BSI 22/30391777 DC:2022 Edition
$13.70
BS ISO 17607-4. Steel structures. Execution of structural steelwork – Part 4. Erection
Published By | Publication Date | Number of Pages |
BSI | 2022 | 94 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | Foreword |
8 | Introduction |
9 | 1 Scope 2 Normative references |
10 | 3 Terms and definitions 4 Execution specification and quality requirements 4.1 General 4.2 Execution specification |
11 | 5 Constituent products 5.1 General 5.2 Anchorages, foundation bolts and other anchorages 5.3 Grouting materials 5.3.1 General 5.3.2 Cement based grout 5.3.3 Special grout 5.3.4 Fine concrete |
12 | 5.4 Expansion joints for bridges 6 Erection 6.1 General 6.2 Site conditions |
13 | 6.3 Erection method 6.3.1 Design basis for the erection method |
14 | 6.3.2 Constructor’s erection method statement |
15 | 6.4 Survey 6.4.1 Reference system 6.4.2 Position points 6.5 Supports 6.5.1 General |
16 | 6.5.2 Inspection setting out and suitability of supports 6.5.3 Maintaining suitability of supports 6.5.4 Temporary supports |
17 | 6.5.5 Grouting 6.5.6 Anchoring 6.6 Erection and work at site 6.6.1 Erection drawings 6.6.2 Marking 6.6.3 Handling and storage on site |
18 | 6.6.4 Trial assembly 6.6.5 Erection methods 6.6.5.1 General 6.6.5.2 Temporary works |
19 | 6.6.5.3 Fit-up and alignment |
20 | 6.6.5.4 Bolted splices with full contact bearing 7 Geometrical tolerances |
21 | 8 Inspection, testing and correction 8.1 General 8.2 Erection 8.2.1 Inspection of trial assembly 8.2.2 Inspection of the erected structure 8.2.3 Survey of geometrical position of connection nodes 8.2.3.1 Survey methods and accuracy |
22 | 8.2.3.2 System of measurement 8.2.3.3 Reference points and levels 8.2.3.4 Location and frequency |
23 | 8.2.3.5 Acceptance criteria 8.2.3.6 Definition of nonconformity 8.2.3.7 Action on nonconformity 8.2.4 Other acceptance tests 9 Documents required to claim conformity to these requirements 9.1 General |
24 | 9.2 Declaration of conformity |
25 | Annex A (normative) Additional information, list of options and requirements related to the execution levels A.1 List of required additional information A.2 List of options |
26 | A.3 Requirements related to the execution levels |
28 | Annex B (normative) Grouting |
29 | Annex C (informative) Geometrical tolerances – Buildings C.1 General C.2 Tolerances for Europe |
37 | C.3 Tolerances for Australia / New Zealand |
43 | C.4 Tolerances for Canada |
47 | C.5 Tolerances for China |
52 | C.6 Tolerances for Japan |
57 | C.7 Tolerances for Russia C.8 Tolerances for United Kingdom |
63 | C.9 Tolerances for United States |
68 | Annex D (informative) Geometrical tolerances – Bridges D.1 Tolerances per country – Bridges D.2 Tolerances for Europe |
69 | D.3 Tolerances for Australia / New Zealand D.4 Tolerances for Canada D.5 Tolerances for China D.6 Tolerances for Japan |
70 | D.7 Tolerances for Russia D.8 Tolerances for United Kingdom D.9 Tolerances for United States |
71 | Annex E (informative) Geometrical tolerances – Crane runways E.1 Tolerances per country – Crane runways E.2 Tolerances for Europe |
73 | E.3 Tolerances for Australia and New Zealand |
75 | E.4 Tolerances for Canada E.5 Tolerances for China |
77 | E.6 Tolerances for Japan |
78 | E.7 Tolerances for Russia |
79 | E.8 Tolerances for United Kingdom |
81 | E.9 Tolerances for United States |
83 | Annex F (informative) Geometrical tolerances – Concrete foundations and supports F.1 Tolerances per country F.2 Tolerances for Europe |
85 | F.3 Australia and New Zealand |
87 | F.4 Tolerances for Canada |
88 | F.5 Tolerances for China |
89 | F.6 Japan F.7 Tolerances for Russia |
91 | F.8 Tolerances for United Kingdom |
92 | F.9 United States |
93 | Bibliography |