503.7-07 Specification for Crack Repair by Epoxy Injection
Published By | Publication Date | Number of Pages |
ACI | 2007 | 11 |
This Specification gives requirements for repairing cracks in concrete by injection of two-component epoxy-resin adhesive. Keywords: adhesive; concrete; crack; epoxy; repair injection; sealer.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | NOTES TO SPECIFIER NOTES TO SPECIFIER PREFACE PREFACE |
4 | CONTENTS CONTENTS SECTION 1— GENERAL SECTION 1— GENERAL 1.1— Scope 1.1— Scope 1.2—Definitions 1.2—Definitions 1.3—Reference standards 1.3—Reference standards 1.4—Submittals 1.4—Submittals 1.4.1 Injection adhesives 1.4.1 Injection adhesives 1.4.1.1 Qualification testing 1.4.1.1 Qualification testing 1.4.1.2 Manufacturer’s certification 1.4.1.2 Manufacturer’s certification 1.4.1.3 Additional testing 1.4.1.3 Additional testing 1.5—Quality assurance 1.5—Quality assurance 1.5.1 Metering accuracy 1.5.1 Metering accuracy 1.5.2 Qualification test for metering accuracy 1.5.2 Qualification test for metering accuracy 1.5.2.1 1.5.2.1 |
5 | 1.5.2.1.a 1.5.2.1.a 1.5.2.1.b 1.5.2.1.b 1.5.2.1.c 1.5.2.1.c 1.5.2.1.d 1.5.2.1.d 1.5.2.1.e 1.5.2.1.e 1.5.2.2 1.5.2.2 1.5.3 Qualification tests for mixing effectiveness of equipment 1.5.3 Qualification tests for mixing effectiveness of equipment 1.5.4 Qualification of injection procedures 1.5.4 Qualification of injection procedures 1.5.4.1 Test injection 1.5.4.1 Test injection 1.5.5 Quality control 1.5.5 Quality control 1.5.5.1 Metering accuracy tests for continuous mixing 1.5.5.1 Metering accuracy tests for continuous mixing 1.5.5.2 Metering accuracy test for batch mixing 1.5.5.2 Metering accuracy test for batch mixing 1.5.5.3 Injection adhesive 1.5.5.3 Injection adhesive 1.5.6 Daily log 1.5.6 Daily log 1.5.7 Acceptance 1.5.7 Acceptance 1.5.7.1 Acceptance criteria 1.5.7.1 Acceptance criteria |
6 | 1.5.7.2 Core testing 1.5.7.2 Core testing 1.6—Delivery and storage of materials 1.6—Delivery and storage of materials 1.6.1 Delivery 1.6.1 Delivery 1.6.2 Storage 1.6.2 Storage 1.7—Safety and environmental precautions 1.7—Safety and environmental precautions 1.7.1 1.7.1 SECTION 2— MATERIALS SECTION 2— MATERIALS 2.1— Surface seal 2.1— Surface seal 2.2—Injection adhesives 2.2—Injection adhesives 2.2.1 Injection adhesives for cracks that can be sealed on all faces 2.2.1 Injection adhesives for cracks that can be sealed on all faces 2.2.2 Injection adhesives for cracks that cannot be sealed on all faces 2.2.2 Injection adhesives for cracks that cannot be sealed on all faces SECTION 3— EXECUTION SECTION 3— EXECUTION 3.1— Evaluation and preparation 3.1— Evaluation and preparation 3.1.1 Crack width 3.1.1 Crack width 3.1.2 Crack movement 3.1.2 Crack movement 3.1.3 Crack preparation 3.1.3 Crack preparation 3.1.3.1 3.1.3.1 3.1.3.2 Water in cracks 3.1.3.2 Water in cracks 3.1.3.3 Ice in cracks 3.1.3.3 Ice in cracks 3.1.3.4 Temperature of the concrete 3.1.3.4 Temperature of the concrete |
7 | 3.2—Test injection 3.2—Test injection 3.3—Surface sealing 3.3—Surface sealing 3.3.1 Surface seals 3.3.1 Surface seals 3.4—Injection 3.4—Injection 3.4.1 Degree of filling 3.4.1 Degree of filling 3.5—Cleanup 3.5—Cleanup 3.5.1 Surface seal and ports 3.5.1 Surface seal and ports 3.5.2 Spills and leaks 3.5.2 Spills and leaks FOREWORD TO CHECKLISTS FOREWORD TO CHECKLISTS |
8 | MANDATORY REQUIREMENTS CHECKLIST MANDATORY REQUIREMENTS CHECKLIST OPTIONAL REQUIREMENTS CHECKLIST OPTIONAL REQUIREMENTS CHECKLIST |
9 | SUBMITTAL CHECKLIST SUBMITTAL CHECKLIST |