BSI PD CEN/TS 12007-6:2021
$142.49
Gas infrastructure. Pipelines for maximum operating pressure up to and including 16 bar – Specific functional recommendations for unplasticized polyamide (PA-U)
Published By | Publication Date | Number of Pages |
BSI | 2021 | 30 |
This document describes the specific functional requirements for polyamide (PA) pipelines in addition to the general functional requirements of EN 12007?1 for:
-
a maximum operating pressure (MOP) up to and including 16 bar;
-
an operating temperature between ?20 °C and +40 °C.
This document covers one type of pipe:
-
PA pipes single layer solid wall.
This document specifies common basic principles for gas infrastructure.
Users of this document are aware that more detailed national standards and/or code of practice can exist in the CEN member countries.
This document is intended to be applied in association with these national standards and/or codes of practice setting out the above-mentioned basic principles.
In the event of conflicts in terms of more restrictive requirements in national legislation/regulation with the requirements of this document, the national legislation/regulation takes precedence as illustrated in CEN/TR 13737 (all parts) .
CEN/TR 13737 (all parts)give:
-
clarification of all legislations/regulations applicable in a member state;
-
if appropriate, more restrictive national requirements;
-
a national contact point for the latest information.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
6 | 1 Scope 2 Normative references |
7 | 3 Terms and definitions |
8 | 4 Symbols and abbreviations |
9 | 5 Design 5.1 General 5.2 Materials and components 5.3 Maximum operating pressure 5.3.1 General 5.3.2 Verification of the overall service (design) coefficient 5.3.3 Verification of the RCP criterion |
11 | 5.4 Assembly techniques 5.5 Material properties for flow stopping by squeeze-off 6 Construction 6.1 Storage, handling and transportation |
12 | 6.2 Jointing 6.2.1 General 6.2.2 Fusion jointing |
13 | 6.2.3 Mechanical joints 6.2.3.1 General 6.2.3.2 Flanged joints 6.2.3.3 Threaded joints 6.3 Laying |
15 | 6.4 Connection to existing systems 6.4.1 Static electricity 6.4.2 Squeeze-off 7 Quality control 7.1 Inspection prior to installation 7.2 Inspection during laying 7.2.1 Laying 7.2.2 Joint integrity |
16 | 8 Pressure testing 9 Influence of media on PA-U |
17 | Annex A (informative)Storage, handling and transportation A.1 General A.2 Storage A.2.1 Storage conditions A.2.2 Bundles |
18 | A.2.3 Stacking loose straight pipes A.2.4 Drums and coils A.2.5 Storing |
19 | A.2.6 First in − first out A.3 Handling A.3.1 General A.3.2 Handling in cold weather A.3.3 Straight pipes A.3.4 Coils A.3.5 Drums |
20 | A.3.6 Uncoiling and unrolling A.4 Transportation A.4.1 Straight pipes A.4.2 Coiled pipe A.4.3 Drums |
21 | Annex B (informative)Fusion joint integrity B.1 General B.2 Visual inspection criteria B.2.1 General B.2.2 Butt fusion guidelines for the visual examination of butt fusion joints B.2.2.1 Bead symmetry B.2.2.2 Bead Appearance |
22 | B.2.2.3 Alignment |
23 | B.2.2.4 Bead width B.2.3 Electrofusion B.2.3.1 Electrofusion socket |
24 | B.2.3.2 Saddle or tapping tee |
27 | B.2.4 Ancillary tooling |