Shopping Cart

No products in the cart.

BS EN 60255-127:2014

$142.49

Measuring relays and protection equipment – Functional requirements for over/under voltage protection

Published By Publication Date Number of Pages
BSI 2014 28
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 60255 specifies minimum requirements for over/under voltage relays. The standard includes specification of the protection function, measurement characteristics and time delay characteristics.

This standard defines the influencing factors that affect the accuracy under steady state conditions and performance characteristics during dynamic conditions. The test methodologies for verifying performance characteristics and accuracy are also included in this standard.

The over/under voltage functions covered by this standard are as follows:

The general requirements for measuring relays and protection equipment are specified in IEC 60255-1.

PDF Catalog

PDF Pages PDF Title
5 Annex ZA (normative) Normative references to international publications with their corresponding European publications
6 English
CONTENTS
8 1 Scope
2 Normative references
3 Terms and definitions
10 4 Specification of the function
4.1 General
4.2 Input energising quantities/Energising quantities
Figures
Figure 1 – Simplified protection function block diagram
11 4.3 Binary input signals
4.4 Functional logic
Figure 2 – Overvoltage independent time characteristic
12 Figure 3 – Undervoltage independent time characteristic
13 Figure 4 – Dependent time characteristic for overvoltage protection
14 Figure 5 – Dependent time characteristic for undervoltage protection
16 4.5 Binary output signals
Figure 6 – Definite time reset characteristic
Figure 7 – Definite time reset characteristic (alternative solution with instantaneous reset after relay operation)
17 5 Performance specification
5.1 Accuracy related to the characteristic quantity
5.2 Accuracy related to the operate time
18 5.3 Accuracy related to the reset time
5.4 Transient performance
5.5 Voltage transformer requirements
6 Functional test methodology
6.1 General
19 6.2 Determination of steady state errors related to the characteristic quantity
20 6.3 Determination of steady state errors related to the start and operate time
21 6.4 Determination of steady state errors related to the reset time
Tables
Table 1 – Test points for overvoltage elements
Table 2 – Test points for undervoltage elements
22 6.5 Determination of transient performance
Table 3 – Test points for overvoltage elements
Table 4 – Test points for undervoltage elements
23 7 Documentation requirements
7.1 Type test report
Figure 8 – Test waveform
Table 5 – Recommended values for the test
24 7.2 Other user documentation
25 Annex A (informative) Reset time determination for relays with trip output only
Figure A.1 – Dependent reset time determination
26 Bibliography
BS EN 60255-127:2014
$142.49