Virtual Power Plants – Use Cases

Published By Publication Date Number of Pages
BSI 2023 76
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
4 CONTENTS
8 INTRODUCTION
9 1 Scope
2 Normative references
3 Terms and definitions
11 4 System requirements
4.1 General considerations
4.2 Basic requirements
4.2.1 General
4.2.2 Privacy
4.2.3 Cyber security
4.2.4 Adaptability, flexibility and interoperability
12 4.2.5 Communication and information
4.2.6 Reliability
4.3 Operational risks of VPPs
4.3.1 General
4.3.2 Major
4.3.3 Moderate
4.3.4 Minor
13 5 Business roles
5.1 VPP participant
5.2 DER owner
5.3 System operator
5.4 Electricity market operator
6 Actors
7 Application scenarios and functions
7.1 Overview
14 7.2 Functions
8 VPP use case
8.1 Overview
8.2 Use case template
8.3 Use case matrix
15 8.4 Use case development
8.4.1 General
Figure 1 – Use case matrix development methodology
16 8.4.2 Description of the use case
Tables
Table 1 – Use case list
18 Table 2 – Scope and objectives of use case
21 Table 3 – Narrative of use case
24 Table 4 – Key performance indicators
26 Table 5 – Use case conditions
28 8.4.3 Diagrams of use case
Table 6 – Diagrams of use case
44 8.4.4 Technical details
45 Table 7 – Diagram(s) of actors
46 Table 8 – Grouping of China
47 Table 9 – Grouping of Japan
48 Table 10 – Grouping of Australia
49 Table 11 – Grouping of Germany
Table 12 – References
51 8.4.5 Step by step analysis of use case
Table 13 – Scenario conditions
56 Table 14 – Steps of scenarios
70 8.4.6 Information exchanged
Table 15 – Information exchanged
72 9 Summary of standards gap analysis
10 Conclusion and recommendations
73 Table 16 – Conclusion of use cases
74 Bibliography