BS IEC/IEEE 61886-1:2021
$215.11
Subsea equipment – Power connectors, penetrators and jumper assemblies with rated voltage from 3 kV (Umax = 3,6 kV) to 30 kV (Umax = 36 kV)
Published By | Publication Date | Number of Pages |
BSI | 2021 | 100 |
This document is applicable to single and three-phase wet-mateable and dry-mateable AC connectors, penetrators and jumper assemblies with rated voltages from 3 kV (Umax = 3,6 kV) to 30 kV (Umax = 36 kV). This document relates to the requirements and tests for products in the “as manufactured and supplied” condition. This document is not applicable to requirements and tests for products that have been subsequently installed, deployed or retrieved.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
4 | CONTENTS |
12 | FOREWORD |
14 | INTRODUCTION |
15 | 1 Scope 2 Normative references |
16 | 3 Terms, definitions and abbreviated terms |
17 | 3.1 Terms and definitions |
21 | 3.2 Abbreviated terms |
22 | 4 Documentation and marking 4.1 Design documentation 4.2 Type test documentation 4.3 Routine test documentation Tables Table 1 โ Design documentation Table 2 โ Routine test documentation |
23 | 4.4 As built documentation 4.5 Design analysis 4.6 Data sheet Table 3 โ As built documentation |
24 | 4.7 Equipment marking 4.7.1 Connectors and penetrators 4.7.2 Jumper assemblies 5 Design 5.1 General design requirements |
25 | 5.2 Temperature class 5.3 Electrical design requirements 5.3.1 Ratings Table 4 โ Temperature classes Table 5 โ Voltage ratings |
26 | 5.3.2 Earthing 5.3.3 Dummy connectors Table 6 โ Current ratings |
27 | 5.4 Mechanical design requirements 5.4.1 Pressure classes 5.4.2 Rapid gas decompression 5.4.3 External forces 5.5 Material requirements 5.5.1 General material requirements Table 7 โ Pressure classes |
28 | 5.5.2 Material certification requirements 5.6 Connector specific requirements 5.6.1 General requirements 5.6.2 Wet mateable connectors |
29 | 5.6.3 Dry mateable connectors 5.7 Penetrator specific requirements 5.7.1 Penetrators for pressure compensated equipment 5.7.2 Penetrators for pressure retaining equipment |
30 | 5.8 Seals 5.8.1 General seal requirements 5.8.2 Water seals 5.8.3 Additional requirements for pressure integrity seals 5.9 Electric field control |
31 | 5.10 Jumper assemblies 5.11 Storage and transportation 6 Tests 6.1 Structure of test clauses 6.2 General test requirements |
32 | 6.3 Artificial sea water 6.4 Test media |
33 | Table 8 โ Test media |
35 | 7 Routine tests โ Connectors and penetrators Table 9 โ Electrical routine tests Table 10 โ Routine test sequence โ Connectors and penetrators |
36 | 8 Routine tests โ Dummy and test connectors 9 Routine tests โ Jumper assemblies Table 11 โ Routine test sequence โ Complete jumper assemblies |
37 | 10 Sample tests โ Hoses 11 Type and special tests โ Connectors and penetrators 11.1 Order of tests and type test requirements |
38 | Table 12 โ Type test sequence |
39 | Table 13 โ Intermediate electrical tests |
40 | 11.2 Type tests โ Dummy and test connectors 11.3 Type tests โ New interface cable Table 14 โ Type test sequence โ New interface cable |
41 | 11.4 Prototype manufacturing acceptance test 11.4.1 Objective 11.4.2 Sequence 11.4.3 Acceptance criteria Table 15 โ Prototype manufacturing acceptance test sequence |
42 | 11.5 Electrical and thermal tests 11.5.1 Objective 11.5.2 Sequence Table 16 โ Electrical and thermal test sequence โ Connectors Table 17 โ Electrical and thermal test sequence โ Pressure retaining penetrators |
43 | 11.5.3 Acceptance criteria Table 18 โ Electrical and thermal test sequence โPenetrators for pressure balanced equipment |
44 | 11.6 Electrical short circuit test 11.6.1 Objective 11.6.2 Sequence 11.6.3 Acceptance criteria 11.7 Hyperbaric test 11.7.1 Objective 11.7.2 Sequence Table 19 โ Electrical short circuit test sequence |
45 | Table 20 โ Hyperbaric test sequence โ Wet mateable connectors Table 21 โ Hyperbaric test sequence โ Dry mateable connectors |
46 | 11.7.3 Acceptance criteria 11.8 Pressure cycling test โ Penetrators 11.8.1 Objective 11.8.2 Sequence Table 22 โ Pressure cycling test โ Penetrators for pressure compensated equipment |
47 | 11.8.3 Acceptance criteria 11.9 Combined pressure and temperature cycling test โ Penetrators 11.9.1 Objective 11.9.2 Sequence Table 23 โ Pressure cycling test โ Pressure retaining penetrators |
48 | 11.9.3 Acceptance criteria 11.10 Rapid gas decompression test 11.10.1 Objective 11.10.2 Sequence Table 24 โ Combined pressure and temperature cycling test โ Penetrators Table 25 โ RGD test sequence |
49 | 11.10.3 Acceptance criteria 11.11 Mechanical and environmental stress test 11.11.1 Objective 11.11.2 Sequence Table 26 โ Mechanical and environmental stress test sequence |
50 | 11.11.3 Acceptance criteria 11.12 Endurance test โ Connectors 11.12.1 Objective 11.12.2 Sequence Table 27 โ Endurance test โ Connectors |
51 | 11.12.3 Acceptance criteria 11.13 Endurance test โ Penetrators 11.13.1 Objective 11.13.2 Sequence Table 28 โ Endurance test โ Pressure retaining penetrators |
52 | 11.13.3 Acceptance criteria Table 29 โ Endurance test โ Penetrators for pressure compensated equipment |
53 | 11.14 Inner water seal hyperbaric test โ Connectors 11.14.1 Objective 11.14.2 Sequence 11.14.3 Acceptance criteria 11.15 Inner water seal pressure cycling test โ Penetrators 11.15.1 Objective 11.15.2 Sequence 11.15.3 Acceptance criteria 11.16 Outer water seal hyperbaric test โ Connectors 11.16.1 Objective 11.16.2 Sequence 11.16.3 Acceptance criteria |
54 | 11.17 Outer water seal pressure cycling test โ Penetrators 11.17.1 Objective 11.17.2 Sequence 11.17.3 Acceptance criteria 11.18 Secondary pressure integrity seal test โ Penetrators 11.18.1 Objective 11.18.2 Sequence 11.18.3 Acceptance criteria 11.19 Primary pressure integrity seal test โ Penetrators 11.19.1 Objective 11.19.2 Sequence 11.19.3 Acceptance criteria |
55 | 11.20 Secondary pressure integrity seal combined pressure and temperature cycling test โ Penetrators 11.20.1 Objective 11.20.2 Sequence 11.20.3 Acceptance criteria 11.21 Primary pressure integrity seal combined pressure and temperature cycling test โ Penetrators 11.21.1 Objective 11.21.2 Sequence 11.21.3 Acceptance criteria 11.22 Extended hyperbaric wet mate test 11.22.1 Objective 11.22.2 Sequence |
56 | Table 30 โ Extended hyperbaric wet mate test sequence |
57 | 11.22.3 Acceptance criteria 12 Type tests โ Hose and hose terminations 12.1 General Table 31 โ Hose type test sequence |
58 | 12.2 Absorption/compensation test 12.2.1 Objective 12.2.2 Method 12.2.3 Acceptance criteria |
59 | 12.3 Ozone resistance 12.3.1 Objective 12.3.2 Method 12.3.3 Acceptance criteria 12.4 Ultraviolet resistance 12.4.1 Objective 12.4.2 Method 12.4.3 Acceptance criteria |
60 | 12.5 Thermal shock test 12.5.1 Objective 12.5.2 Method 12.5.3 Acceptance criteria 12.6 Destructive testing 12.6.1 Tensile failure |
61 | 12.6.2 Burst pressure 12.6.3 Crush resistance |
62 | 12.6.4 Outer sheath abrasion resistance 12.6.5 Hose kink test |
63 | 13 Type tests โ Jumper assemblies 13.1 General 13.2 Electrical and thermal type test โ Jumper assemblies 13.2.1 Objective 13.2.2 Sequence Table 32 โ Jumper assembly type test sequence |
64 | 13.2.3 Acceptance criteria 13.3 Oscillating jumper test 13.3.1 Objective 13.3.2 Sequence Table 33 โ Electrical and thermal type test โ Jumper assemblies Table 34 โ Oscillating jumper test |
65 | 13.3.3 Acceptance criteria 13.4 Jumper pull test 13.4.1 Objective 13.4.2 Sequence Table 35 โ Jumper pull test |
66 | 13.4.3 Acceptance criteria 13.5 Drop test 13.5.1 Objective 13.5.2 Sequence 13.5.3 Acceptance criteria 13.6 Jumper handling simulation test 13.6.1 Objective 13.6.2 Sequence Table 36 โ Drop test |
67 | Table 37 โ Jumper handling simulation test |
68 | 13.6.3 Acceptance criteria 13.7 Jumper simulated deployment test 13.7.1 Objective 13.7.2 Sequence Figures Figure 1 โ Jumper handling simulation test |
69 | 13.7.3 Acceptance criteria 14 Test procedures 14.1 Helium leak test 14.1.1 Objective Table 38 โ Jumper simulated deployment testing |
70 | 14.1.2 Method 14.1.3 Acceptance criteria 14.2 Contact resistance test 14.2.1 Objective 14.2.2 Method 14.2.3 Acceptance criteria |
71 | 14.3 Shell continuity test 14.3.1 Objective 14.3.2 Method 14.3.3 Acceptance criteria 14.4 Screen continuity test 14.4.1 Objective 14.4.2 Method 14.4.3 Acceptance criteria 14.5 Partial discharge test 14.5.1 Objective 14.5.2 Method |
72 | 14.5.3 Acceptance criteria 14.6 High voltage AC test 14.6.1 Objective 14.6.2 Method 14.6.3 Acceptance criteria 14.7 Impulse withstand voltage test 14.7.1 Objective 14.7.2 Method 14.7.3 Acceptance criteria Table 39 โ Impulse withstand voltage test levels |
73 | 14.8 Insulation resistance test 14.8.1 Objective 14.8.2 Method 14.8.3 Acceptance criteria 14.9 Thermal shock test 14.9.1 Objective 14.9.2 Method Table 40 โ Insulation resistance test โ Voltage test levels |
74 | 14.9.3 Acceptance criteria 14.10 Thermal short circuit test 14.10.1 Objective 14.10.2 Method 14.10.3 Acceptance criteria 14.11 Dynamic short circuit test 14.11.1 Objective 14.11.2 Method 14.11.3 Acceptance criteria |
75 | 14.12 Temperature rise test 14.12.1 Objective 14.12.2 Method 14.12.3 Acceptance criteria |
76 | 14.13 Extended temperature rise test 14.13.1 Objective 14.13.2 Method Figure 2 โ Typical extended temperature test results, method 1 |
77 | 14.13.3 Acceptance criteria 14.14 Thermal cycling 14.14.1 Objective 14.14.2 Method Figure 3 โ Typical extended temperature test results, method 2 |
78 | 14.14.3 Acceptance criteria 14.15 Bending moment and free fall tests 14.15.1 Objective 14.15.2 Method 14.15.3 Acceptance criteria Figure 4 โ Bending moment test |
79 | 14.16 Static pressure test โ Penetrators 14.16.1 Objective 14.16.2 Method 14.16.3 Acceptance criteria Table 41 โ Static pressure test โ Penetrators |
80 | 14.17 Extended static pressure test โ Penetrators 14.17.1 Objective 14.17.2 Method 14.17.3 Acceptance criteria 14.18 Combined pressure and temperature cycling test โ Pressure retaining penetrators 14.18.1 Objective 14.18.2 Method 14.18.3 Acceptance criteria 14.19 Shock and vibration test 14.19.1 Objective 14.19.2 Method |
81 | 14.19.3 Acceptance criteria 14.20 Cleaning and spillage test 14.20.1 Objective 14.20.2 Method 14.20.3 Acceptance criteria 14.21 Conductor pull test 14.21.1 Objective |
82 | 14.21.2 Method 14.21.3 Acceptance criteria 14.22 Cable pull test 14.22.1 Objective 14.22.2 Method 14.22.3 Acceptance criteria 14.23 Cable termination bending test 14.23.1 Objective 14.23.2 Method 14.23.3 Acceptance criteria |
83 | 14.24 Mate/de-mate operation test 14.24.1 Objective 14.24.2 Method 14.24.3 Acceptance criteria 14.25 Dismantling and examination 14.25.1 Objective 14.25.2 Method 14.25.3 Acceptance criteria |
84 | 14.26 High voltage breakdown test 14.26.1 Objective 14.26.2 Method 14.26.3 Acceptance criteria 14.27 Rapid gas decompression (RGD) test โ General 14.27.1 Objective 14.27.2 Method 14.27.3 Acceptance criteria |
85 | 14.28 Material testing 14.28.1 Objective 14.28.2 General test requirements 14.28.3 Polymeric materials test requirements |
86 | 14.28.4 Acceptance criteria |
87 | Annex A (informative)Connector assembly data sheet Table A.1 โ Typical product data sheet |
90 | Annex B (informative)Penetrator figures Figure B.1 โ Penetrator flange view |
91 | Figure B.2 โ Pressure retaining penetrator โ Definitions |
92 | Figure B.3 โ Test set-up, pressure retaining penetrator โ Direction 1 |
93 | Figure B.4 โ Test set-up, pressure retaining penetrator โ Direction 2 |
94 | Figure B.5 โ Penetrator for pressure balanced conditions โ Definitions |
95 | Figure B.6 โ Test set-up, penetrator for pressure balanced conditions โTest of absolute pressure |
96 | Figure B.7 โ Test set-up, penetrator for pressure balanced conditions โ Direction 1 |
97 | Figure B.8 โ Test set-up, penetrator for pressure balanced conditions โ Direction 2 |
98 | Bibliography |