BS EN 13282-3:2024 – TC
$134.27
Tracked Changes. Hydraulic road binders – Assessment and verification of constancy of performance
Published By | Publication Date | Number of Pages |
BSI | 2024 | 39 |
This document specifies the scheme for the assessment and verification of constancy of performance (AVCP) of hydraulic road binders, including certification of conformity of the factory production control. This document provides technical rules for factory production control, testing of samples taken at the manufacturing plant (autocontrol testing), assessment of the performance of the hydraulic road binder, initial inspection of the manufacturing plant and of factory production control and continuing surveillance, assessment and evaluation of factory production control. The guidelines given in the Technical Report CEN/TR 14245 [5] contain information for the application of this document. NOTE In the context of this document the term, “construction product” refers to hydraulic road binder.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30491631 |
23 | A-30464841 |
24 | undefined |
29 | 1 Scope 2 Normative references 3 Terms and definitions |
31 | 4 Factory production control 4.1 General requirements 4.1.1 Concept 4.1.2 Works’ quality documentation |
32 | 4.1.3 Quality management system 4.1.3.1 Quality policy statement 4.1.3.2 Quality manager 4.1.3.3 Internal audits and management review 4.1.3.4 Training 4.1.4 System of documentation 4.1.4.1 Document control 4.1.4.2 Quality records 4.2 Internal quality control 4.2.1 Process control 4.2.1.1 General |
33 | 4.2.1.2 Constituents and composition of hydraulic road binder 4.2.1.3 Control of off-specification production or non-conformity 4.2.2 Measuring and testing 4.2.2.1 Inspection, measuring and test equipment 4.2.2.2 Inspection and test status 4.2.3 Handling, storage, packaging and delivery 5 Assessment of the performance of the hydraulic road binder |
34 | 6 Autocontrol testing of samples 6.1 Sampling and testing 6.2 Corrective action 6.3 Measuring and test equipment for autocontrol testing 6.4 Quality records 7 Tasks for the purpose of certification 7.1 Initial inspection of the manufacturing plant and the factory production control 7.1.1 Inspection of a new factory |
35 | 7.1.2 Inspection of an existing factory 7.1.3 Criteria for the assessment of the production equipment 7.1.4 Criteria for the assessment of laboratories |
36 | 7.2 Continuing surveillance, assessment and evaluation of factory production control 7.2.1 Inspection of the factory production control 7.3 Reports 7.4 Actions to be taken in the event of non-conformity 8 Procedure for certification of conformity of the factory production control |