BS EN IEC 60974-2:2019 – TC:2020 Edition
$186.33
Tracked Changes. Arc welding equipment – Liquid cooling systems
Published By | Publication Date | Number of Pages |
BSI | 2020 | 50 |
IEC 60974-2:2019 specifies safety and construction requirements for industrial and professional liquid cooling systems used in arc welding and allied processes to cool torches. This document is applicable to liquid cooling systems which are stand-alone (separate from the welding equipment) or built-in (housed in a single enclosure with other welding equipment). This fourth edition cancels and replaces the third edition published in 2013 and constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) changes induced by the publication of IEC 60974-1:2017; b) reference in 11.1 changed.
PDF Catalog
PDF Pages | PDF Title |
---|---|
28 | undefined |
31 | Annex ZA(normative)Normative references to international publicationswith their corresponding European publications |
32 | Annex ZZ (informative)Relationship between this European standard and the safety objectives of Directive 2014/35/EU [2014 OJ L96] aimed to be covered |
33 | English CONTENTS |
35 | FOREWORD |
37 | 1 Scope 2 Normative references 3 Terms and definitions |
38 | 4 Environmental conditions 5 Tests 5.1 Test conditions 5.2 Measuring instruments 5.3 Conformity of components 5.4 Type tests 5.5 Routine tests |
39 | 6 Protection against electric shock 6.1 Insulation 6.1.1 General 6.1.2 Clearances 6.1.3 Creepage distances 6.1.4 Insulation resistance 6.1.5 Dielectric strength 6.2 Protection against electric shock in normal service (direct contact) 6.3 Protection against electric shock in case of a fault condition (indirect contact) 6.3.1 Protective provisions 6.3.2 Isolation between windings of the supply circuit and the welding circuit 6.3.3 Internal conductors and connections 6.3.4 Touch current in fault condition 6.4 Connection to the supply network 6.4.1 Supply voltage |
40 | 6.4.2 Multi-supply voltage 6.4.3 Means of connection to the supply circuit 6.4.4 Marking of terminals 6.4.5 Protective circuit 6.4.6 Cable anchorage 6.4.7 Inlet openings 6.4.8 Supply circuit on/off switching device 6.4.9 Supply cables 6.4.10 Supply coupling device (attachment plug) 6.5 Leakage current between welding circuit and protective earth |
41 | 7 Mechanical provisions 7.1 General 7.2 Cooling liquid overflow 7.3 Hose coupling devices and hose connections 8 Cooling system 8.1 Rated maximum pressure Figures Figure 1 – Leakage current measurement configuration |
42 | 8.2 Thermal requirements 8.2.1 Heating test 8.2.2 Tolerances of test parameters 8.2.3 Duration of test 8.3 Pressure and temperature 9 Abnormal operation 9.1 General requirements |
43 | 9.2 Stalled test 10 Cooling power |
44 | 11 Rating plate 11.1 General 11.2 Description Figure 2 – Measuring circuit for determination of the cooling power Table 1 – Example of cooling liquid data at 60 (C |
45 | 11.3 Contents Figure 3 – Principle of the rating plate of stand-alone cooling systems |
46 | 11.4 Tolerances 12 Instructions and markings 12.1 Instructions |
47 | 12.2 Markings 12.2.1 General 12.2.2 Inlet and outlet 12.2.3 Pressure warning |
48 | Annex A (informative)Example diagram of built-in and stand-alone liquid cooling systems Figure A.1 – Example diagram of built-in liquid cooling systems Figure A.2 – Example diagram of stand-alone liquid cooling systems |
49 | Annex B (informative)Example for a rating plate of stand-alone cooling system Figure B.1 – Single-phase stand-alone cooling unit |