Shopping Cart

No products in the cart.

ACI 503.7 07 2007

$20.85

503.7-07 Specification for Crack Repair by Epoxy Injection

Published By Publication Date Number of Pages
ACI 2007 11
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This Specification gives requirements for repairing cracks in concrete by injection of two-component epoxy-resin adhesive. Keywords: adhesive; concrete; crack; epoxy; repair injection; sealer.

PDF Catalog

PDF Pages PDF Title
3 NOTES TO SPECIFIER
NOTES TO SPECIFIER
PREFACE
PREFACE
4 CONTENTS
CONTENTS
SECTION 1— GENERAL
SECTION 1— GENERAL
1.1— Scope
1.1— Scope
1.2—Definitions
1.2—Definitions
1.3—Reference standards
1.3—Reference standards
1.4—Submittals
1.4—Submittals
1.4.1 Injection adhesives
1.4.1 Injection adhesives
1.4.1.1 Qualification testing
1.4.1.1 Qualification testing
1.4.1.2 Manufacturer’s certification
1.4.1.2 Manufacturer’s certification
1.4.1.3 Additional testing
1.4.1.3 Additional testing
1.5—Quality assurance
1.5—Quality assurance
1.5.1 Metering accuracy
1.5.1 Metering accuracy
1.5.2 Qualification test for metering accuracy
1.5.2 Qualification test for metering accuracy
1.5.2.1
1.5.2.1
5 1.5.2.1.a
1.5.2.1.a
1.5.2.1.b
1.5.2.1.b
1.5.2.1.c
1.5.2.1.c
1.5.2.1.d
1.5.2.1.d
1.5.2.1.e
1.5.2.1.e
1.5.2.2
1.5.2.2
1.5.3 Qualification tests for mixing effectiveness of
equipment
1.5.3 Qualification tests for mixing effectiveness of
equipment
1.5.4 Qualification of injection procedures
1.5.4 Qualification of injection procedures
1.5.4.1 Test injection
1.5.4.1 Test injection
1.5.5 Quality control
1.5.5 Quality control
1.5.5.1 Metering accuracy tests for continuous mixing
1.5.5.1 Metering accuracy tests for continuous mixing
1.5.5.2 Metering accuracy test for batch mixing
1.5.5.2 Metering accuracy test for batch mixing
1.5.5.3 Injection adhesive
1.5.5.3 Injection adhesive
1.5.6 Daily log
1.5.6 Daily log
1.5.7 Acceptance
1.5.7 Acceptance
1.5.7.1 Acceptance criteria
1.5.7.1 Acceptance criteria
6 1.5.7.2 Core testing
1.5.7.2 Core testing
1.6—Delivery and storage of materials
1.6—Delivery and storage of materials
1.6.1 Delivery
1.6.1 Delivery
1.6.2 Storage
1.6.2 Storage
1.7—Safety and environmental precautions
1.7—Safety and environmental precautions
1.7.1
1.7.1
SECTION 2— MATERIALS
SECTION 2— MATERIALS
2.1— Surface seal
2.1— Surface seal
2.2—Injection adhesives
2.2—Injection adhesives
2.2.1 Injection adhesives for cracks that can be sealed on all
faces
2.2.1 Injection adhesives for cracks that can be sealed on all
faces
2.2.2 Injection adhesives for cracks that cannot be sealed
on all faces
2.2.2 Injection adhesives for cracks that cannot be sealed
on all faces
SECTION 3— EXECUTION
SECTION 3— EXECUTION
3.1— Evaluation and preparation
3.1— Evaluation and preparation
3.1.1 Crack width
3.1.1 Crack width
3.1.2 Crack movement
3.1.2 Crack movement
3.1.3 Crack preparation
3.1.3 Crack preparation
3.1.3.1
3.1.3.1
3.1.3.2 Water in cracks
3.1.3.2 Water in cracks
3.1.3.3 Ice in cracks
3.1.3.3 Ice in cracks
3.1.3.4 Temperature of the concrete
3.1.3.4 Temperature of the concrete
7 3.2—Test injection
3.2—Test injection
3.3—Surface sealing
3.3—Surface sealing
3.3.1 Surface seals
3.3.1 Surface seals
3.4—Injection
3.4—Injection
3.4.1 Degree of filling
3.4.1 Degree of filling
3.5—Cleanup
3.5—Cleanup
3.5.1 Surface seal and ports
3.5.1 Surface seal and ports
3.5.2 Spills and leaks
3.5.2 Spills and leaks
FOREWORD TO CHECKLISTS
FOREWORD TO CHECKLISTS
8 MANDATORY REQUIREMENTS CHECKLIST
MANDATORY REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
9 SUBMITTAL CHECKLIST
SUBMITTAL CHECKLIST
ACI 503.7 07 2007
$20.85