No. 130-20 INSTALLATION CRITERIA FOR WOOD ROOF SHINGLES AND SHAKES APPLICATION
TABLE 1 MAXIMUM EXPOSURE TO WEATHER FOR WOOD SHINGLES AND SHAKES IN INCHES
106 DETAIL A
107 DETAIL B
DETAIL C
108 DETAIL D
110 ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURE FOR INSTALLATION OF METAL ROOF SYSTEMS
FIGURE 1 EXAMPLE OF PANEL CLEAT
111 FIGURE 2 TYPICAL EAVE TERMINATION DETAIL WITH CLOSURE STRIP
FIGURE 3 TYPICAL PROFILES OF RAKE WALL FLASHINGS
112 FIGURE 4 TYPICAL RAKE PROFILES
113 FIGURE 6 TYPICAL CURB FLASHING
FIGURE 7A PENETRATION FLASHING
FIGURE 7B PENETRATION FLASHING
114 FIGURE 8 ELASTOMERIC FLASHING
FIGURE 9 RECOMMENDED STANDING SEAM VALLEY
115 FIGURE 10 RIBBED PANEL VALLEY
FIGURE 11 SEALED LOW SLOPE VALLEY LAP
116 FIGURE 12 TRANSITION WITH KNEE BENDS
FIGURE 13 TRANSITION FLASHINGS AT HEADWALL CONDITION
118 ROOFING APPLICATION STANDARD (RAS) No. 137 STANDARD REQUIREMENTS FOR MECHANICAL ATTACHMENT OF SINGLE-PLY ROOF COVERINGS TO VARIOUS SUBSTRATES
122 ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS
123 TABLE 1(3)
127 TABLE 2 MECHANICALLY FASTENED INSULATION FOR BUILDINGS 40 FEET OR LESS IN HEIGHT
128 TESTING APPLICATION STANDARD (TAS) No. 100-23 TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE OF DISCONTINUOUS ROOF SYSTEMS
129 FIGURE 1 WIND DRIVEN RAIN TEST FRAME
FIGURE 2 WIND DRIVEN RAIN WIND TUNNEL
134 TESTING APPLICATION STANDARD (TAS) No. 100(A)-23 TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE AND/OR INCREASED WINDSPEED RESISTANCE OF SOFFIT VENTILATION STRIP AND CONTINUOUS OR INTERMITTENT VENTILATION SYSTEM INSTALLED AT THE RIDGE AREA
137 TABLE 1 WINDSPEED AND WATER SPRAY INTERVALS FOR WIND DRIVEN RAIN RESISTANCE TESTING
138 TABLE 2 WINDSPEED INTERVALS FOR INCREASED WIND RESISTANCE TESTING OF STATIC VENTS, TURBINES1 OR POWERED VENTS
139 TABLE 3 INCREASED WINDSPEED VS. INSTALLATION HEIGHT
140 FIGURE 1A WIND DRIVEN RAIN TEST FRAME, FRONT VIEW
141 FIGURE 1B WIND DRIVEN RAIN TEST FRAME, SIDE VIEW
FIGURE 2 WIND DRIVEN RAIN WIND TUNNEL
142 TESTING APPLICATION STANDARD (TAS) No. 101-95 TEST PROCEDURE FOR STATIC UPLIFT RESISTANCE OF MORTAR OR ADHESIVE SET TILE SYSTEMS
149 FIGURE 1 STATIC UPLIFT APPARATUS
150 TESTING APPLICATION STANDARD (TAS) No. 102-95 TEST PROCEDURE FOR STATIC UPLIFT RESISTANCE OF MECHANICALLY ATTACHED, RIGID ROOF SYSTEMS [For Mechanically Attached, Rigid Roof Systems Accompanied by a Clip, Refer to TAS 102(A)]
157 FIGURE 1 STATIC UPLIFT TEST APPARATUS
158 TESTING APPLICATION STANDARD (TAS) No. 102(A)-95 TEST PROCEDURE FOR STATIC UPLIFT RESISTANCE OF MECHANICALLY ATTACHED, CLIPPED, RIGID, ROOF SYSTEMS(For Methods of Mechanical Attachment Excluding Clips, Refer to TAS 102)
165 FIGURE 1 STATIC UPLIFT TEST APPARATUS
166 TESTING APPLICATION STANDARD (TAS) No. 103-20 TEST PROCEDURE FOR SELF-ADHERED UNDERLAYMENTS FOR USE IN TILE ROOF SYSTEMS
168 TABLE 1 MINIMUM BREAKING STRENGTH VALUES
169 TABLE 2 MINIMUM ELONGATION VALUES (%)
173 TABLE 24.1
TABLE 24.2
174 FIGURE 1
176 TESTING APPLICATION STANDARD (TAS) No. 104-20 TEST PROCEDURE FOR NAIL-ON UNDERLAYMENT FOR USE IN TILE ROOF SYSTEMS
178 TABLE 1 MINIMUM BREAKING STRENGTH VALUES (%)
TABLE 2 MINIMUM ELONGATION VALUES (%)
182 TABLE 20.1
183 TABLE 20.2
FIGURE 1
FIGURE 2
184 TESTING APPLICATION STANDARD (TAS) No. 105-20 TEST PROCEDURE FOR FIELD WITHDRAWAL RESISTANCE TESTING
185 TABLE 1 VALUES FOR T-ESTIMATOR AT 95% PROBABILITY
188 TESTING APPLICATION STANDARD (TAS) 105-20 APPENDIX A FIELD WITHDRAWAL RESISTANCE TEST RESULTS REPORT
194 TESTING APPLICATION STANDARD (TAS) No. 106 STANDARD PROCEDURE FOR FIELD VERIFICATION OF THE BONDING OF MORTAR OR ADHESIVE SET TILE SYSTEMS AND MECHANICALLY ATTACHED, RIGID, DISCONTINUOUS ROOF SYSTEMS
196 TESTING APPLICATION STANDARD (TAS) No. 107-20 TEST PROCEDURE FOR WIND RESISTANCE TESTING OF NON-RIGID, DISCONTINUOUS ROOF SYSTEM ASSEMBLIES(Modified from ASTM D3161)
200 TESTING APPLICATION STANDARD (TAS) No. 108-95 TEST PROCEDURE FOR WIND TUNNEL TESTING OF AIR PERMEABLE, RIGID, DISCONTINUOUS ROOF SYSTEMS
206 FIGURE 1 WIND TUNNEL TEST APPARATUS
207 FIGURE 2 WIND TUNNEL TEST APPARATUS (SIDE VIEW)
208 TESTING APPLICATION STANDARD (TAS) No. 110-2000 TESTING REQUIREMENTS FOR PHYSICAL PROPERTIES OF ROOFMEMBRANES, INSULATION, COATINGS AND OTHER ROOFING COMPONENTS
TABLE 2(A)
209 TABLE 2(B)
TABLE 3
TABLE 4
210 TABLE 5
TABLE 6
TABLE 7
211 TABLE 8
212 TABLE 9
TABLE 10
213 TABLE 11(A)
TABLE 11(B)
214 TABLE 14
TABLE 15
215 TABLE 17
218 TESTING APPLICATION STANDARD (TAS) No. 111(A)-95 TEST PROCEDURE FOR ROOF EDGE TERMINATION PERFORMANCE
219 FIGURE 1 MEMBRANE TERMINATION PERFORMANCE TEST CONFIGURATION OPTION
FIGURE 2 MEMBRANE TERMINATION PERFORMANCE TEST CONFIGURATION OPTION
220 TESTING APPLICATION STANDARD (TAS) No. 111(B)-95 TEST PROCEDURE FOR EDGE METAL PULL-OFF PERFORMANCE
222 FIGURE 1 VIEW OF OUTWARD LOADING OF EDGE METAL VERTICAL FLANGE (UPWARD LOADING OF HORIZONTAL FLANGE ALSO REQUIRED)
224 TESTING APPLICATION STANDARD (TAS) No. 111(C)-95 TEST PROCEDURE FOR COPING CAP PULL-OFF PERFORMANCE
226 FIGURE 1 VIEW OF OUTWARD LOADING OF COPING CAP VERTICAL FLANGE (OUTWARD LOADING OF OTHER VERTICAL FLANGE ALSO REQUIRED)
FIGURE 2 VIEW OF OUTWARD LOADING OF COPING CAP VERTICAL FLANGE (UPWARD LOAD RESISTANCE)
228 TESTING APPLICATION STANDARD (TAS) No. 112-95 STANDARD REQUIREMENTS FOR CONCRETE ROOF TILES
233 TABLE 1 TRANSVERSE BREAKING STRENGTH, MINIMUM LBF (N)
TABLE 2 TILE RATINGS AND MAXIMUM WATER ABSORPTION
TABLE 3 NUMBER OF TILES TO BE RE-TESTED
TABLE 4 RETEST CRITERIA (FAILURE RATE REQUIRED)
235 FIGURE 1 TRANSVERSE STRENGTH TEST APPARATUS
FIGURE 2 PERMEABILITY TEST APPARATUS
236 TESTING APPLICATION STANDARD (TAS) No. 112-95 Appendix A CLARIFICATION OF TESTING FREQUENCY AND SAMPLING METHOD
238 TESTING APPLICATION STANDARD (TAS) 114-11 TEST PROCEDURES FOR ROOFING ASSEMBLIES IN THE HIGH-VELOCITY HURRICANE ZONE JURISDICTIONTABLE OF CONTENTS
240 TESTING APPLICATION STANDARD (TAS) No. 114-11 TEST PROCEDURES FOR ROOFING ASSEMBLIES IN THE HIGH-VELOCITY HURRICANE ZONE JURISDICTION
250 TESTING APPLICATION STANDARD (TAS) 114-11 APPENDIX ATEST PROCEDURE FOR ABOVE DECK COMBUSTIBILITY ASTM E108
252 TESTING APPLICATION STANDARD (TAS) 114-11 APPENDIX BTEST PROCEDURE FOR SIMULATED DYNAMIC UPLIFT PRESSURE RESISTANCE OF MECHANICALLY ATTACHED ROOFING ASSEMBLIES
254 TABLE B1 DYNAMIC PRESSURE GUST INTERVALS
255 FIGURE B1 DYNAMIC UPLIFT TEST APPARATUS
256 TESTING APPLICATION STANDARD (TAS) 114-95 APPENDIX CTEST PROCEDURE FOR SIMULATED UPLIFT PRESSURE RESISTANCE OF ROOFING ASSEMBLIES
257 TABLE C1 UPLIFT PRESSURE INTERVALS
259 FIGURE C1 UPLIFT PRESSURE TEST APPARATUS
FIGURE C2 UPLIFT PRESSURE TEST SPECIMEN MOUNTED IN TEST
260 TESTING APPLICATION STANDARD (TAS) 114-11 APPENDIX DTEST PROCEDURE FOR SIMULATED UPLIFT PRESSURE RESISTANCE OF ADHERED ROOFING ASSEMBLIES
261 APPARATUS TABLE D1 UPLIFT LOAD INTERVALS AND CORRESPONDING PRESSURES
262 TESTING APPLICATION STANDARD (TAS) 114-11 APPENDIX ETEST PROCEDURE FOR CORROSION RESISTANCE OF FASTENERS, BATTEN BARS AND STRESS DISTRIBUTION PLATES
266 TESTING APPLICATION STANDARD (TAS) 114-11 APPENDIX FTEST PROCEDURE FOR SUSCEPTIBILITY TO HAIL DAMAGE FOR ROOFING SYSTEMS
268 TESTING APPLICATION STANDARD (TAS) 114-11 APPENDIX GTEST PROCEDURE FOR SUSCEPTIBILITY TO LEAKAGE FOR ROOFING SYSTEMS
270 TESTING APPLICATION STANDARD (TAS) 114-95 APPENDIX HTEST PROCEDURES FOR SMALL SCALE QC AND PHYSICAL PROPERTIES OF APPROVED ROOFING SYSTEMS
272 TESTING APPLICATION STANDARD (TAS) 114-95 APPENDIX I TEST PROCEDURE FOR STATIC AND DYNAMIC PUNCTURE RESISTANCE OF ROOFING ASSEMBLIES
277 FIGURE I1 STATIC PUNCTURE TEST APPARATUS
FIGURE I2 DYNAMIC PUNCTURE TEST APPARATUS
278 FIGURE I3 TYPICAL DYNAMIC PUNCTURE HEAD
280 TESTING APPLICATION STANDARD (TAS) 114-11 APPENDIX JTEST PROCEDURE FOR 12 FOOT BY 24 FOOT SIMULATED UPLIFT PRESSURE RESISTANCE OF ROOFING ASSEMBLIES
282 TABLE J1 12 FOOT BY 24 FOOT UPLIFT PRESSURE INTERVALS
284 TESTING APPLICATION STANDARD (TAS) 116-95 TEST PROCEDURE FOR AIR PERMEABILITY TESTING OF RIGID, DISCONTINUOUS ROOF SYSTEMS
286 TABLE 1 NUMBER OF COURSES AND NUMBER OF COMPONENTS PER COURSE
289 FIGURE 1 AIR PERMEABILITY TEST APPARATUS
290 TESTING APPLICATION STANDARD (TAS) 117(A)-95 TEST PROCEDURE FOR WITHDRAWAL RESISTANCE TESTING OF MECHANICAL FASTENERS USED IN ROOF SYSTEM ASSEMBLIES
294 TESTING APPLICATION STANDARD (TAS) 117(B)-95 TEST PROCEDURE FOR DYNAMIC PULL-THROUGH PERFORMANCE OF ROOFING MEMBRANES OVER FASTENER HEADS OR FASTENERS WITH METAL BEARING PLATES
296 FIGURE 1 HOLDING DEVICE CONFIGURATION
297 FIGURE 2 HOLDING DEVICE CONFIGURATION FOR LAPPED TEST SPECIMENS
FIGURE 3 HOLDING DEVICE CONFIGURATION FOR ROOFING OR CAP NAIL TESTING (SEE NOTE IN SECTION 4.2 HEREIN)
298 FIGURE 4 VIEW OF DYNAMIC PULL-THROUGH TESTING
300 TESTING APPLICATION STANDARD (TAS) 117(C)-95 TEST PROCEDURE FOR DYNAMIC PULL-OFF PERFORMANCE OF ROOFING FASTENER HEADS OR FASTENERS WITH BEARING PLATES
301 TABLE 1 FASTENER ASSEMBLY PULL-OFF VALUESVS. DROP HEIGHT
303 FIGURE 1 DIAGRAM OF DYNAMIC PULL-OFF TEST APPARATUS
304 FIGURE 2 DIAGRAM OF WIRE REINFORCED TEST STRAP
FIGURE 3 PHOTOGRAPH OF TYPICAL WIRE REINFORCED TEST STRAP
305 FIGURE 4 PHOTOGRAPH OF DYNAMIC PULL-OFF TESTING
FIGURE 5 PHOTOGRAPH OF DYNAMIC PULL-OFF TESTING
306 TESTING APPLICATION STANDARD (TAS) 121-95 STANDARD REQUIREMENTS FOR TESTING AND APPROVAL OF ROOFING ADHESIVES, MASTICS AND COATINGS
308 TESTING APPLICATION STANDARD (TAS) 123-95 STANDARD REQUIREMENTS FOR MORTAR USED IN MORTAR SET TILE SYSTEMS
310 TESTING APPLICATION STANDARD (TAS) 123-95 APPENDIX A STANDARD REQUIREMENTS OF TILE ADHESIVE USED TO REPAIR OR SUPPLEMENT TILE ATTACHMENT
311 TABLE 1 TILE ADHESIVE COMPOSITION REQUIREMENTS
TABLE 2 TILE ADHESIVE ADHESION REQUIREMENTS
TABLE 3 TILE ADHESIVE TENSILE/ELONGATION REQUIREMENTS
312 TABLE 4 SHORE ‘A’ HARDNESS REQUIREMENTS
314 TESTING APPLICATION STANDARD (TAS) 124-20 TEST PROCEDURE FOR FIELD UPLIFT RESISTANCE OF EXISTING MEMBRANE ROOF SYSTEMS AND IN SITU TESTING FOR REROOF AND NEW CONSTRUCTION APPLICATIONS
316 FIGURE 1 SCREW AND EYE-BOLT LOCATIONS
FIGURE 2 ALTERNATE LOAD TRANSFER DEVICE
317 TABLE 1 NUMBER OF BELL CHAMBER OR BONDED PULL TESTS TO BE CONDUCTED PER ROOF AREA
319 TABLE 2 APPLIED LOAD INCREMENTS
320 TABLE 3 MAXIMUM RECOMMENDED DEFLECTION FOR ADHERED COVERS ON STEEL DECK ROOFS BEFORE THE SAMPLE IS CONSIDERED SUSPECT
322 TESTING APPLICATION STANDARD (TAS) 124-20 BELL CHAMBER TEST RESULTS
326 ROOF SYSTEM INFORMATION – DETAIL #1
327 BUILDING INFORMATION – DETAIL #2
328 ROOF SYSTEM INFORMATION – DETAIL #3
330 TESTING APPLICATION STANDARD (TAS) 124-20 BONDED PULL TEST RESULTS
334 ROOF SYSTEM INFORMATION – DETAIL #1
335 BUILDING INFORMATION – DETAIL #2
336 ROOF SYSTEM INFORMATION – DETAIL #3
338 TESTING APPLICATION STANDARD (TAS) 125-03 STANDARD REQUIREMENTS FOR METAL ROOFING SYSTEMS
342 FIGURE 8-1 ASSEMBLED UPLIFT TEST APPARATUS FOR UL 580
345 TABLE T125-1 TEST PRESSURES
356 FIGURE 9-1 SCHEMATIC OF TEST APPARATUS FOR ASTM E1592 UPLIFT TESTING
357 FIGURE 9-2 EXAMPLES OF STRUCTURAL ELEMENTS AND PANEL WIDTH FOR DIFFERENT PROFILES
FIGURE 9-3 IMPROPER SEAL WHERE FILM SPANS CREVICE AT BASE OF RIB
FIGURE 9-4 PLEATS MAKE CONTACT WITH METAL PANEL ON BOTH SIDES OF CLIPS
FIGURE 9-5 PROPER SEAL AT RIB WITH MULTIPLE LONGITUDINAL AIR BAGS
FIGURE 9-6 IMPROPER USE OF MULTIPLE AIR BAGS BETWEEN SUPPORT
358 TESTING APPLICATION STANDARD (TAS) 126-95 STANDARD PROCEDURES FOR ROOF MOISTURE SURVEYS
366 TESTING APPLICATION STANDARD (TAS) 131-20 STANDARD REQUIREMENTS FOR UNREINFORCED THERMOPLASTIC OLEFIN ELASTOMER BASED SHEET USED IN SINGLE-PLY ROOF SYSTEMS
368 TABLE 1 PHYSICAL REQUIREMENTS FOR UNREINFORCED TPO ELASTOMER SHEETS
370 TESTING APPLICATION STANDARD (TAS) 132-95 STANDARD REQUIREMENTS FOR TESTING AND APPROVAL OF SEALANTS USED IN ROOFING
371 PHYSICAL PROPERTY REQUIREMENTS
PERFORMANCE REQUIREMENTS
372 TESTING APPLICATION STANDARD (TAS) 135-95 STANDARD REQUIREMENTS FOR FIBERGLASS REINFORCED TILE, SHINGLES OR PANELS AND FIBER CEMENT SHINGLES, SHAKES OR PANELS
373 TABLE 1PHYSICAL PROPERTY REQUIREMENTS FOR FIBERGLASS REINFORCED, COMPOSITE TILE, SHINGLES OR PANELS
377 TABLE 2 PHYSICAL PROPERTY REQUIREMENTS FOR FIBER CEMENT SHINGLES, SHAKES OR PANELS
378 TESTING APPLICATION STANDARD (TAS) 138-95 STANDARD REQUIREMENTS FOR ALUMINUM PIGMENTED EMULSIFIED ASPHALT USED AS A PROTECTIVE COATING FOR ROOFING
382 TESTING APPLICATION STANDARD (TAS) 139-95 STANDARD REQUIREMENTS FOR WHITE ROOF PATCH SPECIFICATION
386 TESTING APPLICATION STANDARD (TAS) 140-95 STANDARD REQUIREMENTS FOR NONFIBERED ROOF AND FOUNDATION COATINGS
388 TESTING APPLICATION STANDARD (TAS) 141-95 STANDARD REQUIREMENTS FOR COAL TAR (CUTBACK) ROOF COATING, BRUSHING CONSISTENCY
392 TESTING APPLICATION STANDARD (TAS) 142-95 STANDARD REQUIREMENTS FOR COAL TAR ROOF CEMENT, ASBESTOS FREE
394 TESTING APPLICATION STANDARD (TAS) 143-95 STANDARD REQUIREMENTS FOR WHITE ELASTOMERIC ROOF COATINGS USED FOR COATING BUILT UP ROOFS AND METAL ROOFING SYSTEMS
400 TESTING APPLICATION STANDARD (TAS) 201-94 IMPACT TEST PROCEDURES
401 FIGURE 1 THREE (3) BASIC STORM PANEL ATTACHMENTS FOR TESTING
406 TESTING APPLICATION STANDARD (TAS) 202-94 CRITERIA FOR TESTING IMPACT & NONIMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE
407 FIGURE 1 THREE (3) BASIC STORM PANEL ATTACHMENTS FOR TESTING
412 TESTING APPLICATION STANDARD (TAS) 203-94 CRITERIA FOR TESTING PRODUCTS SUBJECT TO CYCLIC WIND PRESSURE LOADING
413 FIGURE 1 THREE (3) BASIC STORM PANEL ATTACHMENTS FOR TESTING
416 TESTING APPLICATION STANDARD (TAS) 301-94 TESTING LABORATORY
418 NATIONAL STORM SHELTER ASSOCIATION
419 ICC DIGITAL CODES PREMIUM
420 ICC EVALUATION SERVICE®
421 GET THE NEW 2023 FLORIDA CODES: COMPLETE COLLECTION
FL FloridaTestProtocols 2023 1stptg
$22.75